Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $565.7M for Long Range Standoff Weapon under RDT&E program element 0604932F, up 27% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $532.1M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 579.6 |
| FY2026 | Enacted | 446.9 |
| FY2027 | Request | 565.7 |
| FY2028 | Outyear | 172.2 |
| FY2029 | Outyear | 92.0 |
| FY2030 | Outyear | 22.8 |
| FY2031 | Outyear | 22.9 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
2 projects roll up into PE 0604932F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 27% overall, which can hide much larger swings below.
P3I Modernization
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Other / unspecified | 100% | 565.7 |
| FY2027 request | 100% | 565.7 |
Mission & acquisition strategy
The Long Range Stand-Off (LRSO) Cruise Missile is a long-range survivable stand-off weapon capable of delivering lethal nuclear effects on strategic targets. LRSO will replace the currently fielded Air Launched Cruise Missile (ALCM) and will be integrated on both legacy and future bomber aircraft. The LRSO weapon system will be capable of penetrating and surviving advanced Integrated Air Defense Systems (IADS) from significant stand-off range to prosecute strategic targets in support of the Air Force's global attack capability and strategic deterrence core function.
The acquisition strategy focuses on the development of the All-Up-Round Weapon System, integration with the nuclear warhead, executing aircraft integration activities, and conducting test and evaluation with a continued robust reliability and manufacturing approach. The program obtained a successful Milestone (MS) A decision in July 2016 and subsequently released a Request for Proposals. The program competitively selected two prime contractors in August 2017 to execute the Technology Maturation and Risk Reduction (TMRR) phase. The selected prime contractors executed the Cost-Plus-Fixed-Fee (CPFF) contracts during TMRR with activities focused on developing and maturing subsystem and system designs.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604932F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksLONG RANGE STAND-OFF — one RDT&E project inside PE 0604932F. Congressional marks are recorded on the program element, not on a project.
Project 657011 — LONG RANGE STAND-OFF — requests $545.5M in FY2027, 96% of the $565.7M requested for program element 0604932F. Year over year it grows 22% against FY2026.
Project 657011 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 579.6 |
| FY2026 | Enacted | 446.9 |
| FY2027 | Request | 545.5 |
| FY2028 | Outyear | 152.1 |
| FY2029 | Outyear | 71.9 |
| FY2030 | Outyear | 2.7 |
| FY2031 | Outyear | 2.8 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The program will continue to design, develop, integrate and test the LRSO weapon system through the EMD contract. During FY2027, the program plans to complete Developmental Test and Evaluation program execution on B-52. Related FY2027 Activities include, but are not limited to, the following: - continue reliability growth…
Read the FY2027 plan →During FY2027, the program plans to complete Developmental Test and Evaluation program execution on B-52. Related FY2027 Activities include, but are not limited to, the following: - continue through program practices to ensure the following are met; requirements flow down, requirement allocation to hardware and software, requirements…
Read the FY2027 plan →The Government formally arranges and funds the use of Government flight test support for ground and flight test activities. During FY27, the program plans to complete Developmental Test and Evaluation program execution on B-52. Related FY27 Activities include, but are not limited to, the following: - Ground Test Phasing: Majority of E3…
Read the FY2027 plan →What project 657011 buys
The Long Range Stand-Off (LRSO) Cruise Missile is a long-range survivable stand-off weapon capable of delivering lethal nuclear effects on strategic targets. LRSO will replace the currently fielded Air Launched Cruise Missile (ALCM) and will be integrated on both legacy and future bomber aircraft. The LRSO weapon system will be capable of penetrating and surviving advanced Integrated Air Defense Systems (IADS) from significant stand-off range to prosecute strategic targets in support of the Air Force's global attack capability and strategic deterrence core function. FY 2025 funds continued to design, develop, integrate and test the LRSO weapon system through the EMD contract and continued Developmental Test and Evaluation program execution on B-52. FY 2026 funds continued to design, develop, integrate and test the LRSO weapon system through the EMD contract and continue Developmental Test and Evaluation program execution on B-52. FY 2027 funds continued to design, develop, integrate and test the LRSO weapon system through the EMD contract and complete the Developmental Test and Evaluation program execution on B-52. Milestone C is planned for 3QFY2027. Funds may be used to address emerging or short notice Diminishing Manufacturing Sources and Material Shortage (DMSMS) and supply chain issues. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F. The program is conducting Engineering and Manufacturing Development (EMD) tasks to validate requirements to support Developmental and Operational Testing, and Production Readiness.
- Product Development
- Support
- Test and Evaluation
- Management Services
P3I Modernization — one RDT&E project inside PE 0604932F. Congressional marks are recorded on the program element, not on a project.
Project 657013 — P3I Modernization — requests $20.1M in FY2027, 3.6% of the $565.7M requested for program element 0604932F. It is a new start — no prior-year or current-year money.
Project 657013 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 20.1 |
| FY2028 | Outyear | 20.1 |
| FY2029 | Outyear | 20.1 |
| FY2030 | Outyear | 20.1 |
| FY2031 | Outyear | 20.1 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY2027 new start. Efforts will allow the exploration and study of technology maturity and investing in the most promising efforts. The key focus areas of study include but are not limited to, Standoff Capability, Operational Range, Cyber Efforts and Classified efforts.
What project 657013 buys
Pre-Planned Product Improvement (P3I) Modernization is necessary for LRSO to stay in front of emerging adversary technologies, strategic investments are needed to provide an affordable path to maintain the integrity of the nuclear triad's air delivered component against an advanced mid-to-far term adversary threat LRSO's Modular Open System Architecture (MOSA) lends itself to a P3I approach; leverage on-going technology maturation efforts to mitigate adversary investments in the Integrated Air Defense (IAD) technologies and additional territorial gains posed to threaten LRSO's effectiveness beyond the reference used to validate 30-year service life FY 2027 funding will be utilized for exploration of technology maturity and investing in the most promising efforts. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.
- Product Development
- Management Services