RDT&E Project · President's Budget PB2027

LHA(R) FLT Design and Total Ship Integration

FY2027 Request
$19.4M
▼ 30% vs FY2026
HitchAI read

Project 2465 — LHA(R) FLT Design and Total Ship Integration requests $19.4M in FY2027, 100% of the $19.4M requested for program element 0604567N, down 30% on FY2026. 1 R-2A activity decomposes the request. HII is the largest named R-3 performer at $1.4M, 7.2% of the project's FY2027 R-3 total.

FY2027 Request
$19.4M
▼ 30% vs FY2026
FY2026 Enacted
$27.6M
▲ 141% vs FY2025
FY2025 Actual
$11.5M
Prior year
Project detail

What project 2465 buys

This project provides the contract design, development, and testing efforts for the Amphibious Assault Ship General Purpose Replacement Program - LHA(R). The LHA(R) is a ship construction program designed to: (1) provide a functional replacement for the Amphibious Assault Ships which reached the end of their extended service lives (2) be a key platform in the Amphibious Readiness Group (ARG) of the future and (3) provide for an affordable and sustainable amphibious ship development program. LHA(R) ships will provide forward presence and power projection as an integral part of Joint, inter-agency, and multi-national maritime expeditionary forces. Additionally, LHA(R) will be designed to operate for sustained periods in transit to and operations in an Amphibious Objective Area to include the embarkation, deployment, and landing of a Marine Landing Force in an assault with landing craft, helicopters and tilt rotors (MV-22) supported by Joint Strike Fighters (F-35B).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 2465 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25011.5FY25ACTUAL27.6FY26ENACTED19.4FY27REQUEST22.0FY283.9FY293.8FY303.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual11.5
FY2026Enacted27.6
FY2027Request19.4
FY2028Outyear22.0
FY2029Outyear3.9
FY2030Outyear3.8
FY2031Outyear3.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$11.5M
FY2026 enacted$27.6M
FY2027 request$19.4M

LHA (R): Continue development of the MCS LBTE Continue LHA class obsolescence research and system engineering Continue LFT&E efforts Continue Lead Ship OT Campaign (Air Warfare Ship Self Defense) T&E events Continue Planning for Tiltrotor and Rotary Wing Dynamic Interface Testing (DIT) Complete Dynamic Interface-Virtual Environment…

Read the FY2027 plan →
Who's building it

Named performers on project 2465

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

HII
$1.4M · 7.2%