RDT&E Program Element · President's Budget PB2027

HH-60W

PE 0605229F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$87.9M
◆ Scaling +117%
HitchAI read

U.S. Air Force funding ramps 117% to a $87.9M request in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Contractor leads the industry work.

FY2027 Request
$87.9M
▲ 117% vs FY2026
FY2026 Enacted
$40.5M
▲ 28% vs FY2025
FY2025 Actual
$31.6M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $87.9M for HH-60W under RDT&E program element 0605229F, up 117% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075100125031.6FY25ACTUAL40.5FY26ENACTED87.9FY27REQUEST123.8FY2882.3FY2972.9FY3060.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual31.6
FY2026Enacted40.5
FY2027Request87.9
FY2028Outyear123.8
FY2029Outyear82.3
FY2030Outyear72.9
FY2031Outyear60.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0605229F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 117% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$87.9M
House NDAA (HASC)HASC
$87.9M full · +$0
Senate NDAA (SASC)SASC
$87.9M full · +$0
House Approps (HAC-D)HAC_D
$87.9M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Contractor
$24.3M · 28%
AFDW · CPIF
Sikorsky
$20.4M · 23%
Delivery Order (DO) 1 Agile Software Program · FPIF
Where FY2027 funding flowsShare$M
Industry primes62%54.7
Government labs & warfare centers7.0%6.2
Other / unspecified31%27.0
FY2027 request100%87.9
See Contractor's full federal contract ledger members
Program detail

Mission & acquisition strategy

The HH-60W Jolly Green is the US Air Force's Combat Rescue Helicopter (CRH). HH-60W, now in Full Rate Production (FRP) provides the modernization and upgrade to the legacy HH-60G Pave Hawk helicopter. HH-60W modernization funding is crucial to ensure the HH-60W fleet can support the new theater and revitalize support for not only the crew but the rescues they save.

The HH-60W Capability Upgrades program will deliver iterative incremental capability upgrades to the HH-60W technical baseline based on ACC approved requirements and funding, and collective ACC/Program office candidate packaging and delivery. Discrete capability releases will involve hardware and software development (which may include integration of pre-existing material solutions), development of product support packages to ensure field supportability, verification of system performance prior to Government acceptance via lab, System Integration Lab, and flight testing, fleet retrofit via production cut-ins (when possible) or mod lines to include maintenance of common configuration, and updates to associated training systems to include the WST…

Project 674364, 674365, 670001 — HH-60W Modernization Development
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0605229F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605229F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "HH-60W (PE 0605229F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605229F
Machine access
Markdown twin /programs/0605229F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$63.6M
▲ 57% vs FY2026
FY2026 Enacted
$40.5M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

HH-60W Modernization Development — one RDT&E project inside PE 0605229F. Congressional marks are recorded on the program element, not on a project.

Project 674364 — HH-60W Modernization Development — requests $63.6M in FY2027, 72% of the $87.9M requested for program element 0605229F. Year over year it grows 57% against FY2026.

Funding trajectory

Project 674364 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25507500.0FY25ACTUAL40.5FY26ENACTED63.6FY27REQUEST81.2FY2856.7FY2958.3FY3060.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted40.5
FY2027Request63.6
FY2028Outyear81.2
FY2029Outyear56.7
FY2030Outyear58.3
FY2031Outyear60.1
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Follow-On Capability Upgrade Systems (FOCUS)▼ 55%
FY2025 actual$0.0M
FY2026 enacted$13.8M
FY2027 request$6.2M

Continuation of development and integration activities for MUOS-capable radios and software in the COM-3/COM-4 positions and additional development for GPS-AJ. Continue development on JREAP to support MUOS capability.

Degraded Visual Environment System (DVES)▲ 408%
FY2025 actual$0.0M
FY2026 enacted$0.4M
FY2027 request$2.0M

Plan includes continuation of engineering support for requirement maturation and strategy and document development to support initiation of research, development, integration, engineering, and hardware/software integration for a DVES solution. DVES integrates multiple sensors, including infrared, light detection, and ranging (LIDAR), and…

Link-16 Advanced Capability ModernizationNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$5.5M

Initial work for Link-16 Advanced Capability Modernization was previously done under DO1. Link 16 will now be a major thrust (Link 16) and progress to hardware updates. Development and testing for replacing the TacNet Tactical Radio (TTR) with a Link-16 radio capable of meeting the Advanced Capabilities Mandate.

Communication Block ModificationNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$5.0M

Initial work for JTT_NG and Hybrid SATCOM. Development and testing for replacing the ENTR V4 Radio system and installing the Hybrid SATCOM support equipment.

Gun Mount System Performance ImprovementNEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$9.8M

Development of design enhancements, testing, and integration of gun mount components needed to address deficiencies identified during FOT&E. New software will not be required.

Software Upgrade Program (SUP)▲ 34%
FY2025 actual$0.0M
FY2026 enacted$26.3M
FY2027 request$35.1M

Perform development and integration activities for DO1 agile software development and government test and Training System's projects. Also includes product support, SBIR Tax, mission planning, civ pay and government test.

Project 674364 — every activity in full →
Who's building it

Named performers on project 674364

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Sikorsky
$20.4M · 32%
AFLCMC
$6.0M · 9.4%
413th, 579th, 704th TS
$3.9M · 6.2%
Project detail

What project 674364 buys

The HH-60W Jolly Green is the US Air Force's Combat Rescue Helicopter (CRH). HH-60W, now in Full Rate Production (FRP) provides the modernization and upgrade to the legacy HH-60G Pave Hawk helicopter. HH-60W modernization funding is crucial to ensure the HH-60W fleet can support the new theater and revitalize support for not only the crew but the rescues they save. RDT&E efforts include but are not limited to the Software Upgrade Program, Advanced Infrared Countermeasures (AIRCM), Mobile User Objective System (MUOS) with Joint Range Extension Applications Protocol (JREAP), Degraded Visual Environment System (DVES), Global Positioning System Anti-Jam (GPS-AJ), Link-16, Personnel Locator System (PLS), Joint Tactical Terminal (JTT), Hybrid Satcom, Radar Warning Receiver (RWR), Radio Frequency (RF) Threat Jamming, Friendly Force Tracker, HF Radio System, Snow Skis, Tactical Flight Symbology, Gun Mount System Performance Improvement, Next Gen Crypto Mod, Electronic Flight Bags, Electro Optical Infrared Sensors (EOIR), Automated Dependent Surveillance Broadcast - In Device, and Air Force District of Washington (AFDW) mission requirement modifications. HH-60W budget request supports three lines of effort to include but not limited to hardware and software programs. Follow-On Capability Upgrade Systems (FOCUS) includes three (3) capabilities; GPS-AJ, MUOS, and JREAP. MUOS provides narrow band military Beyond Line-of-Sight (BLOS) communication capability with improved availability for voice and video communications and is the DoW directed replacement to Ultra High Frequency (UHF) Satellite Communication (SATCOM). With MUOS, The HH-60W will be compatible with future satellite communication standards. MUOS adds JREAP capability for Link-16 over the horizon /BLOS, Common Interactive Broadcast (CIB), and future data formats. JREAP is a joint protocol per Military Standard (MIL-STD) 3011E, which allows for extension of J-series and Common Message Format messages through long back-haul means BLOS range, e.g. SATCOM, land lines, and specifically used with MUOS. GPS-AJ will enable Combat Search and Rescue (CSAR) operations in contested environments and areas with high jamming risk, especially where no other means of navigation exist, greatly reducing risk and significantly increasing combat capability in multiple theaters.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$24.3M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

AFDW Development — one RDT&E project inside PE 0605229F. Congressional marks are recorded on the program element, not on a project.

Project 674365 — AFDW Development — requests $24.3M in FY2027, 28% of the $87.9M requested for program element 0605229F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 674365 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL0.0FY26ENACTED24.3FY27REQUEST42.6FY2825.6FY2914.6FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request24.3
FY2028Outyear42.6
FY2029Outyear25.6
FY2030Outyear14.6
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Air Force District of Washington (AFDW) DevlopmentNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$24.3M

Conduct various studies, analysis, engineering efforts for redesign and upgrades. This includes resolution of DMSMS and/or obsolescence issues and Diminishing Manufacturing Sources (DMS) activities.

Project 674365 — every activity in full →
Who's building it

Named performers on project 674365

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Contractor
$24.3M · 100%
Project detail

What project 674365 buys

Air Force District of Washington (AFDW) Development effort involves modifying 2 of the 26 HH-60W aircraft to meet the AFDW mission requirements. Modifications include possible removal of components including, but not limited to Rescue Team Seat, Isolated Personnel Litter, Gun System, Chaff/Flare Buckets, and Doors/Floor Armor. In addition, this effort may include, but not limited to, the following modifications to the baseline HH-60W ARC 210 Gen 6 radios, Infrared Countermeasure (IRCM) system, and alternate seating arrangement. Funding Supports Training Systems, Support Equipment, Initial Spares, Operation Site Activation, Program Support Costs (PSC) activities, Other Government Costs (OGC), repair and technical support services, various studies and analysis, upgrades, future HH-60W planning activities, and resolution of Diminishing Manufacturing Sources/Material Shortages (DMSMS) and/or obsolescence issues. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and engineering efforts for redesign. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$31.6M
Prior year

HH-60W Modernization Development — one RDT&E project inside PE 0605229F. Congressional marks are recorded on the program element, not on a project.

Project 670001 — HH-60W Modernization Development — requests $0.0M in FY2027, 0.0% of the $87.9M requested for program element 0605229F.

Funding trajectory

Project 670001 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25031.6FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual31.6
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Follow-On Capability Upgrade Systems (FOCUS)
FY2025 actual$5.1M
FY2026 enacted$0.0M
FY2027 request$0.0M
Software Upgrade Program (SUP)
FY2025 actual$24.2M
FY2026 enacted$0.0M
FY2027 request$0.0M
HH-60W Degraded Visual Environment System (DVES)
FY2025 actual$2.3M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 670001 buys

The HH-60W Jolly Green is the US Air Force's Combat Rescue Helicopter (CRH). HH-60W, now in Full Rate Production (FRP) provides the modernization and upgrade to the legacy HH-60G Pave Hawk helicopter. HH-60W modernization funding is crucial to ensure the HH-60W fleet can support the new theater and revitalize support for not only the crew but the rescues they save. RDT&E efforts include but are not limited to the Software Upgrade Program (SUP), Advanced Infrared Countermeasures (AIRCM), Mobile User Objective System (MUOS) with Joint Range Extension Applications Protocol (JREAP), Degraded Visual Environment System (DVES), Global Positioning System Anti-Jam (GPS-AJ), Link-16, Personnel Locator System (PLS), Joint Tactical Terminal (JTT), Radio Frequency (RF) Threat Jamming, HF Radio System, Snow Skis, Tactical Flight Symbology, Next Gen Crypto Mod, Electronic Flight Bags, Automated Dependent Surveillance Broadcast - In Device, and Air Force District of Washington (AFDW) mission requirement modifications. HH-60W budget request supports three lines of effort to include but not limited to hardware and software programs. Follow-On Capability Upgrade Systems (FOCUS) includes three (3) capabilities; GPS-AJ, MUOS, and JREAP. MUOS provides narrow band military Beyond Line-of-Sight (BLOS) communication capability with improved availability for voice and video communications and is the DoW directed replacement to Ultra High Frequency (UHF) Satellite Communication (SATCOM). With MUOS, the HH-60W will be compatible with future satellite communication standards. MUOS adds JREAP capability for Link-16 over the horizon/BLOS, Common Interactive Broadcast (CIB), and future data formats. JREAP is a joint protocol per Military Standard (MIL-STD) 3011E, which allows for extension of J-series and Common Message Format messages through long back-haul means BLOS range, e.g. SATCOM, land lines, and specifically used with MUOS. GPS-AJ will enable Combat Search and Rescue (CSAR) operations in contested environments and areas with high jamming risk, especially where no other means of navigation exist, greatly reducing risk and significantly increasing combat capability in multiple theaters. SUP, DO 1, Agile Software Program provides software enhancements, deficiency corrections, and crypto-modernization mandates to the HH-60W fleet on an annual release cycle.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation