RDT&E Program Element · President's Budget PB2027

Major T&E Investment

PE 0604759A·U.S. Army·Approp. 2040 — RDT&E·BA6 — RDT&E Management Support
FY2027 Request
$106.1M
Army · RDT&E
HitchAI read

U.S. Army funding falls 18% to a $106.1M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate added 19% (to $126.1M); House appropriators added 50% (to $158.8M).

FY2027 Request
$106.1M
▼ 18% vs FY2026
FY2026 Enacted
$129.5M
▲ 29% vs FY2025
FY2025 Actual
$100.2M
Prior year

Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $106.1M for Major T&E Investment under RDT&E program element 0604759A, down 18% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550751001250100.2FY25ACTUAL129.5FY26ENACTED106.1FY27REQUEST105.9FY28107.4FY29108.4FY30109.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual100.2
FY2026Enacted129.5
FY2027Request106.1
FY2028Outyear105.9
FY2029Outyear107.4
FY2030Outyear108.4
FY2031Outyear109.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

5 projects roll up into PE 0604759A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -18% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$106.1M
House NDAA (HASC)HASC
$106.1M full · +$0
Senate NDAA (SASC)SASC
$126.1M +$20.0M · +19%
House Approps (HAC-D)HAC_D
$158.8M +$52.7M · +50%
▲ $52.7M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This Program Element (PE) funds the development and acquisition of major developmental test instrumentation for the United States (U.S.) Army Test and Evaluation Command's (ATEC) test activities: White Sands Test Center (WSTC), New Mexico; Yuma Test Center (YTC), Arizona; Aberdeen Test Center (ATC), Maryland; Electronic Proving Ground (EPG), Arizona; Redstone Test Center (RTC), Alabama; and for the Reagan Test Site (RTS) at the United States Army Kwajalein Atoll (USAKA), which is managed by the Space and Missile Defense Command.

Project EY9, 984, 986, 983, FF1 — Range Radar Replacement Program (RRRP)
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604759A is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604759A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Major T&E Investment (PE 0604759A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604759A
Machine access
Markdown twin /programs/0604759A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$48.9M
▲ 1.8% vs FY2026
FY2026 Enacted
$48.0M
▲ 29% vs FY2025
FY2025 Actual
$37.1M
Prior year

Range Radar Replacement Program (RRRP) — one RDT&E project inside PE 0604759A. Congressional marks are recorded on the program element, not on a project.

Project EY9 — Range Radar Replacement Program (RRRP) — requests $48.9M in FY2027, 46% of the $106.1M requested for program element 0604759A. Year over year it grows 1.8% against FY2026.

Funding trajectory

Project EY9 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550037.1FY25ACTUAL48.0FY26ENACTED48.9FY27REQUEST49.4FY2849.8FY2950.3FY3050.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual37.1
FY2026Enacted48.0
FY2027Request48.9
FY2028Outyear49.4
FY2029Outyear49.8
FY2030Outyear50.3
FY2031Outyear50.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

EMD Phase▲ 2%
FY2025 actual$37.1M
FY2026 enacted$48.0M
FY2027 request$48.9M

Testing of Block I instrumentation radars, continued development and acceptance testing of the Block II Long Range Instrumentation Radar prototype and allows for continued development of Block III prototype radars.

Read the FY2027 plan →
Project EY9 — every activity in full →
Project detail

What project EY9 buys

In order to effect strategic overmatch on current and future battlefields, it is essential that the United States (U.S.) Army provide advanced radar system instrumentation for developmental testing. Since existing range radar instrumentation is aged beyond useful life and cannot adequately support emerging test requirements, the Range Radar Replacement Program (RRRP) recapitalizes and develops modern instrumentation radars to replace obsolete tracking and surveillance radars at U.S. Army Test and Evaluation Command's (ATEC) activities, which include: Aberdeen Test Center (ATC), MD; White Sands Test Center (WSTC), NM; and Yuma Test Center (YTC), AZ. RRRP will deliver capability in three (3) block increments: Block I will recapitalize or replace existing radar systems, Block II will develop a Long Range Radar (LRR) which is compliant with ATEC's Test Capability Requirements Document (TCRD), and Block III will develop LRRs and Medium Range Radars (MRRs) to meet ATEC Block III TCRD Addendum. The acquisition of modern instrumentation radar systems will provide the Army with critical testing data essential for the development of next generation technology and advanced system capabilities. The RRRP provides the test centers with improved radar resolution, sensitivity, accuracy, clutter suppression, and reliability. The planned solution to meet program requirements consists of four primary items: Long Range Single Object Tracking Radars (SOTR), Long Range Multiple Object Tracking Radars (MOTR), Medium Range Radars (MRR), and Short-Range Radars (SRR). The resulting systems will not only reduce operation and sustainment costs for the ranges, but will improve data collection, thus enhancing development of Army systems being tested at these ranges. The current fleet of instrumentation radars located at ATC, WSTC, and YTC has become antiquated to the extent that they are not able to support the test needs of the test centers. FY27 funds in the amount of $48.853 Million provides funding for acceptance testing of Block I instrumentation radars, continued development and acceptance testing of the Block II Long Range Instrumentation Radar prototype, and allows for continued development of Block III prototype radars.

FY2027 Request
$33.6M
▼ 16% vs FY2026
FY2026 Enacted
$40.1M
▲ 55% vs FY2025
FY2025 Actual
$25.9M
Prior year

Major Developmental Testing Instrumentation — one RDT&E project inside PE 0604759A. Congressional marks are recorded on the program element, not on a project.

Project 984 — Major Developmental Testing Instrumentation — requests $33.6M in FY2027, 32% of the $106.1M requested for program element 0604759A. Year over year it falls 16% against FY2026.

Funding trajectory

Project 984 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.9FY25ACTUAL40.1FY26ENACTED33.6FY27REQUEST34.1FY2834.2FY2934.6FY3034.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.9
FY2026Enacted40.1
FY2027Request33.6
FY2028Outyear34.1
FY2029Outyear34.2
FY2030Outyear34.6
FY2031Outyear34.9
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

EMD for the Applied Environments Modernization.▼ 100%
FY2025 actual$4.3M
FY2026 enacted$5.4M
FY2027 request

Will continue EMD phase for Applied Environments Modernization program. In FY 2025 funds in the amount of $4.331 Million will be used to continue with the purchase of equipment utilized for testing environmental effects at Yuma Test Center (YTC) and Redstone Test Center (RTC). Specific equipment to be upgraded in FY2025 includes: Large…

EMD phase contract activity for Telemetry Systems Modernization
FY2025 actual$5.9M
FY2026 enacted
FY2027 request

Funds in the amount of $6.924 Million will build upon and/or expand replacement of key infrastructure required for modernized system testing at Redstone Test Center, Yuma Test Center and White Sands Test Center. This replacement will include Commercial Off The Shelf (COTS) fixed site and mobile telemetry equipment.

FY2025 actual$15.6M
FY2026 enacted$25.2M
FY2027 request$32.7M

The Test Enterprise Network Modernization effort will continue in the engineering and manufacturing phase as an enterprise modernizing approach to the network infrastructure at the test ranges. FY 2027 funds in the amount of $33,332 Million will meet the Army Test & Evaluation command requirement to standardize, expand and improve the…

Read the FY2027 plan →
EMD for Enterprise Electromagnetic Environmental EffectsNEW
FY2025 actual
FY2026 enacted
FY2027 request$0.9M

The Enterprise Electromagnetic Effects Environment program will provide unique DoW test and evaluation capabilities in the following areas: Electromagnetic Radiation (EMR), Electromagnetic Compatibility (EMC), Electromagnetic Interference (EMI), Electrostatic Discharge (ESD), EM Radiation Hazards (EMRADHAZ), Ultra-Wideband (UWB) and…

Project 984 — every activity in full →
Project detail

What project 984 buys

This project develops and acquires major test instrumentation to perform developmental testing of weapon systems at United States Army Test and Evaluation Command's (ATEC) activities which include: Yuma Test Center (YTC), AZ; Aberdeen Test Center (ATC), MD; Electronic Proving Ground (EPG), AZ; White Sands Test Center (WSTC), NM; Redstone Test Center (RTC), AL; Cold Regions Test Center (CRTC), AK. Projects are designated as a major test program based on their visibility, assessed relative technical risk (medium high), schedule risk, cost (greater than $1.500 Million per year or $7.500 Million for the total project) and applicability to other mission areas or services. These projects are technically demanding, state of the art, unique instrumentation assets or suites to meet technology shortfalls, and generally result from development programs managed by a professional project management team. All projects are designed to support both test and training requirements, as applicable. Test Enterprise Network Modernization (TENM) will upgrade existing test data networks to ensure infrastructures are capable of providing reliable and secure transport of data and communications for ATEC test activities, as well as a revitalized fiber network. Due to limited commercial infrastructure, the cold regions have limited network connectivity. Therefore, TENM requires an edge capability along with a permanent fiber backbone on Army test ranges to ensure advanced weapon systems can operate flawlessly in extreme cold. Applied Environments Modernization (AEM) program will upgrade antiquated labs for temperature and dynamic testing with new cascade refrigeration units, temperature chambers, vibration test systems, x-ray cameras, a real-time radiography system and full spectrum solar lights, and an outdoor wind and dust machine. In support of the National Defense Strategy, each of these programs supports the following capabilities: Long Range Precision Fires, Next Generation Combat Vehicle and Future Vertical Lift, and Air and Missile Defense.

FY2027 Request
$14.0M
▼ 50% vs FY2026
FY2026 Enacted
$28.0M
▲ 1.5% vs FY2025
FY2025 Actual
$27.6M
Prior year

Major Operational Test Instrumentation — one RDT&E project inside PE 0604759A. Congressional marks are recorded on the program element, not on a project.

Project 986 — Major Operational Test Instrumentation — requests $14.0M in FY2027, 13% of the $106.1M requested for program element 0604759A. Year over year it falls 50% against FY2026.

Funding trajectory

Project 986 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25027.6FY25ACTUAL28.0FY26ENACTED14.0FY27REQUEST12.6FY2813.5FY2913.5FY3013.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual27.6
FY2026Enacted28.0
FY2027Request14.0
FY2028Outyear12.6
FY2029Outyear13.5
FY2030Outyear13.5
FY2031Outyear13.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$7.6M
FY2026 enacted$13.0M
FY2027 request$14.0M

Continue to expand and enhance the baseline for an operationally realistic test environment and integrate with other systems and tools; refine Real Time Causality Assessment (RTCA) to include non-kinetic effects and centralized battle damage assessments (BDAs); establish technology refresh plan to maintain current hardware; integration…

Read the FY2027 plan →
Project 986 — every activity in full →
Project detail

What project 986 buys

This project funds the development, acquisition, and integration of major operational test instrumentation for the U.S. Army Test and Evaluation Command's Operational Test Command and supporting test activities at test and training ranges. Requirements for instrumentation are identified through a long-range survey of project managers, Research Development and Engineering Centers (RDECs), and Battle Laboratories developing future weapon systems and the test programs that support these systems. Project focus is to address Director Operational Test and Evaluation (DOT&E) identified Army test realism shortfalls. Base funding will establish enterprise level business processes and services for test instrumentation to develop, operate, and secure capabilities in accordance with OSW and Army Digital Engineering and Software Modernization Strategies. Efforts will promote synergies between the training and testing enablers to improve product development, integration, and cyber activities, and to promote re-use of common assets and services to meet Army modernization priorities. Projects are designated as a major test program based on their visibility, assessed relative technical risk (medium-high), schedule risk, cost (greater than $1.500 million per year or $7.500 million for the total project) and applicability to other mission areas or services. These projects are technically demanding, state-of-the-art, unique instrumentation assets or suites to meet technology shortfalls, and generally result from development programs managed by a professional project management team. The DOT&E annual report to Congress identified shortfalls in the Army's abilities to create realistic operational environments. The Expeditionary Live Virtual Constructive Command Center (XLCC) project addresses multiple shortfalls identified by DOT&E. XLCC is a portfolio of related development efforts that will deliver a system of systems to provide Test Monitoring & Control (TMC) for the Common Operating Picture (COP) for Exercise Control (EXCON) for the Multi-Domain Operations Environment (MDOE). XLCC will provide Real Time Casualty Assessment (RTCA) and instrumentation suite that delivers a high fidelity, realistic, real-time capability to measure the System Under Test (SUT). XLCC also allows the U.S.

FY2027 Request
$8.6M
▼ 30% vs FY2026
FY2026 Enacted
$12.3M
▲ 43% vs FY2025
FY2025 Actual
$8.6M
Prior year

Reagan Test Site (RTS) T&E Investments — one RDT&E project inside PE 0604759A. Congressional marks are recorded on the program element, not on a project.

Project 983 — Reagan Test Site (RTS) T&E Investments — requests $8.6M in FY2027, 8.1% of the $106.1M requested for program element 0604759A. Year over year it falls 30% against FY2026.

Funding trajectory

Project 983 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

08.6FY25ACTUAL12.3FY26ENACTED8.6FY27REQUEST8.7FY288.7FY298.8FY308.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual8.6
FY2026Enacted12.3
FY2027Request8.6
FY2028Outyear8.7
FY2029Outyear8.7
FY2030Outyear8.8
FY2031Outyear8.9
Inside the project

10 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Radar Reliability Improvement Program (RRI).flat
FY2025 actual$0.5M
FY2026 enacted$0.5M
FY2027 request$0.5M

FY2027 planned work RRI Program will continue as an I&M Umbrella Program to push technology into the radar systems. RRI projects will address: Enhancing the Reliability of the Sensor; Technology Refresh; Obsolescence; Commonality of Design across Sensors; Enhanced Monitoring FD/FI; Enable Remote Operation and Monitoring; and Enhanced Capabilities.

FY2026 plans — current year RRI Program will continue as an I&M Umbrella Program to push technology into the radar systems. RRI projects will address: Enhancing the Reliability of the Sensor; Technology Refresh; Obsolescence; Commonality of Design across Sensors; Enhanced Monitoring FD/FI; Enable Remote Operation and Monitoring; and Enhanced Capabilities.

FY2025 accomplishments RRI Program will continue as an I&M Umbrella Program to push technology into the radar systems. RRI projects will address: Enhancing the Reliability of the Sensor; Technology Refresh; Obsolescence; Commonality of Design across Sensors; Enhanced Monitoring FD/FI; Enable Remote Operation and Monitoring; and Enhanced Capabilities.

Legacy Servo Upgrade Program.
FY2025 actual$1.9M
FY2026 enacted
FY2027 request

FY2025 accomplishments Continuation of installation of new servos at a second radar (ALCOR).

RTS Range Enhancements for Hypersonic Vehicle Testing
FY2025 actual$0.7M
FY2026 enacted
FY2027 request

FY2025 accomplishments Continuation to mature and deploy enhanced tracking algorithms to the RTS sensor suite and planning & support for experimentation & testing in space.

Transmitter/Receiver & Optics Improvements▲ 400%
FY2025 actual$0.5M
FY2026 enacted$0.4M
FY2027 request$1.8M

FY2027 planned work Upgrade from legacy Electronic Ballistic Cameras to newer, more capable and easier to maintain cameras. Update optics control software to meet Cybersecurity requirements. Begin program and engineering planning for multi-static radar receivers to add sensitivity and capability to the KREMS radars.

FY2026 to FY2027 change Increases due to need for additional radar receiver sensitivity, and obsolescence replacement of Electronic Ballistic Cameras at optics sites.

FY2026 plans — current year Continue installation of new high speed cameras and the specialized servers to operate cameras and record data at extremely high rates of speed. Update optics control software to meet Cybersecurity requirements. Procure and install new Infrared optical systems, replacing obsolete units.

FY2025 accomplishments Continue to maintain operability of RTS capabilities.

MPS-36 Infrastructure Refresh▲ 9%
FY2025 actual$0.5M
FY2026 enacted$0.8M
FY2027 request$0.8M

FY2027 planned work Continue to replace corroded and decayed components to restore functionality and maintainability. Continuation of work to upgrade/replace RF components and computer hardware that controls the RF sub-systems. Multi-year infrastructure repair & refresh with inspections & study of existing issues, and to replace most critical items.

FY2026 to FY2027 change Increase of $70K is due to the upgrade to encoders and the integration of the slip ring replaced in FY2026.

FY2026 plans — current year Continue to replace corroded and decayed components to restore functionality and maintainability. Continuation of work to upgrade/replace RF components and computer hardware that controls the RF sub-systems. Multi-year infrastructure repair & refresh with inspections & study of existing issues, and to replace most critical items. Replacement of electrical slip-ring in one unit.

FY2025 accomplishments Continue to replace corroded and decayed components to restore functionality and maintainability. Continuation of work to upgrade/replace RF components and computer hardware that controls the RF sub-systems. Multi-year infrastructure repair & refresh with inspections & study of existing issues, and to replace most critical items.

Radar High Voltage Power Supply Upgradesflat
FY2025 actual
FY2026 enacted$1.5M
FY2027 request$1.5M

FY2027 planned work Finalize design work on S-band power supply and continue to order long-lead items; begin studies on UHF and VHF power supply modernization/replacement, especially given the two UHF power supply incidents in 2025 (one high voltage injury (electric shock), one electrocution (death)).

FY2026 plans — current year Finished and test TRADEX L-Band Power Supply upgrade. Perform studies and preliminary design work on S-band power supply; begin studies on UHF and VHF power supplies

Radar Improvements▼ 29%
FY2025 actual
FY2026 enacted$3.9M
FY2027 request$2.8M

FY2027 planned work Updates to the Radar Distributed Operations (RDO) software to add functionality, bug fixes, and cybersecurity improvements. Replace antiquated Industrial Control Systems with modern, cybersecurity, maintainable systems. Perform studies on updating radar receivers, klystrons, tubes, transmitters, and related items. Improvements to waveguides and signal processing. Updating radiation safety software. Upgrade radar electrical safety equipment & interlocks.

FY2026 to FY2027 change Decrease due to RDO software updates meeting major milestones.

FY2026 plans — current year Updates to the Radar Distributed Operations (RDO) software to add functionality, bug fixes, and cybersecurity improvements. Replace antiquated Industrial Control Systems with modern, cybersecurity, maintainable systems. Perform studies on updating radar receivers, klystrons, tubes, transmitters, and related items. Improvements to waveguides and signal processing. Updating radiation safety software

Multi-Level Securityflat
FY2025 actual
FY2026 enacted$0.5M
FY2027 request$0.5M

FY2027 planned work Continue studies, planning, and design work in order to support requirements from customers to collect test data at higher than secret levels.

FY2026 plans — current year Continue studies and planning in order to support requirements from customers to collect test data at higher than secret levels.

Telemetry Refresh▼ 7%
FY2025 actual
FY2026 enacted$0.8M
FY2027 request$0.7M

FY2027 planned work Will continue to perform required telemetry phased equipment replacement program updates to prevent obsolescence.

FY2026 to FY2027 change Decreases due to need to replace fewer components due to obsolescence.

FY2026 plans — current year Will continue to perform required telemetry phased equipment replacement program updates to prevent obsolescence.

ALTAIR Radar Transmitter Safety Upgrade
FY2025 actual$4.5M
FY2026 enacted
FY2027 request

FY2025 accomplishments Began the replacement of ALTAIR transmitter subsystems to prevent any future safety issues.

Project detail

What project 983 buys

This Project funds improvement and modernization (I&M) for the Ronald Reagan Ballistic Missile Defense Test Site (RTS) instrumentation systems. The Reagan Test Site with its remote location and one of kind instrumentation systems provides a strategic test environment that cannot be replicated. In order to continue its critical mission of testing missile systems that are of paramount importance to the defense of the nation, the RTS instrumentation systems must be continuously updated and upgraded to support the emerging technologies being developed by the Department of War (DOW) such as hypersonics and other advanced weapons systems. Without modernization, these instrumentation systems face obsolescence or degraded capability and the inability to provide the critical data needed for continued materiel development. Without instrumentation on par with the technologies being utilized in emerging systems, the materiel developer will be unable to complete their test programs or pass programmatic milestones toward deployment. These funds provide modernization of the radar, telemetry, optics, range safety, communications, command/control and other equipment essential to meet test and evaluation requirements of the Services and DoW agencies. The RTS instrumentation is required to support data collection for test & evaluation assessments and operational decisions that have strategic implications for the Army, Navy, Air Force, United States Strategic Command (STRATCOM), Missile Defense Agency (MDA), Defense Advanced Research Projects Agency (DARPA), National Aeronautics and Space Administration (NASA), and other customers. RTS, located in the Republic of the Marshall Islands, is a remote, secure activity of the Major Range and Test Facility Base (MRTFB). Funding will enable RTS to meet National Defense objectives and sustain the required instrumentation suite.

FY2027 Request
$1.2M
▲ 1.8% vs FY2026
FY2026 Enacted
$1.2M
▲ 3.7% vs FY2025
FY2025 Actual
$1.1M
Prior year

Cyber Blue Team — one RDT&E project inside PE 0604759A. Congressional marks are recorded on the program element, not on a project.

Project FF1 — Cyber Blue Team — requests $1.2M in FY2027, 1.1% of the $106.1M requested for program element 0604759A. Year over year it grows 1.8% against FY2026.

Funding trajectory

Project FF1 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.1FY25ACTUAL1.2FY26ENACTED1.2FY27REQUEST1.2FY281.2FY291.2FY301.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.1
FY2026Enacted1.2
FY2027Request1.2
FY2028Outyear1.2
FY2029Outyear1.2
FY2030Outyear1.2
FY2031Outyear1.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Cyber Blue Teams▲ 2%
FY2025 actual$1.1M
FY2026 enacted$1.2M
FY2027 request$1.2M

FY2027 planned work FY 2027 funding supports certification of AAMCAT teams. These teams are required to perform engineering risk-reduction assessments for PMs early in the acquisition process. AAMCAT Management Office (TSMO) leverages automation and AI for rapid certification, knowledge sharing, and proactive risk management. The Lessons Learned Portal requires AI-enabled features to capture, analyze, and disseminate lessons learned from AAMCAT operations across the Army enterprise. This integration of AI will allow the program to be scalable, adaptive, and continue to meet the demands of the rapidly evolving threat landscape.

FY2026 to FY2027 change Funding increase due to economic assumptions.

FY2026 plans — current year The funding provides the ability to continue certification of Army Acquisition and Modernization Cyber Assessment Teams (AAMCATs) as well as support the operation and maintenance of an AAMCAT web portal and central repository to include trend analysis and lessons learned from engineering risk reduction assessments.

FY2025 accomplishments The funding provides the ability to continue certification of Army Acquisition and Modernization Cyber Assessment Teams (AAMCATs) as well as support the operation and maintenance of an AAMCAT web portal and central repository to include trend analysis and lessons learned from engineering risk reduction assessments.

Project detail

What project FF1 buys

In 2016 the Army Acquisition Executive (AAE) designated the Program Manager for Cyber, and Training (PM CT2) as the Office of Primary Responsibility for Cyber Acquisition Blue Teams (CABT) certifications and standards program. This Project executes the establishment and management of certification standards for CABT and coordination of requirements on behalf of the Assistant Secretary of the Army for Acquisition, Logistics, and Technology (ASA (ALT)). PM CT2 will establish certification standards, certify Blue Teams, and maintain a vulnerabilities/lessons learned repository. PM CT2 will work with Blue and Red Teams to establish processes which facilitate open network tests under the red team authority, coordinate with Program Managers on CABT efforts on behalf of ASA(ALT) and report to ASA(ALT) on new cyber vulnerabilities. Blue teams will work cooperatively with acquisition programs to make sure all security measures are taken throughout the program's lifecycle, ensuring cyber resiliency. Blue teams are essential to help military operators assess, protect and defeat the presence of cyber security threats across Army Acquisition Programs. Will focus on the continuation of certifying candidate teams. The goal is to certify enough teams to allow acquisition programs the flexibility to find a certified Blue Team that meet their program's schedule and cost and can be incorporated early on in the program. CABT vulnerability assessments will provide data analytics to report trends and lessons learned. A web portal will serve as a one-stop shop for both candidate and certified Blue teams to obtain and maintain their certification.