R-2A Activity · President's Budget PB2027

Lifecycle Prototyping

Activity a0·Project 645351 — Prototyping·PE 0604858F·U.S. Air Force
FY2027 Request
$62.6M
▲ 46% vs FY2026
HitchAI read

This activity requests $62.6M in FY2027, 100% of project 645351, up 46% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$62.6M
▲ 46% vs FY2026
FY2026 Enacted
$43.0M
▼ 31% vs FY2025
FY2025 Actual
$62.3M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 645351 of PE 0604858F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- In FY 2027, FAMM and ETV efforts transition to Program, 0604041F as the program has matured and transitioned to the Program Office. - In FY 2027, conduct rapid prototyping of new capabilities and technologies, furthering military proficiency through Government advancements, commercial technology, and DoW industry. Prototyping areas partner with experimentation on to assess these new technologies across prioritized Mission Engineering Threads, such as Counter-Air (HVAA-Protect, C-UAS), Persistent Intelligence, Surveillance, and Reconnaissance (ISR) (MQ-Next, Multi-Mission Autonomy), and Rapid Strike (Long Range Kill Chain, Next Generation Airlift), will guide these efforts. The data generated from these prototypes will be used to make informed decisions regarding potential follow-on development, ensuring alignment with strategic priorities and maximizing return on investment.

FY2026 to FY2027 change

- FY 2027 funding increased by $19.586 million compared to FY 2026 due increases in prototype work on new experimentation/prototyping efforts for capability development. This new work will prioritize areas informed by Mission Engineering Threads, such as Counter-Air, Persistent ISR, and Rapid Strike.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Air Force Materiel Command (AFMC) Integrated Development Office (IDO) will complete operational testing of the Rapid Dragon (palletized effects) system (Phase 7 Base and Option 1) while assessing the operational advantages the system provides against peer adversaries. AFMC IDO will continue to work with DAF, Major and Combatant Commands, and the Air Force Life Cycle Management Center (AFLCMC) Combat Readiness program office to transition the system and warfighting concept. Rapid Dragon will evaluate and integrate new palletized kinetic and non-kinetic effects into the delivery system in support of Family of Affordable Mass Missiles (FAMM) and Deployable Intelligence Networked Global Operations (DINGO). The Operational Prototype will be built and integrated into Joint Operations and Allied Partner exercises to understand the operational advantages that can be exploited across services and strategic allied partners. AFMC IDO will continue to work with allied partners to assess the integration of the palletized effects concept in joint coalition exercises. In FY 2026, this effort is funded from reconciliation (low-cost munitions and supply chain). - SAINT work transferred to Project 645352 Architecture Design and Evaluation in FY 2026. - The Modular Weapon Series (M-Series) Enterprise Test Vehicle (ETV) will continue integration of a variety of sub-systems into the ETV test trucks and demonstrate performance through flight testing. ETV Design Cycle 3 will complete Variant 1 development activities, resulting in demonstration of a low-cost cruise missile prototype that could be used as a future affordable mass weapon. Proof of manufacturability demonstrations will be performed to prove out low-cost high-rate distributed manufacturing methods. Demonstrations will be performed to prove out modularity between weapon variants and with third-party vendor components. Additional integrations could include new datalinks, seekers/sensors, navigation and other sub-systems. Demonstrations could include maturing different options for weapon employment, to include palletized employment, fighter/bomber air launch, ground launch, and others. Begin ETV Variant 2 development which could include prototyping activities for affordable mass air-to-air, air- to-surface, hypersonic, and other form-factors/capabilities. In FY 2026, this effort is funded from reconciliation (low-cost munitions and supply chain). - ETV work transfers to Program 0604041F in FY 2027. - FAMM will be a M-Series, open-architected munition for long-range, affordability, high producibility, and palletized employment. FAMM lifecycle prototyping activities will include integration and flight demonstrations of affordable and highly manufacturable small turbine engines, seekers/sensors, networked datalinks, collaborative autonomy behaviors, and ordnance (warhead/fuse). Work will also include testing and certification of palletized mass employment munition flight vehicles. In FY 2026, this effort is funded from reconciliation (low-cost munitions and supply chain). - FAMM work transfers to Program 0604041F in FY 2027. - High Value Airborne Asset (HVAA) Protect partners with defense and the organic industrial base to upgrade legacy mission systems to enhance self-protection capabilities. The goal is to achieve force projection into highly contested environments utilizing existing fleet structure and enhancing HVAA survivability through increased optimization of legacy assets and new technology. Efforts include prototype development, assessment of CONOPs, and demonstration of a cutting-edge prototype protection package for HVAA.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550062.3FY25ACTUAL43.0FY26ENACTED62.6FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual62.3
FY2026Enacted43.0
FY2027Request62.6

This activity is 100% of project 645351's FY2027 request and 38% of PE 0604858F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

2 activities in project 645351

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Lifecycle Prototyping — this activity$62.6M ▲ 46%
Blended Wing Body - Next Generation Aircraft$0.0M ▼ 100%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0604858F, project 645351 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.