RDT&E Project · President's Budget PB2027

AFDW Development

Project 674365·PE 0605229F — HH-60W·U.S. Air Force·BA7
FY2027 Request
$24.3M
◆ New start in FY2027
HitchAI read

Project 674365 — AFDW Development requests $24.3M in FY2027, 28% of the $87.9M requested for program element 0605229F — a new start, with no prior-year and no current-year money. 1 R-2A activity decomposes the request, 1 new this cycle. Contractor is the largest named R-3 performer at $24.3M, 100% of the project's FY2027 R-3 total.

New start

This project requests $24.3M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

FY2027 Request
$24.3M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year
Project detail

What project 674365 buys

Air Force District of Washington (AFDW) Development effort involves modifying 2 of the 26 HH-60W aircraft to meet the AFDW mission requirements. Modifications include possible removal of components including, but not limited to Rescue Team Seat, Isolated Personnel Litter, Gun System, Chaff/Flare Buckets, and Doors/Floor Armor. In addition, this effort may include, but not limited to, the following modifications to the baseline HH-60W ARC 210 Gen 6 radios, Infrared Countermeasure (IRCM) system, and alternate seating arrangement. Funding Supports Training Systems, Support Equipment, Initial Spares, Operation Site Activation, Program Support Costs (PSC) activities, Other Government Costs (OGC), repair and technical support services, various studies and analysis, upgrades, future HH-60W planning activities, and resolution of Diminishing Manufacturing Sources/Material Shortages (DMSMS) and/or obsolescence issues. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and engineering efforts for redesign. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
Funding trajectory

Project 674365 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL0.0FY26ENACTED24.3FY27REQUEST42.6FY2825.6FY2914.6FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request24.3
FY2028Outyear42.6
FY2029Outyear25.6
FY2030Outyear14.6
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

Air Force District of Washington (AFDW) DevlopmentNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$24.3M

FY2027 planned work Conduct various studies, analysis, engineering efforts for redesign and upgrades. This includes resolution of DMSMS and/or obsolescence issues and Diminishing Manufacturing Sources (DMS) activities.

FY2026 to FY2027 change Funding increased due to initial development and integration efforts for AFDW HH-60Ws.

Who's building it

Named performers on project 674365

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Contractor
$24.3M · 100%