What project 2195 buys
This project corrects major deficiencies, improves Test & Evaluation (T&E) capabilities, and increases T&E support effectiveness at Navy Major Range and Test Facility Base ranges and facilities. The T&E Investment project improves, modernizes and adds new test capabilities at the following test facilities: the Naval Undersea Warfare Center Division Newport Atlantic Undersea Test and Evaluation Center (AUTEC), Andros Island, Bahamas; the Nanoose and Dabob ranges of the Naval Undersea Warfare Center Division Keyport, Keyport, WA; the Sea Range, Land Ranges, Target Operations, Ordnance T&E Facility, Test Wing Pacific located at the Naval Air Warfare Center Weapons Division, Point Mugu, CA and China Lake, CA; and the Atlantic Test Range, Air Combat Environment T&E Facility, Electromagnetic Environmental Effects, Air Vehicle Modification and Instrumentation facility, Test Wing Atlantic, Target Operations, and the Propulsion Systems Evaluation Facility located at the Naval Air Warfare Center Aircraft Division, Patuxent River, MD and the test and evaluation capabilities located at the Pacific Missile Range Facility, Kauai, HI.
Project 2195 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 65.0 |
| FY2026 | Enacted | 61.9 |
| FY2027 | Request | 112.5 |
| FY2028 | Outyear | 153.5 |
| FY2029 | Outyear | 151.0 |
| FY2030 | Outyear | 135.6 |
| FY2031 | Outyear | 138.0 |
3 accomplishments / planned programs
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 2 of them describe FY2027 work in enough detail to have their own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
- Complete replacement of prime movers at NAWCWD. - Continue the minor upgrade and modernization of test capabilities at NAWCAD, NAWCWD and PMRF. - Continue upgrades to telemetry collection and processing capabilities at NAWCWD. - Continue upgrades to telemetry collection and processing capabilities at PMRF. - Continue modernization of…
Read the FY2027 plan →- Complete replacement of the hydrophone tracking system at AUTEC. - Continue the minor upgrade and modernization of test capabilities at AUTEC, Nanoose and Dabob. - Continue replacement of underwater cables to hydrophone arrays at Nanoose and Dabob. - Continue upgrade of T&E target emulator at Nanoose and Dabob. - Continue upgrade of…
Read the FY2027 plan →FY2027 planned work -Continue the minor upgrade and modernization of test capabilities at NAWCAD and NAWCWD and the upgrade to general instrumentation and equipment. -Continue replacement of obsolete control room equipment at the NAWCAD propulsion test facility. -Continue replacement of amplifiers at the NAWCAD electromagnetic interference facility. -Initiate refurbishment of CT4 test arena at NAWC WD China Lake. -Initiate solid state transmitter purchase at NAWCAD
FY2026 to FY2027 change Funding increases from FY 2026 to FY 2027 due to the purchase of solid state transmitter and the test arena refurbishment.
FY2026 plans — current year - Continue the minor upgrade and modernization of test capabilities at NAWCAD and NAWCWD and the upgrade to general instrumentation and equipment. - Initiate replacement of obsolete control room equipment at the NAWCAD propulsion test facility. - Initiate replacement of amplifiers at the NAWCAD electromagnetic interference facility.