Roll-up of 13 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $124.9M for Weapons and Munitions - Eng Dev under RDT&E program element 0604802A, down 20% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 125.2 |
| FY2026 | Enacted | 156.8 |
| FY2027 | Request | 124.9 |
| FY2028 | Outyear | 88.1 |
| FY2029 | Outyear | 80.0 |
| FY2030 | Outyear | 54.1 |
| FY2031 | Outyear | 54.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
13 projects roll up into PE 0604802A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -20% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.
155mm Artillery Propulsion Mod - Sys Demonstration
Medium Caliber Anti-Personnel and Counter UAS
Small Caliber Ammo for Next Gen Squad Weapons
Next Generation Combat Vehicle Ammunition
155mm HE Rocket Assist Project Extended Range
30mm MMPA M-SHORAD INC 3
Precision Munition (Sniper)
Ammunitions Logistics Prototyping
This Project supports the future force by maturing and integrating prototypes and Commercial Off-The-Shelf technologies fully endorsed by the Warfighter and associated Combat developers following a system of systems approach. The selected capabilities for continued investment have been proven successful through Warfighter exercises and Soldier evaluation events to materially improve elements of tactical ammunition transportation, distribution, inventory management, availability, and survivability as logistics system enablers within the formation. These enablers will improve the efficiency and effectiveness of ammunition operations, to include retrograde, while reducing the logistics footprint on the battlefield. This project enhances the operational effectiveness of the ammunition logistics system to ensure the distribution of reliable ammunition to the Warfighter. Funding will be focused on integrating mature technologies into ammunition resupply enablers and developing interfaces with applicable Program of Records (PoR) as recommended by the Fires, Maneuver and Sustainment Centers of Excellence.
FY2027 planned work Supports design reviews, experimentation, maturation, and risk reduction of ammunition logistics technologies to ensure seamless integration with and transition to PoR. Specifically geared towards preparation of technology components of the suite of TAMMS integrated with weapon systems within mobile brigade combat teams, to include fire control enhancements and weapon logistics status. Provides portfolio management of ammunition logistics enabling technologies through participation in technical working groups and Integrated Product Teams across the lethality and sustainment stakeholders.
FY2026 to FY2027 change Increase to account for increased personnel costs.
FY2026 plans — current year Provides overall program management across the ammunition logistics portfolio by supporting the development of technology delivery tasks and coordination with stakeholders across multiple Future Capability Directorates to align with emerging requirements across the predictive logistics domain. Supports design reviews, experimentation, maturation, and risk reduction of ammunition logistics technologies to ensure seamless integration with and transition to PoR. Specifically geared towards preparation of technology components for the Tactical Ammunition Management Micro-Services (TAMMS) requirements, cyber engineering, risk management supporting artifacts, and integration of software elements…
FY2025 accomplishments Integrate mature COTS or Army developed technology enablers to provide a capability for enhanced ammunition supply chain during tactical transportation and distribution in formations forward of the Ammunition Support Areas (ASA). Leverage recently completed JPEO A&A Research Development Test & Evaluation (RDT&E) funds system engineering studies/analysis to inform operational performance thresholds as critical selection criteria of commercial technologies. Integration efforts will primarily focus on tactical Cannon Artillery operations to improve operational availability of ammunition and associated components at the tactical edge and will be applicable to all other indirect fire weapons…
Aviation Airborne Expendable Countermeasures
Aviation Airborne Expendable Countermeasures (AAECM) will support Integrated System Design (ISD), System Capability (SC) and Manufacturing Process Demonstrations (MPD) on expendable countermeasure flares and decoys to include the XM215 Infrared (IR) countermeasure Flare, XM20 and M1A1/M1E2 Radio Frequency (RF) expendables. These expendable countermeasures systems are an essential part of survivability equipment for Army aircraft. Army Research Development Technology & Evaluation (RDT&E) efforts are coordinated with Program Executive Office (PEO) Aviation to address the AAECM capability, a critical enabler for enduring aircraft and the Future Vertical Lift (FVL) - Aircraft Survivability Equipment (ASE) Cross Functional Team (CFT) within Army's Top modernization priorities. These advanced decoys will address deficiencies in Army aircraft protection and the safety of its aircrews against advanced Man-Portable Air Defense Systems (MANPADS) and Surface-to-Air Missiles (SAM) systems. The project will also support ISD, SC and MPD on new expendable countermeasure munitions that will protect Army aircraft from advanced and proliferated current guided missile threats. Activities include modeling and simulation, flight testing, qualification testing, environmental considerations, safety enhancements, manufacturing enhancements, qualification of other service and foreign munitions that could meet current requirements, product improvements, insertion of new technologies to increase performance, and enhancement of current flare solutions for new and existing aircraft. Systems include impulse cartridges and aircraft expendables (to include RF expendables).
FY2027 planned work FY2027 funding will continue support of model and simulation for IRCM (XM215) and RFCM (M1A1/M1E2) as well as Milestone C for the XM215 and ECP for the M1A1/M1A2.
FY2026 to FY2027 change FY 2027 funding decrease due to XM20/XM215 moves towards Milestone C.
FY2026 plans — current year FY 2026 will continue to support Modeling and Simulation for the XM20 and M1A1/M1E2 broadband Chaff for AH64/CH47 aircraft. FY 2026 will also support modeling and simulation for the XM215. For XM20, FY 2026 will support Milestone C, LRIP and fielding to the UH60 platform.
FY2025 accomplishments FY2025 funding will support XM20 MS C, model and simulation, Developmental Flight Test on AH64/CH47 aircrafts and Initial Operational Test and Evaluation (IOT&E) on UH60 aircraft to support First Unit Equipped.
Non-Standard Simulator Munitions
Project EC4 Non-Standard Simulator Munitions will standardize various pyrotechnics that simulate battlefield effects and develop, demonstrate, and qualify various screening effects in grenades, vehicle launched effects, unmanned aerial vehicles, smoke pots, signals, counter sensors, and countermeasures. The Army's Combat Training Centers (CTCs) are currently using non-standard munitions to replicate both conventional and asymmetric warfare battlefield effects. These modified commercial-off-the-shelf products have not been type-classified or material released and are not safe or sustainable for use by Soldiers. This effort will develop and demonstrate various pyrotechnic simulators, replicating both conventional and asymmetric warfare effects and munitions such as: - Black smoke signature (burning vehicles, buildings, and equipment); - Yellow smoke signature (chemical, biological or nuclear effects); - Mini Blast to simulate hostile fire and small Improvised Explosive Devices (IEDs) during mounted operations in urban terrain; - Micro pyrotechnics to simulate indoor hostile fire and IED effects that are capable of being integrated into existing facilities; - Rocket Propelled Grenade (RPG) simulators to replicate the flight of a Rocket Propelled Grenade; - Macro Pyro to simulate hostile fire, booby trap, and IED simulations both indoor and outdoors; - High Order Blast Effect (HiOBE) used to replicate a Vehicle Borne Improvised Explosive Device (VBIED), building explosions, and other significant explosive events; - Artillery airburst simulator to replicate indirect fire; - Antitank Guided Missile and Rocket (AGMR) simulator to replicate surface to air missile or shoulder launched rocket; - Tracer Fire-back simulator to replicate enemy small arms fire and anti-aircraft fire; - Electrically and mechanically initiated smoke pots and smoke grenades of various colors; - Multi-spectral and screening effects of grenades, vehicle launched effects, smoke pots, chaff, signals for unmanned systems, unmanned aerial vehicles, and ground vehicles. - Counter sensor effects - Pyrotechnic and other effects for increased lethality against robotic targets.
FY2027 planned work FY 2027 will support completion of HiOBE MS C documentation, continue EMD of alternative Smoke Pot and Smoke Grenade effects, continue EMD of smoke and screening effects, and begin EMD of lethality against robotic and unmanned targets.
FY2026 to FY2027 change FY 2027 increase in funding due to the addition of black smoke grenades and black smoke pots prototyping and qualification to the schedule as well as beginning EMD on pyrotechnic and other effects.
FY2026 plans — current year FY 2026 will support the completion of HiOBE EMD, preparation of Milestone C documentation, EMD of alternative Smoke Pot and Smoke Grenade effects, and initiate smoke and screening effects EMD.
FY2025 accomplishments FY 2025 will support the completion of Tracer Fire-back and HiOBE EMD, preparation of Milestone C documentation, and initiation of alternative smoke pot and smoke grenade effects.
Precision Guidance Kit
30mm Lethality
The 30 millimeter (mm) Lethality project funds the development of the family of 30mm cartridges, to provide anti-personnel effects, counter defilade, anti-materiel and counter unmanned aerial systems (C-UAS). This ammunition will increase the effectiveness and lethality for all platforms equipped with a medium caliber 30mm weapon system to include the Stryker Infantry Carrier Vehicle (ICV) and proposed Next Generation Combat Vehicle (NGCV) variants. The tactical Armor Piercing cartridge will provide an organic direct fire capability to support infantry at a greater range and will improve lethality when engaging light-to-medium armored vehicles. The airburst cartridge will provide the Warfighter with increased lethality against troops in the open, counter defilade, Anti-Tank Guided Missile (ATGM) teams, troops behind urban structures and counter unmanned aerial systems . The training cartridges will be ballistically matched to the tactical cartridges, allowing the Warfighter to train in a cost-effective manner, and on CONUS and OCONUS training ranges. In FY 2027, project FA6 / 30mm Lethality has no budget request.
FY2026 to FY2027 change Decrease as program transitions to production in FY 2027.
FY2026 plans — current year Conduct Developmental Test and Evaluation (DT&E), Live Fire Test and Evaluation (LFT&E), and Milestone C preparation.
FY2026 to FY2027 change Decrease as program transitions to production in FY 2027.
FY2026 plans — current year Obtain test hardware and conduct Live Fire Test and Evaluation (LFT&E) and Lethality Assessment Capstone Event (LACE). Develop 30mm Unmanned Aerial Systems (UAS) Proximity cartridge and ammunition to support tactical round training needs.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 38% | 48.0 |
| Government labs & warfare centers | 42% | 52.3 |
| Other / unspecified | 20% | 24.6 |
| FY2027 request | 100% | 124.9 |
Mission & acquisition strategy
Multiple projects within Program Element Weapons and Munitions - Eng Dev, are key enablers of the Army's Field Artillery modernization priorities: 155mm Artillery Propulsion Modernization (Project DK8), 155mm High Explosive Rocket Assisted Projectile Extended Range (Project EU6) and Precision Guidance Kit (Project S36). Project BY1, Next Generation Combat Vehicle Ammunition: 50x228 millimeter (mm) family of ammunition is a critical technology development in response to the Next Generation Combat Vehicle (NGCV) Abbreviated Capability Development Document for weapon qualification, platform integration, and fielding of the XM30 Mechanized Infantry Combat Vehicle (MICV) primary weapon system…
30mm Armor Piercing tactical and training cartridge: Proposals were requested from Industry to develop a 30mm anti-materiel tactical cartridge and ballistically matched training cartridge that will meet Army Performance Specifications and Stryker Lethality Annex Requirements. The Government awarded two contracts utilizing an Other Transaction Agreement (OTA) through Department of Defense (DoD) Ordnance Technology Consortium (DOTC) to support development, Design Engineering Tests (DET) and down-selected to one contract for Developmental Test & Evaluation (DT&E) in support of Milestone C. The Government will award Federal Acquisition Regulation (FAR)-based contracts for production of each cartridge.
- Management Services
- Product Development
- Support
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Defense Ordnance has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604802A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksBattalion Mortar System Modernization — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project MS1 — Battalion Mortar System Modernization — requests $26.1M in FY2027, 21% of the $124.9M requested for program element 0604802A. Year over year it falls 7.7% against FY2026.
Project MS1 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.8 |
| FY2026 | Enacted | 28.3 |
| FY2027 | Request | 26.1 |
| FY2028 | Outyear | 15.9 |
| FY2029 | Outyear | 12.4 |
| FY2030 | Outyear | 5.8 |
| FY2031 | Outyear | 5.8 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2027 funding in the amount of $26.121 million will continue to support activities to further design and develop a next generation 81mm mortar weapon, fire control system, and mobility kit that can be hosted on a tactical vehicle. Additionally, funding is required to support the next generation 120mm mortar weapon, fire control system…
Read the FY2027 plan →Named performers on project MS1
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MS1 buys
The Battalion Mortar System Modernization project supports the development of modernized Mortar Weapon Systems to support Mobile Brigade Combat Teams (MBCTs), Infantry Brigade Combat Teams (IBCTs), Stryker Brigade Combat Teams (SBCTs), and Armored Brigade Combat Teams (ABCTs). Efforts include development and qualification of modernized mortar systems and their required components to include fire control and ammunition that will increase range, lethality, survivability, mobility and readiness. The weapon and fire control will be used as a standalone man-portable system with digital fire control capability or as a modular system that can be hosted onto light tactical vehicles such as the High Mobility Multipurpose Wheeled Vehicle (HMMWV), the Infantry Squad Vehicle (ISV) and/or Joint Lightweight Tactical Vehicle (JLTV) when a mobility kit is utilized. This modernized system will increase survivability, maneuverability, and provide tactical advantage to the Warfighter when matched with pacing threat for direct and indirect fire and will provide overmatching capabilities. Initial characterization efforts will establish a firm foundation for proposed advanced indirect fire systems while allowing for incremental improvements and updates as technologies continue to mature, which will maintain and enhance performance, improve lethality, responsiveness, and reliability of indirect fire systems across the required spectrum of military operations. Fiscal Year (FY) 2027 funding will support the design and development of a next generation mobile mortar weapons, fire control systems, and mobility kits that can be hosted on tactical vehicles.
- Management Services
- Product Development
- Support
- Test and Evaluation
155mm Artillery Propulsion Mod - Sys Demonstration — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project DK8 — 155mm Artillery Propulsion Mod - Sys Demonstration — requests $23.9M in FY2027, 19% of the $124.9M requested for program element 0604802A. Year over year it grows 105% against FY2026.
Project DK8 funding, FY2026–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 11.7 |
| FY2027 | Request | 23.9 |
| FY2028 | Outyear | 39.2 |
| FY2029 | Outyear | 37.6 |
| FY2030 | Outyear | 26.1 |
| FY2031 | Outyear | 26.3 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Fiscal Year (FY) 2027 funding will support system demonstration and integration with down selected Mobile Tactical Cannon (MTC), verify performance of propelling charge and ignition systems, and evaluate integration with handling and stowage systems.
Read the FY2027 plan →Named performers on project DK8
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project DK8 buys
The 155mm Artillery Propulsion Modernization (System Demonstration) project develops and qualifies advanced propulsion systems, to include propelling charge, modular charge, ignition systems, propellant, and packaging solutions in support of the Army's Field artillery modernization objectives. Novel propulsion technologies will be matured and tested into the propelling charges and ignition systems to advance and innovate artillery firing performance and enhance manufacturability of the industrial base. Solutions will be integrated into a system of systems capability to ensure interoperability, closing fires capability gaps to destroy or neutralize artillery targets out to 70 kilometers. Fiscal Year (FY) 2027 funding will support system demonstration and integration with down selected Mobile Tactical Cannon (MTC), verify performance of propelling charge and ignition systems, and evaluate integration with handling and stowage systems.
- Management Services
- Product Development
- Support
- Test and Evaluation
Medium Caliber Anti-Personnel and Counter UAS — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project XT6 — Medium Caliber Anti-Personnel and Counter UAS — requests $17.4M in FY2027, 14% of the $124.9M requested for program element 0604802A. Year over year it grows 14% against FY2026.
Project XT6 funding, FY2026–FY2029
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 15.3 |
| FY2027 | Request | 17.4 |
| FY2028 | Outyear | 10.0 |
| FY2029 | Outyear | 7.9 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Complete prototype build for Developmental Test and Evaluation (DT&E) and conduct DT&E test.
Complete prototype build for Developmental Test and Evaluation (DT&E) and conduct DT&E test.
Named performers on project XT6
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project XT6 buys
The Anti-Personnel and Counter Unmanned Aerial Systems (UAS) munitions provide increased lethality through proximity airburst effects against personnel, small Unmanned Aerial Systems (UAS), and small boats without requiring modification to the platform. Airburst capability is identified as a threshold Key System Attribute (KSA) in Apache Block 3 Capability Production Document (CPD) - Approved 14 June 2017, and counter-UAS capability is identified in other cannon caliber Operational Need Statements (ONSs) and Capability Development Documents (CDDs). Fiscal Year (FY) 2027 funds support prototype builds and Developmental Test and Evaluation (DT&E) for both the 30x113mm Aviation Proximity Explosive (APEX) munition and the 25mm Bradley Aerial Defeat Ground Enhanced Round (BADGER) munition.
- Product Development
- Support
- Test and Evaluation
Small Caliber Ammo for Next Gen Squad Weapons — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project FL4 — Small Caliber Ammo for Next Gen Squad Weapons — requests $17.3M in FY2027, 14% of the $124.9M requested for program element 0604802A. Year over year it falls 25% against FY2026.
Project FL4 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 20.5 |
| FY2026 | Enacted | 23.1 |
| FY2027 | Request | 17.3 |
| FY2028 | Outyear | 12.3 |
| FY2029 | Outyear | 12.4 |
| FY2030 | Outyear | 12.4 |
| FY2031 | Outyear | 12.5 |
6 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Perform LFT&E close-out activities in preparation for Full Materiel Release (FMR).
Conduct Complex Target Terminal Characterization (CTTC), complete Live Fire Test and Evaluation (LFT&E), achieve Full Material Release (FMR) milestone, initiate persistent design optimization, and develop prototypes for Limited Lethality Assessment. Initiate detailed design activities for a facility that enables prototyping of new…
Read the FY2027 plan →Complete activities for Full Materiel Release (FMR) and preparation for transition from Middle Tier of Acquisition (MTA) to Major Capability Acquisition (MCA).
Complete the transition from Middle Tier of Acquisition to Major Capability Acquisition (MCA), complete Type Classification (TC), and execute Full Material Release (FMR)
Conduct Design Verification Test (DVT), Critical Design Review (CDR), and Production Qualification Tests. Complete transition from Middle Tier of Acquisition (MTA) to Major Capability Acquisition (MCA).
Perform design optimization activities and perform activities in preparation for transition from Middle Tier of Acquisition (MTA) to Major Capability Acquisition (MCA).
Named performers on project FL4
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project FL4 buys
The Small Caliber Ammo for Next Gen Squad Weapons project is a critical technology development in response to the Soldier Lethality Cross Functional Team (SL CFT) Initial Capability Document (ICD) for the ammunition required to support the rapid prototyping, development, and fielding of the Next Generation Squad Weapons (NGSW) under the Middle Tier of Acquisition (MTA) authority for rapid prototyping/rapid fielding. The objective is to develop and Full Materiel Release (FMR) the new 6.8mm ammunition in parallel with the NGSW rifle and automatic rifle. The 6.8mm ammunition is split into multiple ammunition variants, the General Purpose (GP), the Special Purpose (SP), the Reduced Range Ammunition (RRA), Tracer Ammunition, Blank Ammunition, the Close Combat Mission Capability Kit (CCMCK) training ammunition, Drill Dummy Inert (DDI) cartridge, and High-Pressure Test (HPT) cartridge. FY 2027 funding will support SP Complex Target Terminal Characterization (CTTC), SP Live Fire Test and Evaluation (LFT&E), Full Material Release (FMR), Persistent Design Optimization, develop prototypes for Limited Lethality Assessment, and CCMCK developmental tests. FY 2027 funding will also support Initiation of detailed design activities for a facility that enables prototyping of new concepts for the Persistent Design Optimization effort as well as activities for transition from Middle Tier of Acquisition (MTA) to Major Capability Acquisition (MCA). The total cost of the Small Caliber Ammo for Next Gen Squad Weapons Middle Tier of Acquisition effort is $156.7M million RDTE from FY 2020 to FY 2028.
- Product Development
- Support
- Test and Evaluation
Next Generation Combat Vehicle Ammunition — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project BY1 — Next Generation Combat Vehicle Ammunition — requests $15.2M in FY2027, 12% of the $124.9M requested for program element 0604802A. Year over year it grows 55% against FY2026.
Project BY1 funding, FY2025–FY2027
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.0 |
| FY2026 | Enacted | 9.8 |
| FY2027 | Request | 15.2 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Fiscal Year (FY) 2027 funding supports Developmental Test and Evaluation (DT&E), Milestone C documentation, design optimization, and preparation activities for prototype fielding.
Read the FY2027 plan →Named performers on project BY1
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project BY1 buys
50x228 millimeter (mm) family of ammunition is a critical technology development in response to the Next Generation Combat Vehicle (NGCV) Abbreviated Capability Development Document for weapon qualification, platform integration, and fielding of the XM30 Combat Vehicle primary weapon system (XM913). This effort includes the development of three capabilities: The XM1202 Target Practice with Tracer (TP-T); the XM1203 Armor Piercing Fin Stabilized Discarding Sabot with Tracer (APFSDS-T); and the XM1204 High Explosive Airburst with Trace (HEAB-T). The training cartridge will allow the Warfighter to train in a cost-effective manner and the tactical cartridges will provide enhanced lethality at increased ranges when engaging personnel threats in the open, defilade, and under the cover of urban structures, Anti-Tank Guided Missiles (ATGM) teams, and current and projected future peer armored materiel threats. This effort is operating under Major Capability Acquisition (MCA) authority for rapid prototyping to qualify the three munitions in order to support the NGCV Cross Functional Team (CFT) timeline for First Unit Equipped (FUE). Fiscal Year (FY) 2027 funding supports Developmental Test and Evaluation (DT&E), Milestone documentation, Live Fire Test and Evaluation (LFT&E) and preparation activities for prototype fielding. The total cost of the Next Generation Combat Vehicle Ammunition (NGCV) Middle Tier of Acquisition effort is $122.610 million RDT&E from FY2021 to FY2025. The program is fully funded across the Future Years Defense Program (FYDP).
- Product Development
- Support
- Test and Evaluation
155mm HE Rocket Assist Project Extended Range — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project EU6 — 155mm HE Rocket Assist Project Extended Range — requests $13.1M in FY2027, 10% of the $124.9M requested for program element 0604802A. Year over year it falls 20% against FY2026.
Project EU6 funding, FY2025–FY2028
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 15.1 |
| FY2026 | Enacted | 16.3 |
| FY2027 | Request | 13.1 |
| FY2028 | Outyear | 4.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2027 funding will support critical verification testing and manufacturing maturation activities required to achieve Critical Design Review (CDR).
Read the FY2027 plan →Named performers on project EU6
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project EU6 buys
The 155 millimeter (mm) High Explosive (HE) Rocket Assisted Projectile Extended Range project supports the Army's Field Artillery modernization objectives. This venture develops an innovative rocket design with a lethal warhead that is compatible with unguided and guided fuzes to meet extended range and accuracy requirements. The Next Generation Rocket Assisted Projectile (NGRAP) development effort will first deliver a solution to increase ranges from 30km to 40km in current 39 caliber systems and will also improve accuracy, lethality, and ranges utilizing 39 caliber and extended range cannons. Fiscal Year (FY) 2027 funding will support critical verification testing and qualification activities required to achieve Critical Design Review (CDR).
- Management Services
- Product Development
- Support
- Test and Evaluation
30mm MMPA M-SHORAD INC 3 — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project DC9 — 30mm MMPA M-SHORAD INC 3 — requests $6.1M in FY2027, 4.9% of the $124.9M requested for program element 0604802A. Year over year it falls 66% against FY2026.
Project DC9 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 10.9 |
| FY2026 | Enacted | 17.8 |
| FY2027 | Request | 6.1 |
| FY2028 | Outyear | 4.5 |
| FY2029 | Outyear | 4.5 |
| FY2030 | Outyear | 4.5 |
| FY2031 | Outyear | 4.6 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Conduct Developmental Test & Evaluation (DT&E), Operational Assessment, and Milestone C preparation.
What project DC9 buys
30mm Multi-Mode Proximity Airburst (MMPA) Maneuver Short Range Air Defense Increment 3 (M-SHORAD INC 3): The 30mm MMPA M-SHORAD INC 3 / Project DC9 funds the development of the 30mm XM1223 MMPA munition and respective weapon contact setter under the Middle Tier of Acquisition (MTA) authority for rapid prototyping. The objective is to enhance the operational effectiveness of the M-SHORAD Inc 3 platform, Mobile-Low, Slow, Small Unmanned Aircraft Integrated Defeat System (M-LIDS) and any other Joint Force platforms that are equipped with a 30mm weapon system and have a Counter Unmanned Aerial Systems (C-UAS) mission. The programmable fuze modes in the munition include proximity airburst to defeat personnel in the open and small Unmanned Aerial System (UAS) targets, proximity airburst delay to defeat personnel in defilade, gated proximity airburst to minimize collateral damage in cluttered environments, mechanical point detonate to defeat light materiel targets, and self-destruct to minimize collateral damage. The XM1223 will allow the platforms to conduct counter-UAS missions while retaining the ability to quickly transition to ground targets without having to swap ammunition. FY 2027 funds support conducting Developmental Test & Evaluation (DT&E), Operational Assessment, and Milestone C preparation. The total cost of the MMPA Middle Tier of Acquisition (MTA) effort is $54.4 million RDT&E from FY24 to FY28. The remainder of the MMPA MTA is fully funded across the Future Years Defense Program.
- Product Development
- Support
- Test and Evaluation
Precision Munition (Sniper) — one RDT&E project inside PE 0604802A. Congressional marks are recorded on the program element, not on a project.
Project CE3 — Precision Munition (Sniper) — requests $3.1M in FY2027, 2.4% of the $124.9M requested for program element 0604802A. Year over year it falls 32% against FY2026.
Project CE3 funding, FY2025–FY2027
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.3 |
| FY2026 | Enacted | 4.5 |
| FY2027 | Request | 3.1 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 funding will support finalizing EMD and PQT. Complete Limited live fire test and evaluation (LLFT&E) and safety confirmation. Complete documentation for Milestone C.
FY2026 to FY2027 change Decrease due to EMD and testing being completed.
FY2026 plans — current year FY 2026 funding supports the continuation of EMD and complete the Production Qualification Test build. Funding supports Production Qualification Testing (PQT) and soft/hard target testing for the .338 AM Cartridges.
FY2025 accomplishments FY 2025 funding will initiate Engineering and Manufacturing Development (EMD) efforts. Award contract to develop prototype ammunition, conduct a Limited User Assessment (LUA), and perform lethality testing.
What project CE3 buys
The Precision Munition (Sniper) project is a critical technology development in response to the Precision Munition Capabilities Development Documents (CDD) for the ammunition required to support the Precision Sniper Rifle (PSR) / sniper weapons systems. The objective is to transfer the latest lethality technology into the suite of ammunition used by snipers. The Precision Munition improvement is split into three capability areas: Anti-Materiel (AM), Improved Performance Round (IPR), and Subsonic. The AM and IPR capabilities will enhance lethal effects at greater distances. The Subsonic capability will increase soldier survivability at close range by providing a low-sound signature munition that is undetectable to the enemy. FY 2027 will conclude both Engineering and Manufacturing Development (EMD) activities and the Production Qualification Test (PQT) with the culmination of Milestone C.
- Product Development
- Support
- Test and Evaluation