RDT&E Program Element · President's Budget PB2027

Test and Evaluation Support

PE 0605807F·U.S. Air Force·Approp. 3600 — RDT&E·BA6 — RDT&E Management Support
FY2027 Request
$1.80B
⚑ Contested — House cuts 3.0%
HitchAI read

U.S. Air Force funding ramps 62% to a $1.80B request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House cut 3.0% (to $1.75B); the Senate funded it in full; House appropriators added 0.8% (to $1.82B).

FY2027 Request
$1,802.5M
▲ 62% vs FY2026
House mark
$1,747.8M
▼ $54.7M vs request
FY2026 Enacted
$1,113.4M
In law

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $1.80B for Test and Evaluation Support under RDT&E program element 0605807F, up 62% over FY2026. In the FY2027 defense authorization, House moved to cut it to $1.75B.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

5001,0001,5002,0000936.5FY25ACTUAL1,113.4FY26ENACTED1,802.5FY27REQUEST2,014.1FY281,917.0FY291,794.5FY301,627.5FY31HOUSE
Actual Enacted Request Outyear (FYDP) House mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual936.5
FY2026Enacted1,113.4
FY2027Request1,802.5
FY2028Outyear2,014.1
FY2029Outyear1,917.0
FY2030Outyear1,794.5
FY2031Outyear1,627.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0605807F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 62% overall, which can hide much larger swings below.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$1,802.5M
House NDAA (HASC)HASC
$1,747.8M −$54.7M · −3.0%
Senate NDAA (SASC)SASC
$1,802.5M full · +$0
House Approps (HAC-D)HAC_D
$1,817.5M +$15.0M · +0.8%
▲ $69.7M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This program element provides resources to operate the Air Force Test Center (AFTC) test activities which are included in the Department of War (DoW) Major Range and Test Facility Base (MRTFB). Test facilities/capabilities include wind tunnels, rocket and jet engine test cells, hypersonic and subsonic testing, modeling and simulation, technology, limited space environmental simulation chambers, armament test ranges, hardware-in-the-loop test facilities, climatic test facilities, avionics test facilities, aircraft testbeds, dry lake bed landing sites, instrumented test ranges, and test aircraft maintenance, as well as USAF Test Pilot School (TPS).

Project 6606TS, 6606MR, 6606TG — Test and Evaluation Support
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?Which project inside PE 0605807F is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605807F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Test and Evaluation Support (PE 0605807F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605807F
Machine access
Markdown twin /programs/0605807F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$1,448.4M
▲ 37% vs FY2026
FY2026 Enacted
$1,055.1M
▲ 19% vs FY2025
FY2025 Actual
$889.9M
Prior year

Test and Evaluation Support — one RDT&E project inside PE 0605807F. Congressional marks are recorded on the program element, not on a project.

Project 6606TS — Test and Evaluation Support — requests $1.45B in FY2027, 80% of the $1.80B requested for program element 0605807F. Year over year it grows 37% against FY2026.

Funding trajectory

Project 6606TS funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5001,0001,5000889.9FY25ACTUAL1,055.1FY26ENACTED1,448.4FY27REQUEST1,559.4FY281,467.9FY291,441.7FY301,462.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual889.9
FY2026Enacted1,055.1
FY2027Request1,448.4
FY2028Outyear1,559.4
FY2029Outyear1,467.9
FY2030Outyear1,441.7
FY2031Outyear1,462.7
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Civ Pay▲ 6%
FY2025 actual$477.1M
FY2026 enacted$400.7M
FY2027 request$424.4M

Continue funding civilian pay to support testing at AEDC, the 412TW and USAF TPS at Edwards AFB, and the 96TW at Eglin AFB.

Non Pay▲ 56%
FY2025 actual$412.8M
FY2026 enacted$654.5M
FY2027 request$1,024.0M

Continue to provide operational support for AFTC test activities. Efforts include Aircraft Ops, Flying Hour Program (FHP), Programmed Depot Maintenance (PDM), depot field teams, contracted services, test equipment and supplies, general operations and maintenance, utilities, Joint Simulation Environment, and Test Pilot School (list not…

Read the FY2027 plan →
Project 6606TS — every activity in full →
Project detail

What project 6606TS buys

This program activity provides resources to operate the Air Force Test Center (AFTC) test activities which are included in the Department of War (DoW) Major Range and Test Facility Base (MRTFB). Test facilities/capabilities operated through this program include wind tunnels, rocket and jet engine test cells, hypersonic and subsonic testing, modeling and simulation, technology, limited space environmental simulation chambers, armament test ranges, hardware-in-the-loop test facilities, climatic test facilities, avionics test facilities, aircraft testbeds, dry lakebed landing sites, instrumented test ranges, and test aircraft maintenance, as well as USAF Test Pilot School. The AFTC's three Test Wings (TW) are supported by this project:(1) Arnold Engineering and Development Complex (AEDC), located at Arnold Air Force Base (AFB) TN; (2) 412TW, located at Edwards AFB, CA; and (3) 96TW, located at Eglin AFB, FL.

FY2027 Request
$211.4M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Maintenance and Repair — one RDT&E project inside PE 0605807F. Congressional marks are recorded on the program element, not on a project.

Project 6606MR — Maintenance and Repair — requests $211.4M in FY2027, 12% of the $1.80B requested for program element 0605807F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 6606MR funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015020025000.0FY25ACTUAL0.0FY26ENACTED211.4FY27REQUEST287.8FY28248.3FY29104.6FY3097.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request211.4
FY2028Outyear287.8
FY2029Outyear248.3
FY2030Outyear104.6
FY2031Outyear97.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Strike AssetsNEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$211.4M

FY 2027 Budget Year Plans include beginning test capability development for: Advanced Turbine Engines, Aerodynamic and Weapon Integration, and Advanced Landing Gear.

Project 6606MR — every activity in full →
Project detail

What project 6606MR buys

This project's mission is not performed under this program.

FY2027 Request
$142.7M
▲ 145% vs FY2026
FY2026 Enacted
$58.2M
▲ 25% vs FY2025
FY2025 Actual
$46.6M
Prior year

704th Test Group — one RDT&E project inside PE 0605807F. Congressional marks are recorded on the program element, not on a project.

Project 6606TG — 704th Test Group — requests $142.7M in FY2027, 7.9% of the $1.80B requested for program element 0605807F. Year over year it grows 145% against FY2026.

Funding trajectory

Project 6606TG funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150200250046.6FY25ACTUAL58.2FY26ENACTED142.7FY27REQUEST167.0FY28200.8FY29248.2FY3067.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual46.6
FY2026Enacted58.2
FY2027Request142.7
FY2028Outyear167.0
FY2029Outyear200.8
FY2030Outyear248.2
FY2031Outyear67.7
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Civ Pay▲ 2%
FY2025 actual$31.7M
FY2026 enacted$29.9M
FY2027 request$30.4M

Fund civilian pay for the 704th Test Group's (TG) consistent mission of testing of DoW, other Government Agencies, foreign military sales, and commercial weapon systems.

Non Pay▲ 296%
FY2025 actual$14.9M
FY2026 enacted$28.3M
FY2027 request$112.3M

Continue funding operational support for AFTC test activities. Efforts include aircraft operations, Flying Hour Program (FHP), contracted services, test equipment and supplies, general operations and maintenance, and utilities (list not all inclusive).

Read the FY2027 plan →
Project 6606TG — every activity in full →
Project detail

What project 6606TG buys

Project infrastructure support is provided for the unique capabilities of the 704th Test Group (TG) facilities: Central Inertial and Global Positioning System (GPS) Test Facility (CIGTF/746th Test Squadron), the Holloman High Speed Test Track (HHSTT/846th Test Squadron) and the National Radar Cross Section (RCS) Test Facility (NRTF/704 TG Det 2), the 586th Flight Test Squadron including Detachment 1 (Det 1), 704 TG Operating Location (704 TG OL-AA) at Kirtland AFB, and 704 TG Operation Location (704 TG OL-AC) at Wright-Patterson AFB. CIGTF provides independent test and evaluation of inertial, Global Positioning System, and integrated systems used for aircraft navigation and missile guidance systems, including vulnerability to electronic interference. HHSTT capabilities include full-scale testing in flight representative environments, realistic live-fire simulations, test item and target fragment recovery, precision trajectory analysis and high speed photography. NRTF provides radar cross section (RCS) monostatic and bistatic amplitude and phase measurements, antenna pattern measurements, glint and near field measurements for low observable targets. The 586th Flight Test Squadron executes flight test and test support for advanced avionics and weapons development of joint, international and commercial test programs. Det 1 provides the liaison function for coordinating and scheduling all US Air Force test and training operations at White Sands Missile Range (WSMR). OL-AA provides test support for the Air Force Research Lab (AFRL) Directed Energy Division. The 704 TG OL-AC includes the Landing Gear Test Facility (LGTF) with capabilities such as variable and fixed inertia dynamometers, compression/tension load applicators, 4 drop towers, a burst pit and a dynamic load simulator. The 704 TG OL-AC also includes the Air Vehicle Survivability Office that provides support for Air Force aircraft acquisition programs. The 704th TG support services contracts are awarded on the basis of full and open competition.