RDT&E Project · President's Budget PB2027

RADIO MODERNIZATION

Project C2B·PE 0605330A — C2 Transport·U.S. Army·BA5
FY2027 Request
$25.1M
◆ New start in FY2027
HitchAI read

Project C2B — RADIO MODERNIZATION requests $25.1M in FY2027, 55% of the $45.4M requested for program element 0605330A — a new start, with no prior-year and no current-year money. 3 R-2A activities decompose the request, 3 new this cycle. NSA is the largest named R-3 performer at $0.6M, 2.5% of the project's FY2027 R-3 total.

New start

This project requests $25.1M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

FY2027 Request
$25.1M
President's Budget
Project detail

What project C2B buys

This funding directly supports the Army's Next Generation Command and Control (NGC2) initiative, specifically targeting the modernization of the Command and Control (C2) Transport Layer. The C5ISR Modular Open Suite of Standards (CMOSS) Mounted Form Factor (CMFF) is a cornerstone of this effort, embodying the key tenets of NGC2 to deliver a more agile, interoperable, and data-centric communications backbone for ground and aviation platforms. Project C2B - Radio Modernization: Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Modular Open Suite of Standards (CMOSS) Mounted Form Factor (CMFF) Radio Card Mid-Tier Acquisition (MTA) Rapid Prototype (RP) program delivers Software Defined Radio (SDR) cards, Cryptographic Subsystem (CSS) cards, Digital Radio Heads (DRH) and Victory Audio Adapter (VAX) required by the CMOSS Mounted Form Factor (CMFF) Abbreviated Capability Development Document (A-CDD) for the Ground and Aviation's tactical communication requirements utilizing an Other Transaction Authority(OTA) contracting strategy. CMFF Radio Cards provide simultaneous transmission and reception of multiple waveforms across multiple channels in a single or multiple SDR card(s) integrated in the CMFF chassis with NSA certifiable CSS and interoperable with the Digital Radio Head. CMFF Radio cards initial capability development includes but is not limited to Single Channel Ground and Airborne Radio System (SINCGARS), Air Traffic Control (ATC), Warrior Robust Enhanced Network (WREN) and future advanced networking waveforms; initial Cryptographic Subsystem Card (CSS), Digital Radio Head (DRH), and Victory Audio Adapter (VAX). Advanced capability development includes but is not limited to Mobile User Objective System (MUOS), Link-16, High Frequency (HF), HAVEQUICK (HQ), Second generation Anti-jam Tactical UHF Radio for NATO (SATURN), Demand Assigned Multiple Access (DAMA) and future advanced networking waveforms; and final CSS, DRH and VAX. The total cost of the CMFF RC Middle Tier of Acquisition (MTA) effort is $96.1 million RDT&E from FY25 to FY29. FY2027 funding supports Hardware and Software Development (SDR card, CSS card, Digital Radiohead and Victory Audio Adapter), Test, Integration and Evaluation, and Program Management Support.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
Funding trajectory

Project C2B funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.1FY27REQUEST25.4FY2825.6FY2925.6FY3025.8FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request25.1
FY2028Outyear25.4
FY2029Outyear25.6
FY2030Outyear25.6
FY2031Outyear25.8
Inside the project

3 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual
FY2026 enacted
FY2027 request$18.9M

FY 2027 Research Development Test & Evaluation (RDT&E) funding will continue to support prototyping contracts with vendors and provide technical systems engineering support for Hardware & Software development of the SDR card, CSS card, DRH and Victory Audio Adapter.

Read the FY2027 plan →
Program Management SupportNEW
FY2025 actual
FY2026 enacted
FY2027 request$3.8M

FY2027 planned work FY 2027 Research Development Test & Evaluation (RDT&E) funds Matrix and contractor support to assist with the CMFF radio card program development, testing, integration and evaluation and program oversight.

FY2026 to FY2027 change Funds transferred in FY27 from 0604805A project DH4 CMFF Radio Cards to project C2B Radio Modernization under a new Parent program element 0605330A / C2 Transport. Funds transferred in FY27 from 0604541A project BT5 Integrated Tactical Network/Enterprise Network to project C2B Radio Modernization under a new Parent program element 0605330A / C2 Transport.

Test and EvaluationNEW
FY2025 actual
FY2026 enacted
FY2027 request$2.4M

FY2027 planned work FY 2027 Research Development Test & Evaluation (RDT&E) funding supports CMFF integration, testing, and evaluation of the Software Defined Radio (SDR) cards, Cryptographic Subsystem (CSS) cards, Digital Radio Heads and support from the Crypto Mod lab, Open Innovation Lab (OIL), and Prototype Integration Facility (PIF). As well as multiple technical demonstrations to prove system interoperability and maturation.

FY2026 to FY2027 change Funds transferred in FY27 from 0604805A project DH4 CMFF Radio Cards to project C2B Radio Modernization under a new Parent program element 0605330A / C2 Transport. Funds transferred in FY27 from 0604541A project BT5 Integrated Tactical Network/Enterprise Network to project C2B Radio Modernization under a new Parent program element 0605330A / C2 Transport.

Who's building it

Named performers on project C2B

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NSA
$0.6M · 2.5%