RDT&E Program Element · President's Budget PB2027

Precision Strike Missile (PrSM)

PE 0605231A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$288.3M
◆ Restart — nothing enacted in FY2026
HitchAI read

U.S. Army requests $288.3M in FY2027 against nothing enacted in FY2026 — the program's peak. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. LMMFCS leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$288.3M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$177.3M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $288.3M for Precision Strike Missile (PrSM) under RDT&E program element 0605231A, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001502002500177.3FY25ACTUAL0.0FY26ENACTED288.3FY27REQUEST135.6FY28114.9FY29253.0FY30248.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual177.3
FY2026Enacted0.0
FY2027Request288.3
FY2028Outyear135.6
FY2029Outyear114.9
FY2030Outyear253.0
FY2031Outyear248.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0605231A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

The whole program

PRSM is funded on 5 lines across 2 appropriations

This page shows $288.3M of PRSM, 17% of the program's $1.74B FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
PRECISION STRIKE MISSILE (PRSM)ProcurementArmy1,226.5
PrSM Modular Payload Advanced DevelopmentRDT&EArmy224.8
PRSM totalArmy1,739.6

Lines whose title names the program. 17 further lines only mention PRSM in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$288.3M
House NDAA (HASC)HASC
$288.3M full · +$0
Senate NDAA (SASC)SASC
$288.3M full · +$0
House Approps (HAC-D)HAC_D
$288.3M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

LMMFCS
$147.2M · 51%
Increment 1 - Follow-On Development · FFP
WSMR; RTC
$13.6M · 4.7%
Test Support
Where FY2027 funding flowsShare$M
Industry primes57%163.2
Government labs & warfare centers32%91.7
Other / unspecified12%33.4
FY2027 request100%288.3
See LMMFCS's full federal contract ledger members
Program detail

Mission & acquisition strategy

Precision Strike Missile (PrSM) funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM is the Army's next generation surface-to-surface missile that replaces and improves upon Army Tactical Missile System (ATACMS) capabilities. The PrSM program is a component of an integrated fires development effort that includes survivability, resiliency, and effectiveness improvements against advanced threats from adversaries.

PrSM Increment 1: The PrSM program was designated as an acquisition category IB in 2017. In 2018, Army leaders directed PrSM to accelerate the program and provide an early operational capability (EOC) by FY 2023. The program awarded an Enhanced TMRR (E-TMRR) contract to reduce risk, conduct prototype flight-testing and conduct several engineering and manufacturing development (EMD) activities to accelerate development. In 2020, Army senior leaders approved program acceleration using a single vendor. The program executed E-TMRR as a sole-source effort to demonstrate threshold program requirements and complete sub-assembly qualification activities.

Project DL2, CO3, DL4 — PrSM Increment 2
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0605231A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what LMMFCS has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605231A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Precision Strike Missile (PrSM) (PE 0605231A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605231A
Machine access
Markdown twin /programs/0605231A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$204.4M
President's Budget

PrSM Increment 2 — one RDT&E project inside PE 0605231A. Congressional marks are recorded on the program element, not on a project.

Project DL2 — PrSM Increment 2 — requests $204.4M in FY2027, 71% of the $288.3M requested for program element 0605231A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project DL2 funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001502000204.4FY27REQUEST35.2FY2821.0FY2935.8FY3023.9FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request204.4
FY2028Outyear35.2
FY2029Outyear21.0
FY2030Outyear35.8
FY2031Outyear23.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Increment 2 IntegrationNEW
FY2025 actual
FY2026 enacted
FY2027 request$204.4M

Conduct flight test 3, begin engineering development test (EDT) flight testing, complete subsystem qualification testing, develop a pilot production line, conduct a seeker critical design review (CDR), award the EOC-2 production contract (IDIQ delivery order), and prepare for EDT-1 and system CDR.

Project DL2 — every activity in full →
Who's building it

Named performers on project DL2

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

LMMFCS
$120.3M · 59%
WSMR; RTC
$13.3M · 6.5%
S3I
$2.4M · 1.2%
Project detail

What project DL2 buys

Precision Strike Missile (PrSM) Increment 2 funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM Increment 2 integrates a multi-mode seeker to attack critical time sensitive moving maritime or relocatable land targets. In addition, the PrSM Increment 2 missile design maintains the Increment 1 capability to attack, neutralize, and destroy Increment 1 targets specified in the capability development document (CDD). The draft CDD supporting milestone B includes a new requirement to launch from M270 and HIMARS launchers on maritime platforms. Future PrSM increments will provide increased lethality against hardened targets and extend range capability. FY 2027 funding supports continuation of PrSM Increment 2 technology maturation risk reduction efforts leading to system level prototype flights.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$45.3M
President's Budget
FY2025 Actual
$177.3M
Prior year

Precision Strike Missile (PrSM) — one RDT&E project inside PE 0605231A. Congressional marks are recorded on the program element, not on a project.

Project CO3 — Precision Strike Missile (PrSM) — requests $45.3M in FY2027, 16% of the $288.3M requested for program element 0605231A.

Funding trajectory

Project CO3 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001500177.3FY25ACTUAL45.3FY27REQUEST49.0FY2826.3FY2966.5FY3043.0FY31
Actual Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual177.3
FY2027Request45.3
FY2028Outyear49.0
FY2029Outyear26.3
FY2030Outyear66.5
FY2031Outyear43.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Increment 1: Engineering and Manufacturing Development (EMD)
FY2025 actual$86.7M
FY2026 enacted
FY2027 request

Efforts will focus on hardware builds and training material in preparation for (10) initial operational test & evaluation (IOT&E) flight tests occurring in late FY 2025. Additional FY 2025 efforts include the completion of PQT flight testing, integration with the M270A2 launcher and the new common fire control system (CFCS), cyber…

Increment 1: M-Code Development, Proximity Sensor Redesign, and Software MaintenanceNEW
FY2025 actual
FY2026 enacted
FY2027 request$45.3M

Continues development and qualification of the M-Code guidance set; continues development and qualification of the exportable proximity sensor; continues cybersecurity, continuous software development, and blocking upgrades.

Increment 2: Integration
FY2025 actual$90.7M
FY2026 enacted
FY2027 request

FY 2025 activities support system prototype flight tests against maritime targets and PrSM Increment 2 preliminary design review (PDR). System prototype tests inform the EOC contract award decision scheduled in late FY 2026 in order to begin delivery of EOC missiles by FY 2029.

Project CO3 — every activity in full →
Who's building it

Named performers on project CO3

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

LMMFCS
$26.9M · 59%
Project detail

What project CO3 buys

Precision Strike Missile (PrSM) funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM is the Army's next generation surface-to-surface missile that replaces and improves upon Army Tactical Missile System (ATACMS) capabilities. The PrSM program is a component of an integrated fires development effort that includes survivability, resiliency, and effectiveness improvements against advanced threats from adversaries. These efforts include integration with an evolving common fires mission command, common development tools and processes, and annual test and evaluation to provide data to support program assessments and progress toward closure of performance gaps. PrSM requirements include: threshold max range of 400 kilometers (km), specified lethality against the designated target set, a launch pod missile container (LPMC) that holds two missiles, survivability in a threat environment, and compatibility with the existing launcher platforms (M270A2 Multiple Launch Rocket System (MLRS) and M142 High Mobility Artillery Rocket System (HIMARS)). PrSM will meet cluster and insensitive munition (IM) requirements and is designed with an open system approach that provides the capability for future growth to counter new and emerging threats. PrSM is an incremental development program. The munitions developed under this funding line are part of the MLRS Family of Munitions (MFOM) that are deployed by the M142 HIMARS and M270 MLRS launchers. The mission of PrSM Increment 1 is to attack, neutralize, suppress, destroy targets using missile delivered indirect precision fires. PrSM will provide joint force commanders with a 24/7, all-weather capability to attack critical and time sensitive area and point targets including threat air defense, missile launchers, command and control centers, assembly/staging areas and high payoff targets at all depths of the multi-domain battlefield. PrSM will counter the enemy's ability to conduct combat maneuver and air defense operations.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$38.6M
President's Budget

PrSM Increment 4 — one RDT&E project inside PE 0605231A. Congressional marks are recorded on the program element, not on a project.

Project DL4 — PrSM Increment 4 — requests $38.6M in FY2027, 13% of the $288.3M requested for program element 0605231A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project DL4 funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150038.6FY27REQUEST51.4FY2867.5FY29150.7FY30181.8FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request38.6
FY2028Outyear51.4
FY2029Outyear67.5
FY2030Outyear150.7
FY2031Outyear181.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Increment 4 Prototype DevelopmentNEW
FY2025 actual
FY2026 enacted
FY2027 request$38.6M

Initiate efforts under a prototype OTA contract to design, develop and participate in a competitive fly-off demonstration of full missile system in 4QFY 2028.

Project DL4 — every activity in full →
Who's building it

Named performers on project DL4

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

WSMR; RTC
$0.2M · 0.6%
Project detail

What project DL4 buys

Precision Strike Missile (PrSM) Increment 4 funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM Increment 4 adds an extended range capability to engage moving maritime, and relocatable land targets at greater ranges than PrSM Increment 1 and 2 and combines improved motor technology and developmental warhead with a PrSM Increment 2 seeker to provide an extremely accurate capability against critical and high-value targets. The PrSM Increment 4 program is a component of an integrated fires development effort that includes survivability, resiliency, and effectiveness improvements against advanced threats from near-peer adversaries. These efforts include integration with an evolving common fires mission command, common development tools and processes, and annual test and evaluation to provide data to support program assessments and progress toward closure of performance gaps. PrSM Increment 4 requirements include: range of greater than 1,000 km, specified lethality against the designated target set, and an MLRS Family of Munition (MFOM) missile pod that holds no less than two missiles, survivability in a threat environment, and compatibility with the M142 High Mobility Artillery Rocket System (HIMARS). PrSM Increment 4 will meet cluster and insensitive munition (IM) requirements and is designed with an open system architecture.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation