Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, Defense-Wide agencies are requesting $300.0M for Israeli Cooperative Programs under RDT&E program element 0603913C, up 0.0% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 300.0 |
| FY2026 | Enacted | 300.0 |
| FY2027 | Request | 300.0 |
| FY2028 | Outyear | 300.0 |
| FY2029 | Outyear | 300.0 |
| FY2030 | Outyear | 300.0 |
| FY2031 | Outyear | 300.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 0603913C
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 0% overall, which can hide much larger swings below.
Short Range Ballistic Missile Defense (SRBMD)(David's Sling Weapon System (DSWS))
SRBMD is funded on 2 lines across 2 appropriations
This page shows $127.0M of SRBMD, 81% of the program's $157.0M FY2027 request. The rest is appropriated elsewhere. Also written DSWS.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| Short Range Ballistic Missile Defense (SRBMD)(David's Sling Weapon System (DSWS)) | Procurement | Defense-Wide | 30.0 |
| SRBMD total | Defense-Wide | 157.0 |
Lines whose title names the program. 0 further lines only mention SRBMD in their justification text — those fund something else and are deliberately excluded from the total.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 44% | 132.1 |
| Government labs & warfare centers | 56% | 167.9 |
| FY2027 request | 100% | 300.0 |
Mission & acquisition strategy
Israeli AWS: This system includes block upgrades to the AWS components which enhance capabilities against evolving medium-range threats by increasing the total defended area. AWS elements include the Arrow-2 and Arrow-3 missiles and launchers, Citron Tree Battle Management Center (BMC), Green Pine (GP) and Super Green Pine (SGP) radars, Lego Shield data interfaces, and Hazelnut Tree Launcher Control Centers (LCC). AWS Block 5 development incorporates a Long Range Detection Suite that consists of an Airborne Early Warning System (ABEWS) for enhanced sensor tracking, discrimination, and raid size capacity.
The MDA - U.S. Israeli Cooperative Program Office jointly manages the Arrow Program with Israeli Missile Defense Organization (IMDO) to ensure that all systems are delivered with quality, on time, on budget, and meet the needs of the warfighter. The program funding is equitably funded between the U.S. and Israel with Israel providing matching contributions. However, a portion of the Israeli cost share comes from non-financial contributions such as previously completed work prior to joint program initiation. Contracts are awarded by IMDO or MDA, dependent on what is most advantageous to the Joint Governments. In regard to AWS, IMDO contracts on behalf of U.S. government with Israel Aerospace Industries (IAI). IAI subcontracts with Israeli and U.S.
- Product Development
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Rafael Advanced Defense Systems LTD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603913C.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksArrow Weapon System — one RDT&E project inside PE 0603913C. Congressional marks are recorded on the program element, not on a project.
Project MD26 — Arrow Weapon System — requests $173.0M in FY2027, 58% of the $300.0M requested for program element 0603913C. Year over year it grows 0.0% against FY2026.
Project MD26 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 173.0 |
| FY2026 | Enacted | 173.0 |
| FY2027 | Request | 173.0 |
| FY2028 | Outyear | 173.0 |
| FY2029 | Outyear | 173.0 |
| FY2030 | Outyear | 173.0 |
| FY2031 | Outyear | 173.0 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Initiate Initial Lot Production for Arrow-4. - Incorporate Arrow-4 Launcher into Block 6.
The exhibit describes this work once, for project MD26 as a whole, rather than per activity. Read the project justification →
The exhibit describes this work once, for project MD26 as a whole, rather than per activity. Read the project justification →
Named performers on project MD26
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MD26 buys
Israeli AWS: This system includes block upgrades to the AWS components which enhance capabilities against evolving medium-range threats by increasing the total defended area. AWS elements include the Arrow-2 and Arrow-3 missiles and launchers, Citron Tree Battle Management Center (BMC), Green Pine (GP) and Super Green Pine (SGP) radars, Lego Shield data interfaces, and Hazelnut Tree Launcher Control Centers (LCC). AWS Block 5 development incorporates a Long Range Detection Suite that consists of an Airborne Early Warning System (ABEWS) for enhanced sensor tracking, discrimination, and raid size capacity. In addition, the Sharp Eye ground-based sensor suite, the Arrow-4 interceptor and the Pine Woods Radar are being developed for integration into future AWS Blocks. The program also includes the continued development of Arrow's interoperability with U.S. Missile Defense System. The U.S. and State of Israel entered into a Memorandum of Understanding in September 2016, in which "Such funding, should over a ten-year period beginning in FY 2019 and ending in FY 2028, be provided at a level of $500 million per year." (U.S. contributions only). These funds will be distributed between the Israeli Programs in Research Development Test & Evaluation and Procurement Funds.
- Product Development
Short Range Ballistic Missile Defense (SRBMD)(David's Sling Weapon System (DSWS)) — one RDT&E project inside PE 0603913C. Congressional marks are recorded on the program element, not on a project.
Project MD34 — Short Range Ballistic Missile Defense (SRBMD)(David's Sling Weapon System (DSWS)) — requests $127.0M in FY2027, 42% of the $300.0M requested for program element 0603913C. Year over year it grows 0.0% against FY2026.
Project MD34 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 127.0 |
| FY2026 | Enacted | 127.0 |
| FY2027 | Request | 127.0 |
| FY2028 | Outyear | 127.0 |
| FY2029 | Outyear | 127.0 |
| FY2030 | Outyear | 127.0 |
| FY2031 | Outyear | 127.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Conduct Block 3.2 System Requirements Review. - Initiate Block 4.0 concept definition. - Continue Initial Lot Production of All-weather Stunner. - Continue Full Rate Electro-Optical Stunner production.
Named performers on project MD34
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project MD34 buys
Israeli SRBMD, also known as the DSWS, is designed to counter short range rockets, air breathing threats, medium caliber rockets, and theater ballistic missiles, and is integrated into the Israeli Missile Defense Architecture. The DSWS includes the Stunner Interceptor (Electro-Optical variant), a Missile Firing Unit, a Multi-Mission Radar - Next Generation (MMR-NG), a Launch Site Controller, a Ground Data Link (GDL), and the Golden Almond Battle Management Center (GA BMC). The DSWS can be deployed in a variety of configurations to support the intended mission. The DSWS Block 3 capability expands the range and threat versatility of the system by adding the All Weather Stunner Interceptor, improving the MMR-NG, upgrades to GDL and increasing the capacity of the GA BMC. The U.S. and State of Israel entered into a Memorandum of Understanding on September 2016, in which "Such funding, should over a ten year period beginning in FY 2019 and ending in FY 2028, be provided at a level of $500 million per year." (U.S. contributions only). These funds will be distributed between the Israeli Programs in Research Development Test & Evaluation and Procurement Funds.
- Product Development