RDT&E Project · President's Budget PB2027

Range Radar Replacement Program (RRRP)

Project EY9·PE 0604759A — Major T&E Investment·U.S. Army·BA6
FY2027 Request
$48.9M
▲ 1.8% vs FY2026
HitchAI read

Project EY9 — Range Radar Replacement Program (RRRP) requests $48.9M in FY2027, 46% of the $106.1M requested for program element 0604759A, up 1.8% on FY2026. 1 R-2A activity decomposes the request.

FY2027 Request
$48.9M
▲ 1.8% vs FY2026
FY2026 Enacted
$48.0M
▲ 29% vs FY2025
FY2025 Actual
$37.1M
Prior year
Project detail

What project EY9 buys

In order to effect strategic overmatch on current and future battlefields, it is essential that the United States (U.S.) Army provide advanced radar system instrumentation for developmental testing. Since existing range radar instrumentation is aged beyond useful life and cannot adequately support emerging test requirements, the Range Radar Replacement Program (RRRP) recapitalizes and develops modern instrumentation radars to replace obsolete tracking and surveillance radars at U.S. Army Test and Evaluation Command's (ATEC) activities, which include: Aberdeen Test Center (ATC), MD; White Sands Test Center (WSTC), NM; and Yuma Test Center (YTC), AZ. RRRP will deliver capability in three (3) block increments: Block I will recapitalize or replace existing radar systems, Block II will develop a Long Range Radar (LRR) which is compliant with ATEC's Test Capability Requirements Document (TCRD), and Block III will develop LRRs and Medium Range Radars (MRRs) to meet ATEC Block III TCRD Addendum. The acquisition of modern instrumentation radar systems will provide the Army with critical testing data essential for the development of next generation technology and advanced system capabilities. The RRRP provides the test centers with improved radar resolution, sensitivity, accuracy, clutter suppression, and reliability. The planned solution to meet program requirements consists of four primary items: Long Range Single Object Tracking Radars (SOTR), Long Range Multiple Object Tracking Radars (MOTR), Medium Range Radars (MRR), and Short-Range Radars (SRR). The resulting systems will not only reduce operation and sustainment costs for the ranges, but will improve data collection, thus enhancing development of Army systems being tested at these ranges. The current fleet of instrumentation radars located at ATC, WSTC, and YTC has become antiquated to the extent that they are not able to support the test needs of the test centers. FY27 funds in the amount of $48.853 Million provides funding for acceptance testing of Block I instrumentation radars, continued development and acceptance testing of the Block II Long Range Instrumentation Radar prototype, and allows for continued development of Block III prototype radars.

Funding trajectory

Project EY9 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550037.1FY25ACTUAL48.0FY26ENACTED48.9FY27REQUEST49.4FY2849.8FY2950.3FY3050.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual37.1
FY2026Enacted48.0
FY2027Request48.9
FY2028Outyear49.4
FY2029Outyear49.8
FY2030Outyear50.3
FY2031Outyear50.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

EMD Phase▲ 2%
FY2025 actual$37.1M
FY2026 enacted$48.0M
FY2027 request$48.9M

Testing of Block I instrumentation radars, continued development and acceptance testing of the Block II Long Range Instrumentation Radar prototype and allows for continued development of Block III prototype radars.