R-2A Activity · President's Budget PB2027

All-Up-Round

FY2027 Request
$136.9M
▲ 3.3% vs FY2026
HitchAI read

This activity requests $136.9M in FY2027, 25% of project 657011, up 3.3% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$136.9M
▲ 3.3% vs FY2026
FY2026 Enacted
$132.6M
▼ 5.7% vs FY2025
FY2025 Actual
$140.6M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 657011 of PE 0604932F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

During FY2027, the program plans to complete Developmental Test and Evaluation program execution on B-52. Related FY2027 Activities include, but are not limited to, the following: - continue through program practices to ensure the following are met; requirements flow down, requirement allocation to hardware and software, requirements compliance matrix, system performance, reliability, maintainability, product assurance, testability, producibility and supportability. - continue facility and security infrastructure upgrades to enable secure connectivity and communication between DoW, DoE, and industry. - continue efforts to conduct parallel development, design, and test activities with the DoE to ensure the LRSO adequately integrates the DoE designed warhead into the system. - conduct safety studies and nuclear certification activities. - continue to perform aircraft integration efforts including activities associated with integration on threshold aircraft and aircraft mission planning system upgrades to accommodate the new weapon. - continue to conduct joint DoW and DOE ground and flight activities to verify the missile to warhead interface and demonstrate the system meets performance specifications. - continue to collaborate with the NNSA to ensure seamless integration of DoE warhead assets into the cruise missile. - continue to execute and improve the unified certification strategy which meets nuclear surety, cyber security, and nuclear safety requirements. - continue other activities necessary for All-Up-Round integration. These efforts include developing mission planning upgrade needs, Operational Flight Program (OFP) development and integration to deliver the OFP test tapes, planning activities necessary to integrate LRSO with aircraft, and ensuring the logical, electrical, and physical interfaces of the LRSO as defined in the Interface Control Document (ICD).

FY2026 to FY2027 change

Funding increased due to completion activities of B-52 integration and increased nuclear certification activities.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

During FY2026, the program plans to continue Developmental Test and Evaluation program execution on B-52. Related FY2026 Activities include, but are not limited to, the following: - continue through program practices to ensure the following are met; requirements flow down, requirement allocation to hardware and software, requirements compliance matrix, system performance, reliability, maintainability, product assurance, testability, producibility and supportability. - continue facility and security infrastructure upgrades to enable secure connectivity and communication between Department of War (DoW), Department of Energy (DoE), and industry. - continue efforts to conduct parallel development, design, and test activities with the DOE to ensure the LRSO adequately integrates the DOE designed warhead into the system. - conduct safety studies and nuclear certification activities. - continue to perform aircraft integration efforts including activities associated with integration on threshold aircraft and aircraft mission planning system upgrades to accommodate the new weapon. - continue to conduct joint DoW and DoE ground and flight activities to verify the missile to warhead interface and demonstrate the system meets performance specifications. - continue to collaborate with the National Nuclear Security Administration (NNSA) to ensure seamless integration of DOE warhead assets into the cruise missile. - continue to execute and improve the unified certification strategy which meets nuclear surety, cyber security, and nuclear safety requirements. - continue other activities necessary for All-Up-Round integration. These efforts include developing mission planning upgrade needs, Operational Flight Program (OFP) development and integration to deliver the OFP test tapes, planning activities necessary to integrate LRSO with aircraft, and ensuring the logical, electrical, and physical interfaces of the LRSO as defined in the Interface Control Document (ICD).

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550751001250140.6FY25ACTUAL132.6FY26ENACTED136.9FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual140.6
FY2026Enacted132.6
FY2027Request136.9

This activity is 25% of project 657011's FY2027 request and 24% of PE 0604932F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project 657011

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0604932F, project 657011 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0604932F/657011/a1.md · MCP mcp.hitchintel.combudget_get_activity