RDT&E Program Element · President's Budget PB2027

Ballistic Missile Defense Sensors

PE 0603884C·Defense-Wide·Approp. 0400 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$865.4M
⚑ Contested — House approps cuts 28%
HitchAI read

Defense-Wide funding ramps 377% to a $865.4M request in FY2027. In the FY2027 defense authorization, the House added 0.3% (to $868.4M); the Senate funded it in full; House appropriators cut 28% (to $625.8M). RTX / Raytheon leads the industry work.

FY2027 Request
$865.4M
▲ 377% vs FY2026
House approps mark
$625.8M
▼ $239.6M vs request
FY2026 Enacted
$181.3M
In law

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, Defense-Wide agencies are requesting $865.4M for Ballistic Missile Defense Sensors under RDT&E program element 0603884C, up 377% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $625.8M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2505007500226.7FY25ACTUAL181.3FY26ENACTED865.4FY27REQUEST897.5FY28720.4FY29534.5FY30723.6FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual226.7
FY2026Enacted181.3
FY2027Request865.4
FY2028Outyear897.5
FY2029Outyear720.4
FY2030Outyear534.5
FY2031Outyear723.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0603884C

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 377% overall, which can hide much larger swings below.

The whole program

BMDS is funded on 5 lines across 2 appropriations

This page shows $808.7M of BMDS, 34% of the program's $2.39B FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
BMDS Test ProgramRDT&EDefense-Wide1,023.4
BMDS Targets ProgramRDT&EDefense-Wide493.8
BMDS Radars TestRDT&EDefense-Wide50.9
BMDS SensorsProcurementDefense-Wide17.8
BMDS totalDefense-Wide2,394.6

Lines whose title names the program. 6 further lines only mention BMDS in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$865.4M
House NDAA (HASC)HASC
$868.4M +$3.0M · +0.3%
Senate NDAA (SASC)SASC
$865.4M full · +$0
House Approps (HAC-D)HAC_D
$625.8M −$239.6M · −28%
▲ $242.6M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

RTX / Raytheon
$167.2M · 19%
Basic Development Program - X-Band Software Enhancements/Development · CPAF
039664375 - TAMERAN GRAPHIC SYSTEMS
$91.6M · 11%
Capability Development Program - Various
Where FY2027 funding flowsShare$M
Industry primes36%315.6
Government labs & warfare centers18%154.5
Other / unspecified46%395.3
FY2027 request100%865.4
See RTX / Raytheon's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Missile Defense System network of layered sensors provides essential situational awareness and fire control data for the command and control of Missile Defense System weapon systems, such as Ground-Based Midcourse Defense (GMD) and Aegis Based Defense. The suite of remote ground-based sensors provides missile defense threat data through all phases of missile flight. This data enables layered detection and tracking of missile targets, providing fire-control quality position, velocity, and discrimination data through GMD Fire Control, or Command and Control, Battle Management and Communications (C2BMC).

The Radar Development Contract (RDC) awarded on November 1, 2017, supports the X-Band Radars (XBR). Missile Defense System capability and performance requirements, which underpin continuing XBR development requirements, include, but are not limited to, the AN/TPY-2 radar and the SBX radar. These requirements stem directly from formal Warfighter requirements developed in the United States Space Command-led Warfighter involvement process.

Project MD11, MD40, MC11 — BMDS Radars
  • Product Development
  • Support
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0603884C is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what RTX / Raytheon has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603884C (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Ballistic Missile Defense Sensors (PE 0603884C)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603884C
Machine access
Markdown twin /programs/0603884C.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$808.7M
▲ 472% vs FY2026
FY2026 Enacted
$141.5M
▼ 29% vs FY2025
FY2025 Actual
$200.0M
Prior year

BMDS Radars — one RDT&E project inside PE 0603884C. Congressional marks are recorded on the program element, not on a project.

Project MD11 — BMDS Radars — requests $808.7M in FY2027, 93% of the $865.4M requested for program element 0603884C. Year over year it grows 472% against FY2026.

Funding trajectory

Project MD11 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2505007500200.0FY25ACTUAL141.5FY26ENACTED808.7FY27REQUEST848.4FY28672.7FY29491.0FY30670.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual200.0
FY2026Enacted141.5
FY2027Request808.7
FY2028Outyear848.4
FY2029Outyear672.7
FY2030Outyear491.0
FY2031Outyear670.9
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Basic Development Program▲ 11%
FY2025 actual$29.5M
FY2026 enacted$25.7M
FY2027 request$28.5M

- Complete development, testing, and software trouble report resolution CX 7.0 software.

FY2025 actual$50.9M
FY2026 enacted$27.8M
FY2027 request$159.3M

- Initiate development of high-fidelity Digital Wrapped Tactical Code models for AN/TPY-2 and SBX to support Missile Defense System element development and Warfighter Exercises and Training. - Procure updated hardware for high fidelity Hardware in the Loop models to meet increased performance required for advanced capabilities in SBX and…

Read the FY2027 plan →
FY2025 actual$63.3M
FY2026 enacted$38.6M
FY2027 request$439.9M

- Continue development, integration, and test of Arbitrary Waveform and advanced signal processing capability for the AN/TPY-2 CX 7.0 baseline. - Initiate a rapid prototyping project for a minimum of two approaches to examine, develop, and implement innovative technologies for search, track, and discrimination of threats and electronic…

Read the FY2027 plan →
Sensors Directorate Operations▲ 90%
FY2025 actual$56.3M
FY2026 enacted$49.4M
FY2027 request$93.7M

Increase from FY 2026 to FY 2027 provides additional midcourse radar engineering services and information technology (IT) services, including IT software, end user support services, and cloud computing to ensure continued program operations. Additionally, PE 0603881C funding transferred to PE 0603884C as a result of THAAD weapons system…

Missile Defense System - Next: Electromagnetic Protection (EP)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$76.4M

- Initiate hardware and software upgrades for forward-based mode AN/TPY-2 radar electronic protection and discrimination capability improvements.

Missile Defense System - Next: Upgraded UEWR AlgorithmsNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$11.0M

- Award AOC development contract and initiate development of new threat object classification algorithms. - Begin software integration activities with Space Systems Command to enable seamless transition of AOC software updates into the UEWR Mission Application Software.

Project MD11 — every activity in full →
Who's building it

Named performers on project MD11

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$156.6M · 19%
039664375 - TAMERAN GRAPHIC SYSTEMS
$91.6M · 11%
JACOBS
$16.4M · 2.0%
Lockheed Martin
$6.1M · 0.8%
Project detail

What project MD11 buys

The Missile Defense System Radars project includes developing future Forward-based Mode Army Navy/Transportable Radar Surveillance and Control-2 (AN/TPY-2), United States Space Force (USSF) COBRA DANE, Long Range Discrimination Radar (LRDR), Sea Based X-Band Radar (SBX), Persistent Discrimination Radar in southern United State (U.S.), and USSF Upgraded Early Warning Radar (UEWR) System capabilities through system engineering, software development, and testing support. Modeling and Simulation (M&S) efforts include enhanced sensor models, development of Radio Frequency scene generators, integration of simulations into the Missile Defense System M&S architecture, and Verification, Validation, and Certification of radar models. This project also funds participation and support for Missile Defense System ground and flight test campaigns and Warfighter games and exercises. This project provides the development of discrimination advanced algorithms for Missile Defense System radars to counter evolving threats. The discrimination improvement effort will develop and field integrated element capabilities to improve the Missile Defense System's ability to identify lethal and non-lethal objects. This project will continue the development of discrimination improvement midterm design and test support for Missile Defense System radars and far-term trade analysis and planning. The funds requested in this PE provide both legacy and Global Missile Defense Capability development for the United States, its deployed forces, allies, and partners. The capabilities funded by this budget request are complementary to the architecture funded by the Golden Dome Program's separate budget request and together fulfill the President's Executive Order 14186. The President's January 27, 2025, Executive Order established a goal of protecting the U.S. citizens, safeguarding critical infrastructure, and securing second-strike capability against missile attack from any adversary. This program and budget in addition to the budget requested by the Golden Dome Program Office reflects the changes necessary to protect the U.S. against ballistic, hypersonic, cruise, and other advanced missile threats.

R-3 lines of work
  • Product Development
  • Support
  • Management Services
FY2027 Request
$35.1M
▲ 63% vs FY2026
FY2026 Enacted
$21.6M
▲ 175% vs FY2025
FY2025 Actual
$7.9M
Prior year

Program-Wide Support — one RDT&E project inside PE 0603884C. Congressional marks are recorded on the program element, not on a project.

Project MD40 — Program-Wide Support — requests $35.1M in FY2027, 4.1% of the $865.4M requested for program element 0603884C. Year over year it grows 63% against FY2026.

Funding trajectory

Project MD40 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2507.9FY25ACTUAL21.6FY26ENACTED35.1FY27REQUEST27.6FY2825.4FY2920.9FY3029.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual7.9
FY2026Enacted21.6
FY2027Request35.1
FY2028Outyear27.6
FY2029Outyear25.4
FY2030Outyear20.9
FY2031Outyear29.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Program Wide Support▲ 63%
FY2025 actual$7.9M
FY2026 enacted$21.6M
FY2027 request$35.1M

- Increase from FY 2026 to FY 2027 provides the PWS allocation on a pro-rata basis across multiple Agency PE's each FY based on the total Agency budget and, therefore, fluctuates per PE by FY.

Project MD40 — every activity in full →
Who's building it

Named performers on project MD40

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

HUNTSVILLE REHABILITATION FOUNDATION
$7.4M · 21%
STRATEGIC ALLIANCE BUSINESS GROUP
$0.2M · 0.7%
Project detail

What project MD40 buys

PWS contains non-headquarters management costs in support of Missile Defense Agency (MDA) functions and activities across the entire Missile Defense System. These functions include Government Civilians and Contract Support Services. This effort provides integrity and oversight of the Missile Defense System as well as supports MDA in the development and evaluation of technologies that will respond to the changing threat. Additionally, PWS includes personnel to support global deployments performing deployment site preparation and activation, and provides facility capabilities for MDA Executing Agent locations worldwide. Other MDA wide costs include: physical and technical security; civilian drug testing; audit readiness; the Science, Technology, Engineering, and Mathematics (STEM) program; legal services and settlements; travel and agency training; office, equipment, vehicle, and warehouse leases; utilities and base operations across multiple geographic locations; commercial and ancillary facility services; management of all facility aspects regardless of lifecycle stage; supplies and maintenance; compliance with statutory environmental requirements; data and unified communications support; materiel and readiness and central property management of equipment; Facilities Sustainment, Restoration and Modernization (FSRM) program (formerly Real Property Maintenance) to keep the Department's inventory of facilities in good working order; and similar operating expenses. PWS is allocated on a pro-rata basis across most Agency PEs and, therefore, fluctuates per PE by FY based on the total Agency budget in that FY.

R-3 lines of work
  • Support
  • Management Services
FY2027 Request
$21.7M
▲ 19% vs FY2026
FY2026 Enacted
$18.3M
▼ 3.0% vs FY2025
FY2025 Actual
$18.8M
Prior year

Cyber Operations — one RDT&E project inside PE 0603884C. Congressional marks are recorded on the program element, not on a project.

Project MC11 — Cyber Operations — requests $21.7M in FY2027, 2.5% of the $865.4M requested for program element 0603884C. Year over year it grows 19% against FY2026.

Funding trajectory

Project MC11 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

018.8FY25ACTUAL18.3FY26ENACTED21.7FY27REQUEST21.5FY2822.3FY2922.6FY3023.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual18.8
FY2026Enacted18.3
FY2027Request21.7
FY2028Outyear21.5
FY2029Outyear22.3
FY2030Outyear22.6
FY2031Outyear23.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$18.8M
FY2026 enacted$18.3M
FY2027 request$21.7M

- Ensure compliance with cyber security mandates to maintain continued authorization to operate. - Assess, implement, document, and validate cybersecurity control families for representative systems comprising computing and logic bearing components to support the Development, Test, Training, and Operational Systems.

Read the FY2027 plan →
Project MC11 — every activity in full →
Who's building it

Named performers on project MC11

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$10.6M · 49%
Lockheed Martin
$3.8M · 17%
GRYPHON
$3.0M · 14%
Rothe Ares JV
$1.2M · 5.6%
Project detail

What project MC11 buys

Sustain the Department of Defense Instruction (DoDI) 8510.01 Risk Management Framework (RMF) for Department of War (DoW) Information Technology (IT) requirement for the MDA and conduct Security Control Assessments (SCA) activities, analysis of validation results, risk assessments, and reviews of proposed Program Manager/Information System Security Manager (PM/ISSM) Plans of Action and Milestones (POA&M) for the Missile Defense Agency (MDA) Ground Sensors mission and support systems. It also includes support for external cybersecurity assessments and penetration testing of the Ground Sensors mission systems, both in laboratory developmental testing and during ground test activities, in accordance with Director, Operational Test and Evaluation directives and the Integrated Master Test Plan. It maintains the Assessment and Authorization (A&A) data repository, capturing the RMF documentation (artifacts, validation results, Cybersecurity Risk Assessment results, cybersecurity scorecard, and Authorizing Official (AO) authorization decisions) and POA&M for all MDA information systems. It positions Ground Sensors assets to complete the transition to National Institute of Standards and Technology Special Publication 800-53 Revision 5 requirements (i.e. RMF 2.0) once DoW requirements and timelines are finalized. This project supports aligning, developing, and implementing an integrated Tier 2 Cyber Security Service Provider (CSSP) capability on the Ground Sensors mission systems under the DoW Cybersecurity Discipline Implementation Plan and DoDI 8530.01 Cybersecurity Activities Support to DoW Information Network Operations. Provides the monitoring, prioritization, and tracking of Cybersecurity mitigation detailed in Information Technology security POA&Ms. The activities include preparation of A&A documentation and accreditation recommendations to the MDA Senior Information Security Officer/SCA and AO. Independent Verification and Validation team actions ensure the availability, integrity, authentication, confidentiality, and non-repudiation of the MDA mission, test, and administrative systems. These activities are necessary to comply with the Federal Information Security Management Act.

R-3 lines of work
  • Product Development
  • Support