RDT&E Project · President's Budget PB2027

Scaled Onboard Electronic Attack

FY2027 Request
$64.4M
▲ 12% vs FY2026
HitchAI read

Project 3469 — Scaled Onboard Electronic Attack requests $64.4M in FY2027, 33% of the $196.8M requested for program element 0604757N, up 12% on FY2026. 2 R-2A activities decompose the request. LM is the largest named R-3 performer at $17.9M, 28% of the project's FY2027 R-3 total.

MarketAirborne Electronic Warfare

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$64.4M
▲ 12% vs FY2026
FY2026 Enacted
$57.7M
▲ 174% vs FY2025
FY2025 Actual
$21.1M
Prior year
Project detail

What project 3469 buys

Scaled Onboard Electronic Attack (SOEA) is an incremental development program by the USN to provide an advanced Electronic Attack (EA) capability against anti-ship missiles. The program is intended to be scalable for Surface Combatants with size, weight, power, and cooling (SWaP-C) constraints that cannot support AN/SLQ-32(V)7; however, it is not intended to replace AN/SLQ-32(V)7. SOEA development executes under a Middle Tier of Acquisition Rapid Prototyping acquisition strategy pursuant to Section 804 of the FY16 National Defense Authorization Act. The SOEA Middle Tier of Acquisition (MTA) leverages technology developed by the Office of Naval Research (ONR) and Naval Research Laboratory (NRL). SOEA's acquisition strategy consists of two phases: Rapid Prototyping and Rapid Fielding. SOEA Phase 1 includes prototyping of critical technology elements (CTEs) via Defense Microelectronics Agency (DMEA) contract agreements to prove out and validate critical performance capability, system architecture functionality, supportability requirements and improvements that build on the CTEs. SOEA Phase 2 will focus on fielding initial capability through the producibility of the Phase 1 prototype, continuing hardware and software improvements to meet full capability objectives, continuing external interfaces for system and platform integration, continuing training module development via the Surface Electronic Warfare Tactical Trainer (SEWTT) and completing Modeling & Simulation (M&S) to support further testing. SOEA will continue to expand the integrated shipboard combat system by providing new integrated EA capability and will be integrated with AN/SLQ-32(V)6. SOEA also includes a government software development and integration effort for a Soft-Kill Coordinator System (SKCS) to manage EA engagements. The FY27 budget request for SOEA supports the continuation of Phase 1 Rapid Prototyping, including performance testing, SEWTT training module development, Modeling & Simulation (M&S) and SKCS integration. The FY27 budget request also supports the initiation of SOEA Phase 2 Rapid Fielding which supports further land-based and environmental testing, initiates software and hardware baseline upgrades, and supports acquisition of additional prototype units.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 3469 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550021.1FY25ACTUAL57.7FY26ENACTED64.4FY27REQUEST53.9FY2839.7FY2916.8FY3017.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual21.1
FY2026Enacted57.7
FY2027Request64.4
FY2028Outyear53.9
FY2029Outyear39.7
FY2030Outyear16.8
FY2031Outyear17.1
Inside the project

2 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describe FY2027 work in enough detail to have their own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$14.4M
FY2026 enacted$44.2M
FY2027 request$36.1M

- Continue SOEA Rapid Prototype Development to prove out and validate critical performance capability, system architecture functionality, and supportability requirements. Support failure mode analyses. - Continue software support for SKCS integration. - Continue developing the SOEA training modules of SEWTT - Commence upgrades of…

Read the FY2027 plan →
FY2025 actual$6.6M
FY2026 enacted$13.5M
FY2027 request$28.3M

- Continue preliminary prototype builds and accept delivery to prove out and validate critical performance capability, system architecture functionality, and supportability requirements. - Continue testing to collect evidence for verification of SOEA requirements. - Continue platform integration studies. - Continue support of modularity…

Read the FY2027 plan →
Who's building it

Named performers on project 3469

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

LM
$17.9M · 28%
NG
$17.9M · 28%
NRL
$10.8M · 17%
APL
$4.6M · 7.1%