Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $112.5M for Major T&E Investment under RDT&E program element 0604759N, up 73% over FY2026. In the FY2027 defense authorization, House moved to cut it to $104.5M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 65.0 |
| FY2026 | Enacted | 64.8 |
| FY2027 | Request | 112.5 |
| FY2028 | Outyear | 153.5 |
| FY2029 | Outyear | 151.0 |
| FY2030 | Outyear | 135.6 |
| FY2031 | Outyear | 138.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.
2 projects roll up into PE 0604759N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 73% overall, which can hide much larger swings below.
Congressional Adds
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Mission & acquisition strategy
This project corrects major deficiencies, improves Test & Evaluation (T&E) capabilities, and increases T&E support effectiveness at Navy Major Range and Test Facility Base (MRTFB) ranges and facilities. The T&E Investment project improves, modernizes and adds new test capabilities at the following test facilities: the Naval Undersea Warfare Center Division Newport Atlantic Undersea Test and Evaluation Center, Andros Island, Bahamas; the Nanoose and Dabob ranges of the Naval Undersea Warfare Center Division Keyport, Keyport, WA; the Sea Range, Land Ranges, Target Operations, Ordnance T&E Facility, Test Wing Pacific located at the Naval Air Warfare Center Weapons Division, Point Mugu, CA and…
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604759N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksT & E Investment — one RDT&E project inside PE 0604759N. Congressional marks are recorded on the program element, not on a project.
Project 2195 — T & E Investment — requests $112.5M in FY2027, 100% of the $112.5M requested for program element 0604759N. Year over year it grows 82% against FY2026.
Project 2195 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 65.0 |
| FY2026 | Enacted | 61.9 |
| FY2027 | Request | 112.5 |
| FY2028 | Outyear | 153.5 |
| FY2029 | Outyear | 151.0 |
| FY2030 | Outyear | 135.6 |
| FY2031 | Outyear | 138.0 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Complete replacement of the hydrophone tracking system at AUTEC. - Continue the minor upgrade and modernization of test capabilities at AUTEC, Nanoose and Dabob. - Continue replacement of underwater cables to hydrophone arrays at Nanoose and Dabob. - Continue upgrade of T&E target emulator at Nanoose and Dabob. - Continue upgrade of…
Read the FY2027 plan →- Complete replacement of prime movers at NAWCWD. - Continue the minor upgrade and modernization of test capabilities at NAWCAD, NAWCWD and PMRF. - Continue upgrades to telemetry collection and processing capabilities at NAWCWD. - Continue upgrades to telemetry collection and processing capabilities at PMRF. - Continue modernization of…
Read the FY2027 plan →-Continue the minor upgrade and modernization of test capabilities at NAWCAD and NAWCWD and the upgrade to general instrumentation and equipment. -Continue replacement of obsolete control room equipment at the NAWCAD propulsion test facility. -Continue replacement of amplifiers at the NAWCAD electromagnetic interference facility…
What project 2195 buys
This project corrects major deficiencies, improves Test & Evaluation (T&E) capabilities, and increases T&E support effectiveness at Navy Major Range and Test Facility Base ranges and facilities. The T&E Investment project improves, modernizes and adds new test capabilities at the following test facilities: the Naval Undersea Warfare Center Division Newport Atlantic Undersea Test and Evaluation Center (AUTEC), Andros Island, Bahamas; the Nanoose and Dabob ranges of the Naval Undersea Warfare Center Division Keyport, Keyport, WA; the Sea Range, Land Ranges, Target Operations, Ordnance T&E Facility, Test Wing Pacific located at the Naval Air Warfare Center Weapons Division, Point Mugu, CA and China Lake, CA; and the Atlantic Test Range, Air Combat Environment T&E Facility, Electromagnetic Environmental Effects, Air Vehicle Modification and Instrumentation facility, Test Wing Atlantic, Target Operations, and the Propulsion Systems Evaluation Facility located at the Naval Air Warfare Center Aircraft Division, Patuxent River, MD and the test and evaluation capabilities located at the Pacific Missile Range Facility, Kauai, HI.
Congressional Adds — one RDT&E project inside PE 0604759N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $112.5M requested for program element 0604759N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 2.9 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
Congressional Add. Will fund Pilot-Vehicle Interface for Joint Simulation Environment (JSE) Integration effort.