R-2A Activity · President's Budget PB2027

Advanced Radar Threat System-Variant 3 (ARTS-V3)

Activity a0·Project 652286 — Combat Training Range Equipment·PE 0604735F·U.S. Air Force
FY2027 Request
$112.2M
▲ 1.0% vs FY2026
HitchAI read

This activity requests $112.2M in FY2027, 85% of project 652286, up 1.0% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$112.2M
▲ 1.0% vs FY2026
FY2026 Enacted
$111.1M
▼ 5.7% vs FY2025
FY2025 Actual
$117.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 652286 of PE 0604735F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

FY2027 focuses on completing manufacture, integration, test, and delivery of the ARTS-V3 X-band in FY2027 and C-band in FY2028 in order to enable production start in FY2028. Integration efforts will focus on open air testing and achieving IOC at the Nevada Test and Training Range.

FY2026 to FY2027 change

Nominal funding increase to support program office estimate.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

The focus of FY2026 is building the Production Representative Article (PRA) and conducting combined developmental/operation test activities. Activities will include but are not limited to remaining hardware purchases, fabrication of radar sub-assemblies and higher level assemblies, component-level and sub-system level testing, continued development of the command & control software, integration activities with the command & control software, software-defined threat profile development/integration, and engineering activities to reduce integration risk during open-air full system testing in FY2027.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550751000117.8FY25ACTUAL111.1FY26ENACTED112.2FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual117.8
FY2026Enacted111.1
FY2027Request112.2

This activity is 85% of project 652286's FY2027 request and 85% of PE 0604735F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

4 activities in project 652286

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Advanced Radar Threat System-Variant 3 (ARTS-V3) — this activity$112.2M ▲ 1%
P6 Combat Training System (P6CTS)$11.5M ▼ 25%
Live Mission Operations Capability (LMOC)$6.5M ▼ 28%
Advanced Radar Threat System Tech Development$2.6M ▲ 13%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0604735F, project 652286 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.