Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, Defense-Wide agencies are requesting $125.1M for Long Range Discrimination Radar (LRDR) under RDT&E program element 0604873C, up 124% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $117.1M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 95.6 |
| FY2026 | Enacted | 55.9 |
| FY2027 | Request | 125.1 |
| FY2028 | Outyear | 208.0 |
| FY2029 | Outyear | 204.1 |
| FY2030 | Outyear | 182.8 |
| FY2031 | Outyear | 144.9 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 0604873C
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 124% overall, which can hide much larger swings below.
Program Wide Support
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 38% | 47.6 |
| Government labs & warfare centers | 19% | 23.5 |
| Other / unspecified | 43% | 54.1 |
| FY2027 request | 100% | 125.1 |
Mission & acquisition strategy
The LRDR program is a crucial component of the Missile Defense Agency (MDA) mission, playing a significant role in the development and deployment of a layered Missile Defense System. This system is designed to defend the homeland from missile attacks of all ranges, in all phases of flight. The LRDR's contribution provides persistent long-range midcourse discrimination, precision tracking and hit assessment, thereby enhancing the Missile Defense System Homeland Defense Capability. Additionally, the LRDR program supports the United States Space Force's (USSF) Space Domain Awareness (SDA) and Space Object Identification (SOI) mission area, further underlining its importance.
The approved LRDR acquisition strategy incorporates robust acquisition practices to ensure delivery of a best-value solution that meets mission performance requirements and reduces lifecycle costs. The MDA awarded a fixed-price incentive contract to Lockheed Martin (LM) Corporation of Moorestown, NJ, on October 21, 2015, to design, develop, manufacture, integrate and test, and field the LRDR prime mission equipment. The prime contract included other fixed-price and cost-reimbursable line items and options to balance acquisition costs and risks. Performance and cost incentives were included to motivate contractor performance.
- Product Development
- Support
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604873C.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksLong Range Discrim Radar (LRDR) — one RDT&E project inside PE 0604873C. Congressional marks are recorded on the program element, not on a project.
Project MD96 — Long Range Discrim Radar (LRDR) — requests $121.1M in FY2027, 97% of the $125.1M requested for program element 0604873C. Year over year it grows 125% against FY2026.
Project MD96 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 91.7 |
| FY2026 | Enacted | 53.8 |
| FY2027 | Request | 121.1 |
| FY2028 | Outyear | 201.6 |
| FY2029 | Outyear | 196.9 |
| FY2030 | Outyear | 175.6 |
| FY2031 | Outyear | 139.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Accelerate delivery of the LRDR software required to track and discriminate advanced threats. - Initiate Model Based Systems Engineering (MBSE) by creating initial models for radar simulations and mitigating legacy document-centric systems to MBSE. - Initiate monthly containerized software deliveries to support system-level development…
Read the FY2027 plan →Named performers on project MD96
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MD96 buys
The LRDR program is a crucial component of the Missile Defense Agency (MDA) mission, playing a significant role in the development and deployment of a layered Missile Defense System. This system is designed to defend the homeland from missile attacks of all ranges, in all phases of flight. The LRDR's contribution provides persistent long-range midcourse discrimination, precision tracking and hit assessment, thereby enhancing the Missile Defense System Homeland Defense Capability. Additionally, the LRDR program supports the United States Space Force's (USSF) Space Domain Awareness (SDA) and Space Object Identification (SOI) mission areas, further underlining its importance. The LRDR Program Element includes the requirements to design, develop, integrate, deliver, field, and sustain the LRDR. The LRDR operates in the S-band frequency with a scalable and open systems architecture to mitigate evolving threats and integrates into the Missile Defense System through the Command and Control, Battle Management, and Communications (C2BMC) system. The LRDR will incorporate discrimination improvements to enhance its effectiveness against advancing threats by discriminating and identifying re-entry vehicles with a higher degree of confidence to improve system performance and conserve ground-based interceptor inventory. The LRDR is comprised of an equipment shelter, two radar array faces, a mission control facility for radar operations, and supporting facilities and infrastructure. The Secretary of the Air Force approved Clear Space Force Station (CSFS), formerly known as Clear Air Force Station, AK as the LRDR site. The USSF Space Operations Command is the designated Lead Major Command. LRDR completed initial fielding on December 6, 2021. MDA pursued an incremental fielding approach in cooperation with the Northern Command, the Space Command, and the USSF. Early use fielding of the LRDR SDA capability occurred on March 27, 2024. LRDR was added to the Missile Defense System Operational Capability List (OCL) for SDA on December 20, 2024. LRDR Homeland Defense capability is planned to be added to the OCL in 3Q FY 2025. Operational Acceptance (OA) by the USSF is scheduled for 4Q fiscal year (FY) 2025 following the completion of the LRDR Homeland Defense trial period and the operational Flight Test Other (FTX)-26a.
- Product Development
- Support
Program Wide Support — one RDT&E project inside PE 0604873C. Congressional marks are recorded on the program element, not on a project.
Project MD40 — Program Wide Support — requests $4.0M in FY2027, 3.2% of the $125.1M requested for program element 0604873C. Year over year it grows 92% against FY2026.
Project MD40 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 3.9 |
| FY2026 | Enacted | 2.1 |
| FY2027 | Request | 4.0 |
| FY2028 | Outyear | 6.4 |
| FY2029 | Outyear | 7.2 |
| FY2030 | Outyear | 7.2 |
| FY2031 | Outyear | 6.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change - Increase from FY 2026 to FY 2027 provides the PWS allocation on a pro-rata basis across multiple Agency PE's each FY based on the total Agency budget and, therefore, fluctuates per PE by FY.
What project MD40 buys
PWS contains non-headquarters management costs in support of Missile Defense Agency (MDA) functions and activities across the entire Missile Defense System. These functions include Government Civilians and Contract Support Services. This effort provides integrity and oversight of the Missile Defense System, as well as supports MDA in the development and evaluation of technologies that will respond to the changing threat. Additionally, PWS includes personnel to support global deployments performing deployment site preparation and activation, and provides facility capabilities for MDA Executing Agent locations worldwide. Other MDA wide costs include: physical and technical security; civilian drug testing; audit readiness; the Science, Technology, Engineering, and Mathematics (STEM) program; legal services and settlements; travel and agency training; office, equipment, vehicle, and warehouse leases; utilities and base operations across multiple geographic locations; commercial and ancillary facility services; management of all facility aspects regardless of lifecycle stage; supplies and maintenance; compliance with statutory environmental requirements; data and unified communications support; materiel and readiness and central property management of equipment; Facilities Sustainment, Restoration and Modernization (FSRM) program (formerly Real Property Maintenance) to keep the Department's inventory of facilities in good working order; and similar operating expenses. PWS is allocated on a pro-rata basis across most Agency PEs and, therefore, fluctuates per PE by FY based on the total Agency budget in that FY.
- Support