RDT&E Project · President's Budget PB2027

Next Generation Combat Vehicle Ammunition

FY2027 Request
$15.2M
▲ 55% vs FY2026
HitchAI read

Project BY1 — Next Generation Combat Vehicle Ammunition requests $15.2M in FY2027, 12% of the $124.9M requested for program element 0604802A, up 55% on FY2026. 1 R-2A activity decomposes the request. Northrop Grumman is the largest named R-3 performer at $6.5M, 43% of the project's FY2027 R-3 total.

MarketGround Combat Vehicles

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$15.2M
▲ 55% vs FY2026
FY2026 Enacted
$9.8M
▲ 62% vs FY2025
FY2025 Actual
$6.0M
Prior year
Project detail

What project BY1 buys

50x228 millimeter (mm) family of ammunition is a critical technology development in response to the Next Generation Combat Vehicle (NGCV) Abbreviated Capability Development Document for weapon qualification, platform integration, and fielding of the XM30 Combat Vehicle primary weapon system (XM913). This effort includes the development of three capabilities: The XM1202 Target Practice with Tracer (TP-T); the XM1203 Armor Piercing Fin Stabilized Discarding Sabot with Tracer (APFSDS-T); and the XM1204 High Explosive Airburst with Trace (HEAB-T). The training cartridge will allow the Warfighter to train in a cost-effective manner and the tactical cartridges will provide enhanced lethality at increased ranges when engaging personnel threats in the open, defilade, and under the cover of urban structures, Anti-Tank Guided Missiles (ATGM) teams, and current and projected future peer armored materiel threats. This effort is operating under Major Capability Acquisition (MCA) authority for rapid prototyping to qualify the three munitions in order to support the NGCV Cross Functional Team (CFT) timeline for First Unit Equipped (FUE). Fiscal Year (FY) 2027 funding supports Developmental Test and Evaluation (DT&E), Milestone documentation, Live Fire Test and Evaluation (LFT&E) and preparation activities for prototype fielding. The total cost of the Next Generation Combat Vehicle Ammunition (NGCV) Middle Tier of Acquisition effort is $122.610 million RDT&E from FY2021 to FY2025. The program is fully funded across the Future Years Defense Program (FYDP).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
Funding trajectory

Project BY1 funding, FY2025–FY2027

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.0FY25ACTUAL9.8FY26ENACTED15.2FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.0
FY2026Enacted9.8
FY2027Request15.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$6.0M
FY2026 enacted$3.3M
FY2027 request$15.2M

Fiscal Year (FY) 2027 funding supports Developmental Test and Evaluation (DT&E), Milestone C documentation, design optimization, and preparation activities for prototype fielding.

Read the FY2027 plan →
Who's building it

Named performers on project BY1

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Northrop Grumman
$6.5M · 43%
General Dynamics
$6.0M · 40%