R-2A Activity · President's Budget PB2027

BMDS Radars Modeling & Simulation (M&S)

Activity a1·Project MD11 — BMDS Radars·PE 0603884C·Defense-Wide
FY2027 Request
$159.3M
▲ 473% vs FY2026
HitchAI read

This activity requests $159.3M in FY2027, 20% of project MD11, up 473% on FY2026. The R-2A exhibit describes it across FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$159.3M
▲ 473% vs FY2026
FY2026 Enacted
$27.8M
▼ 45% vs FY2025
FY2025 Actual
$50.9M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project MD11 of PE 0603884C. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Initiate development of high-fidelity Digital Wrapped Tactical Code models for AN/TPY-2 and SBX to support Missile Defense System element development and Warfighter Exercises and Training. - Procure updated hardware for high fidelity Hardware in the Loop models to meet increased performance required for advanced capabilities in SBX and AN/TPY-2. - Initiate Model Based Systems Engineering (MBSE) by creating initial models for radar simulations, SBX radar behavior, antenna mount, functional representation validation, and mitigating legacy document-centric systems to MBSE. - Initiate support for monthly containerized software deliveries. - Procure upgraded digital representation of UEWR assets to enable ground test and cybersecurity test activities.

FY2026 to FY2027 change

Increase from FY 2026 to FY 2027 provides for: - Radar M&S development to include hardware acquisition for the Simulation Interface Units, Ground Based Radar Digitization Hardware-In-the-Loop testing representations (Qty 5), AN/TPY-2 Forward Based Mode, and SBX, enabling representation of assets in Ballistic Missile Defense (BMD) ground tests - Radar digital engineering integration efforts to include validation and verification of monthly containerized software in the cloud, enabling early development testing across the BMD. - Initiation of MBSE by creating initial models for radar simulations, SBX radar behavior, antenna mount, functional representation validation, and mitigating legacy document-centric systems to MBSE.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

50100150050.9FY25ACTUAL27.8FY26ENACTED159.3FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual50.9
FY2026Enacted27.8
FY2027Request159.3

This activity is 20% of project MD11's FY2027 request and 18% of PE 0603884C's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

6 activities in project MD11

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Capability Development Program$439.9M ▲ 1039%
BMDS Radars Modeling & Simulation (M&S) — this activity$159.3M ▲ 473%
Sensors Directorate Operations$93.7M ▲ 90%
Missile Defense System - Next: Electromagnetic Protection (EP)$76.4M NEW
Basic Development Program$28.5M ▲ 11%
Missile Defense System - Next: Upgraded UEWR Algorithms$11.0M NEW
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0603884C, project MD11 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0603884C/MD11/a1.md · MCP mcp.hitchintel.combudget_get_activity