Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $19.4M for Ship Contract Design/ Live Fire T&E under RDT&E program element 0604567N, down 45% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 13.2 |
| FY2026 | Enacted | 35.6 |
| FY2027 | Request | 19.4 |
| FY2028 | Outyear | 22.0 |
| FY2029 | Outyear | 3.9 |
| FY2030 | Outyear | 3.9 |
| FY2031 | Outyear | 3.9 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
3 projects roll up into PE 0604567N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -45% overall, which can hide much larger swings below.
Ship Contract Design
Congressional Adds
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 7.2% | 1.4 |
| Government labs & warfare centers | 18% | 3.5 |
| Other / unspecified | 75% | 14.5 |
| FY2027 request | 100% | 19.4 |
Mission & acquisition strategy
This Program Element (PE) directly supports the Navy's Shipbuilding Plan by providing for the development of engineering, programmatic and acquisition documentation including ship specifications (including performance specifications) and contractual documentation associated with acquisition of Navy ships. This PE also supports the Congressionally mandated Live Fire Test and Evaluation (LFT&E) program for new ship designs.
LHA 6 Advance Procurement (AP) and Long-Lead Time Material (LLTM) was awarded on a sole source basis to Huntington Ingalls Inc., formerly Northrop Grumman Shipbuilding, on 15 July 2005; LHA 6 Detail Design and Construction (DD&C) was awarded on 1 June 2007. The AP and LLTM efforts were subsumed by the Fixed Price Incentive, Firm Target DD&C contract. LHA 7 AP and LLTM was awarded on a sole source basis to Huntington Ingalls Inc., formerly Northrop Grumman Shipbuilding, on 30 June 2010; LHA 7 DD&C was awarded on 31 May 2012. The AP and LLTM efforts were subsumed by the Fixed Price Incentive, Firm Target DD&C contract.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what HII has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604567N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksLHA(R) FLT Design and Total Ship Integration — one RDT&E project inside PE 0604567N. Congressional marks are recorded on the program element, not on a project.
Project 2465 — LHA(R) FLT Design and Total Ship Integration — requests $19.4M in FY2027, 100% of the $19.4M requested for program element 0604567N. Year over year it falls 30% against FY2026.
Project 2465 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 11.5 |
| FY2026 | Enacted | 27.6 |
| FY2027 | Request | 19.4 |
| FY2028 | Outyear | 22.0 |
| FY2029 | Outyear | 3.9 |
| FY2030 | Outyear | 3.8 |
| FY2031 | Outyear | 3.9 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
LHA (R): Continue development of the MCS LBTE Continue LHA class obsolescence research and system engineering Continue LFT&E efforts Continue Lead Ship OT Campaign (Air Warfare Ship Self Defense) T&E events Continue Planning for Tiltrotor and Rotary Wing Dynamic Interface Testing (DIT) Complete Dynamic Interface-Virtual Environment…
Read the FY2027 plan →Named performers on project 2465
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2465 buys
This project provides the contract design, development, and testing efforts for the Amphibious Assault Ship General Purpose Replacement Program - LHA(R). The LHA(R) is a ship construction program designed to: (1) provide a functional replacement for the Amphibious Assault Ships which reached the end of their extended service lives (2) be a key platform in the Amphibious Readiness Group (ARG) of the future and (3) provide for an affordable and sustainable amphibious ship development program. LHA(R) ships will provide forward presence and power projection as an integral part of Joint, inter-agency, and multi-national maritime expeditionary forces. Additionally, LHA(R) will be designed to operate for sustained periods in transit to and operations in an Amphibious Objective Area to include the embarkation, deployment, and landing of a Marine Landing Force in an assault with landing craft, helicopters and tilt rotors (MV-22) supported by Joint Strike Fighters (F-35B).
- Product Development
- Support
- Test and Evaluation
- Management Services
Ship Contract Design — one RDT&E project inside PE 0604567N. Congressional marks are recorded on the program element, not on a project.
Project 1803 — Ship Contract Design — requests $0.0M in FY2027, 0.0% of the $19.4M requested for program element 0604567N. Year over year it falls 100% against FY2026.
Project 1803 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 1.7 |
| FY2026 | Enacted | 0.8 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change Innovation engineering efforts for DDG MOD 2.0 will conclude in FY26 with the start of the first Depot Modernization Period (DMP) 2 which installs SPY-6(V)4 and High Efficiency Super Capacity (HESC) chillers.
FY2026 plans — current year Funding supports continued research and development efforts associated with complex design for the next generation and installation planning for DDG Modernization 2.0. Funds also support continued lab upgrades and NRE efforts for the next generation of Hull, Mechanical, and Electrical (HM&E) systems associated with DDG Modernization 2.0.
What project 1803 buys
Provides for innovation in engineering solutions for the DDG Modernization program in support of delivering added Fleet capability within Depot Modernization Periods (DMPs). Efforts include development of ship's design (e.g. ship specifications and drawings), installation and test plans, and installation / duration analysis products to evaluate and inform installation alternatives and evolve existing design processes. Supports the development of specific Navy ship design criteria and standards for newly developed technologies, new safety regulations and environmental criteria, or other legal/Congressional requirements. Conducts ship survivability studies, superstructure integrity analysis, and other analyses in support of system integration efforts.
- Product Development
- Support
Congressional Adds — one RDT&E project inside PE 0604567N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $19.4M requested for program element 0604567N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 7.2 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
The Circadian Lighting System project (CA65) is designed to address persistent readiness gaps identified by the Department of War (DoW) and the Government Accountability Office (GAO), which are caused by sailor fatigue and insufficient sleep. These issues have been shown to degrade decision-making and operational performance across the fleet. To close this gap, the Navy will deliver a fleet-ready circadian-targeted lighting system that integrates shipboard lighting retrofits, wearable sleep monitoring, individualized light-control algorithms, and secure cloud analytics. Structured training at the Surface Warfare Officers School (SWOS) and operational demonstrations will support validation and fleet adoption. This effort scales implementation across multiple ships and fleets, ultimately delivering an integrated, technology-enabled fatigue mitigation capability to enhance warfighter readiness.
- Product Development