RDT&E Program Element · President's Budget PB2027

DDG-1000

PE 0204202N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$50.2M
Navy · RDT&E
HitchAI read

U.S. Navy requests $50.2M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Lockheed Martin leads the industry work.

FY2027 Request
$50.2M
▼ 15% vs FY2026
FY2026 Enacted
$58.8M
▼ 73% vs FY2025
FY2025 Actual
$216.2M
Prior year

For fiscal year 2027, the U.S. Navy is requesting $50.2M for DDG-1000 under RDT&E program element 0204202N, down 15% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001502002500216.2FY25ACTUAL58.8FY26ENACTED50.2FY27REQUEST271.2FY28146.2FY29109.8FY3050.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual216.2
FY2026Enacted58.8
FY2027Request50.2
FY2028Outyear271.2
FY2029Outyear146.2
FY2030Outyear109.8
FY2031Outyear50.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0204202N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -15% overall, which can hide much larger swings below.

Project 2464

DD(X) Sys Design, Dev & Integration

$50.2MFY2027 request ▼ 15%
FY2025 actual$216.2M
FY2026 enacted$58.8M
FY2027 request$50.2M
Product DevelopmentTest and EvaluationManagement Services

The Zumwalt class destroyer (DDG 1000) program is developing the naval surface hypersonic strike capability, able to conduct independent forward deployed operations and prosecute deep-inland, time-critical, soft and medium-hardened targets in a contested environment. With the addition of surface hypersonic strike to legacy capabilities, Zumwalt will provide means to conduct Joint Surface Strike, deliver local area defense against air, surface and undersea threats, and incorporate signature reduction to operate in all threat environments. The Zumwalt class will have seamless Joint Interoperability to integrate all source information for battlespace awareness and weapons direction. The surface hypersonic strike capability, combined with the low observable characteristics of the Zumwalt platform, creates a uniquely lethal and survivable naval surface platform. The Zumwalt class supports the National Defense Strategy by supporting modernization initiatives for fielding hypersonic technologies and enabling a more lethal force. Overall, the Zumwalt class will enhance U.S. conventional power projection by providing an independent forward deployed strike platform, with longer range, shorter time of flight, and higher survivability against enemy defenses compared to current capabilities. The Acquisition Decision Memorandum signed by The Assistant Secretary of the Navy (Research, Development and Acquisition) (ASN(RDA)) directed PEO Ships to integrate Conventional Prompt Strike (CPS) into USS Zumwalt (DDG 1000) and USS Michael Monsoor (DDG 1001) by conducting a Building Yard Modernization Period (BYMP) and into USS Lyndon B. Johnson (DDG 1002) during new construction, prior to the ship's arrival in homeport, in order to maximize its fleet availability time. Full operational capability is achieved when the Zumwalt CPS Weapon System modernizations are completed, and all the three ships are turned over to the Fleet. The Zumwalt program strategy is to leverage the development efforts for a CPS capability on Virginia submarines, using a minimal integration solution to rapidly provide a surface hypersonic strike capability to the Fleet.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$180.7M
FY2026 enacted$51.8M
FY2027 request$44.9M

- Continue maintenance and readiness between ship delivery at the end of the Build Yard Modernization Period (BYMP) and Joint Flight Campaign (JFC-6) test shot from Zumwalt. Planned activities to maintain readiness consist of stage testing, alignment testing, grooming, repairs and shakedown. - LYNDON B JOHNSON (LBJ) CPS weapon control…

Read the FY2027 plan →
Test and Evaluation▲ 10%
FY2025 actual$33.2M
FY2026 enacted$4.8M
FY2027 request$5.3M

FY2027 planned work Specific CPS T&E efforts include: - Conduct Shakedown and JFC-6 flight test on ZUMWALT. - Conduct data analysis from Shakedown and JFC-6 to support assessment of platform-specific test objectives. - Continue to develop plans to conduct ZUMWALT-unique CPS Weapons System testing based on changes to the weapon system for future hulls. Procure and updated weapon system simulators as needed. - Finalize ZUMWALT tactics with CPS mission with operational stakeholders Specific DDG 1000 TEMP efforts include: - Continue to plan, execute and analyze Follow-On Test and Evaluation (FOT&E) test events. - Continue to maintain PRA test bed software to support FOT&E pre/post-flight analysis

FY2026 to FY2027 change Increase for FY26 to FY27 is due to test planning, execution, analysis and reporting of FOT&E events.

FY2026 plans — current year Specific CPS T&E efforts include: - Continue to develop the final ZUMWALT-specific shipboard test requirements in coordination with the SSP-lead planning of the live-fire test event of the CPS Weapon System on DDG 1000. - Continued to plan for ZUMWALT support for Shakedown events prior to integration and testing of the CPS Weapon System on DDG 1000. - Continue to refine ZUMWALT-specific test objectives/plans to support the execution of the first CPS flight test (SSP-led live-fire test event) from a ZUMWALT Class Destroyer during JFC-6 with platform and combat system specific subject matter experts, test equipment, and analysis - Execute identify data collection processes to support data…

Management Services▼ 100%
FY2025 actual$2.2M
FY2026 enacted$2.2M
FY2027 request$0.0M

FY2026 to FY2027 change FY26 to FY27 decrease is due to the completion of logistics support requirements associated with Conventional Prompt Strike (CPS) on ZUMWALT Class Destroyers

FY2026 plans — current year Finalize and complete logistics support requirements associated with Conventional Prompt Strike (CPS) on ZUMWALT Class Destroyers.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$50.2M
House NDAA (HASC)HASC
$50.2M full · +$0
Senate NDAA (SASC)SASC
$50.2M full · +$0
House Approps (HAC-D)HAC_D
$50.2M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Lockheed Martin
$40.6M · 81%
Conventional Prompt Strike Support · CPIF
RTX / Raytheon
$3.0M · 5.9%
Conventional Prompt Strike Support · CPAF
Where FY2027 funding flowsShare$M
Industry primes91%45.6
Government labs & warfare centers6.8%3.4
Other / unspecified2.4%1.2
FY2027 request100%50.2
See Lockheed Martin's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Zumwalt class destroyer (DDG 1000) program is developing the naval surface hypersonic strike capability, able to conduct independent forward deployed operations and prosecute deep-inland, time-critical, soft and medium-hardened targets in a contested environment. With the addition of surface hypersonic strike to legacy capabilities, Zumwalt will provide means to conduct Joint Surface Strike, deliver local area defense against air, surface and undersea threats, and incorporate signature reduction to operate in all threat environments. The Zumwalt class will have seamless Joint Interoperability to integrate all source information for battlespace awareness and weapons direction.

The DDG 1000 program strategy is to install CPS onto ZUMWALT Class in a Build Yard Modernization Period (BYMP) at Huntington Ingalls Industries (HII) in Pascagoula, MS. DDG 1000 will be the first ship modernized and arrived at HII in August 2023. Following DDG 1000, first DDG 1002 and then DDG 1001 will be modernized sequentially. DDG 1002 arrived at HII in January 2022 to begin its Combat System Activation (CSA) and will commence CPS installation in-line during CSA production prior to ship delivery. DDG 1001 is ordered last to maximize her operations by the fleet prior to commencing modernization.

Project 2464 — DD(X) Sys Design, Dev & Integration
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0204202N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "DDG-1000 (PE 0204202N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0204202N
Machine access
Markdown twin /programs/0204202N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks