RDT&E Project · President's Budget PB2027

PrSM Increment 2

FY2027 Request
$204.4M
◆ New start in FY2027
HitchAI read

Project DL2 — PrSM Increment 2 requests $204.4M in FY2027, 71% of the $288.3M requested for program element 0605231A — a new start, with no prior-year and no current-year money. 1 R-2A activity decomposes the request, 1 new this cycle. LMMFCS is the largest named R-3 performer at $120.3M, 59% of the project's FY2027 R-3 total.

New start

This project requests $204.4M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

MarketLong-Range & Precision Fires

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$204.4M
President's Budget
Project detail

What project DL2 buys

Precision Strike Missile (PrSM) Increment 2 funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM Increment 2 integrates a multi-mode seeker to attack critical time sensitive moving maritime or relocatable land targets. In addition, the PrSM Increment 2 missile design maintains the Increment 1 capability to attack, neutralize, and destroy Increment 1 targets specified in the capability development document (CDD). The draft CDD supporting milestone B includes a new requirement to launch from M270 and HIMARS launchers on maritime platforms. Future PrSM increments will provide increased lethality against hardened targets and extend range capability. FY 2027 funding supports continuation of PrSM Increment 2 technology maturation risk reduction efforts leading to system level prototype flights.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Funding trajectory

Project DL2 funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001502000204.4FY27REQUEST35.2FY2821.0FY2935.8FY3023.9FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request204.4
FY2028Outyear35.2
FY2029Outyear21.0
FY2030Outyear35.8
FY2031Outyear23.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

Increment 2 IntegrationNEW
FY2025 actual
FY2026 enacted
FY2027 request$204.4M

FY2027 planned work Conduct flight test 3, begin engineering development test (EDT) flight testing, complete subsystem qualification testing, develop a pilot production line, conduct a seeker critical design review (CDR), award the EOC-2 production contract (IDIQ delivery order), and prepare for EDT-1 and system CDR.

FY2026 to FY2027 change The FY 2027 funding increase supports flight tests and continuing increment 2 development.

Who's building it

Named performers on project DL2

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

LMMFCS
$120.3M · 59%
WSMR; RTC
$13.3M · 6.5%
S3I
$2.4M · 1.2%