RDT&E Program Element · President's Budget PB2027

C2 Transport

PE 0605330A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$45.4M
Army · RDT&E
◆ New start in FY2027 — no prior-year funding
HitchAI read

U.S. Army requests $45.4M in FY2027 against nothing enacted in FY2026 — the program's peak, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. L3Harris leads the industry work.

FY2027 Request
$45.4M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $45.4M for C2 Transport under RDT&E program element 0605330A, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2500.0FY25ACTUAL0.0FY26ENACTED45.4FY27REQUEST43.2FY2841.0FY2941.0FY3041.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request45.4
FY2028Outyear43.2
FY2029Outyear41.0
FY2030Outyear41.0
FY2031Outyear41.4
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0605330A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$45.4M
House NDAA (HASC)HASC
$45.4M full · +$0
Senate NDAA (SASC)SASC
$45.4M full · +$0
House Approps (HAC-D)HAC_D
$45.4M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

L3Harris
$4.7M · 10%
Protected SATCOM, Resilient Anti-Jam Modem Development and Emerging Threat Mitigation · FPIF
Where FY2027 funding flowsShare$M
Industry primes12%5.4
Government labs & warfare centers4.0%1.8
Other / unspecified84%38.2
FY2027 request100%45.4
See L3Harris's full federal contract ledger members
Program detail

Mission & acquisition strategy

C2 Transport 0605330A is not a new start line, it is a consolidation of MILSATCOM System Engineering (0303142 456), Unified Network Technology Trans & Integ (UNTTI) (0604818 DD1), and Protected Tactical Satellite (0303142 CO7), CMFF Radio Cards (0604805 DH4), and Integrated Tactical Network/Enterprise Network (0604541 BT5). The C2 Transport Layer supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems. The RDT&E funding line consists of two portfolios: Satellite and Network Modernization (C2A) and Radio Modernization (C2B).

The CMOSS Mounted Form Factor (CMFF) program responds to Army requirements contained in the CMFF Abbreviated Capability Development Document (A-CDD), approved on 4 January 2021. A new start in FY 2025, the program is approved as a Middle Tier of Acquisition (MTA) Rapid Prototyping (RP) as of 04 December 2025. The MTA RP effort spans the initial five years of the program and will prototype the tactical radio communication components to include: Software Defined Radio (SDR) cards, Cryptographic Subsystem (CSS) cards, Digital Radioheads (DRH) and Victory Audio Adapters (VAX). Multiple Other Transaction Authority (OTA) contracts will be awarded to support the development prototype hardware and software solutions in support of this program.

Project C2B, C2A — RADIO MODERNIZATION
  • Management Services
  • Product Development
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0605330A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what L3Harris has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605330A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "C2 Transport (PE 0605330A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605330A
Machine access
Markdown twin /programs/0605330A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$25.1M
President's Budget

RADIO MODERNIZATION — one RDT&E project inside PE 0605330A. Congressional marks are recorded on the program element, not on a project.

Project C2B — RADIO MODERNIZATION — requests $25.1M in FY2027, 55% of the $45.4M requested for program element 0605330A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project C2B funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.1FY27REQUEST25.4FY2825.6FY2925.6FY3025.8FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request25.1
FY2028Outyear25.4
FY2029Outyear25.6
FY2030Outyear25.6
FY2031Outyear25.8
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Program Management SupportNEW
FY2025 actual
FY2026 enacted
FY2027 request$3.8M

FY 2027 Research Development Test & Evaluation (RDT&E) funds Matrix and contractor support to assist with the CMFF radio card program development, testing, integration and evaluation and program oversight.

FY2025 actual
FY2026 enacted
FY2027 request$18.9M

FY 2027 Research Development Test & Evaluation (RDT&E) funding will continue to support prototyping contracts with vendors and provide technical systems engineering support for Hardware & Software development of the SDR card, CSS card, DRH and Victory Audio Adapter.

Read the FY2027 plan →
Test and EvaluationNEW
FY2025 actual
FY2026 enacted
FY2027 request$2.4M

FY 2027 Research Development Test & Evaluation (RDT&E) funding supports CMFF integration, testing, and evaluation of the Software Defined Radio (SDR) cards, Cryptographic Subsystem (CSS) cards, Digital Radio Heads and support from the Crypto Mod lab, Open Innovation Lab (OIL), and Prototype Integration Facility (PIF). As well as multiple…

Project C2B — every activity in full →
Who's building it

Named performers on project C2B

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NSA
$0.6M · 2.5%
Project detail

What project C2B buys

This funding directly supports the Army's Next Generation Command and Control (NGC2) initiative, specifically targeting the modernization of the Command and Control (C2) Transport Layer. The C5ISR Modular Open Suite of Standards (CMOSS) Mounted Form Factor (CMFF) is a cornerstone of this effort, embodying the key tenets of NGC2 to deliver a more agile, interoperable, and data-centric communications backbone for ground and aviation platforms. Project C2B - Radio Modernization: Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Modular Open Suite of Standards (CMOSS) Mounted Form Factor (CMFF) Radio Card Mid-Tier Acquisition (MTA) Rapid Prototype (RP) program delivers Software Defined Radio (SDR) cards, Cryptographic Subsystem (CSS) cards, Digital Radio Heads (DRH) and Victory Audio Adapter (VAX) required by the CMOSS Mounted Form Factor (CMFF) Abbreviated Capability Development Document (A-CDD) for the Ground and Aviation's tactical communication requirements utilizing an Other Transaction Authority(OTA) contracting strategy. CMFF Radio Cards provide simultaneous transmission and reception of multiple waveforms across multiple channels in a single or multiple SDR card(s) integrated in the CMFF chassis with NSA certifiable CSS and interoperable with the Digital Radio Head. CMFF Radio cards initial capability development includes but is not limited to Single Channel Ground and Airborne Radio System (SINCGARS), Air Traffic Control (ATC), Warrior Robust Enhanced Network (WREN) and future advanced networking waveforms; initial Cryptographic Subsystem Card (CSS), Digital Radio Head (DRH), and Victory Audio Adapter (VAX). Advanced capability development includes but is not limited to Mobile User Objective System (MUOS), Link-16, High Frequency (HF), HAVEQUICK (HQ), Second generation Anti-jam Tactical UHF Radio for NATO (SATURN), Demand Assigned Multiple Access (DAMA) and future advanced networking waveforms; and final CSS, DRH and VAX. The total cost of the CMFF RC Middle Tier of Acquisition (MTA) effort is $96.1 million RDT&E from FY25 to FY29. FY2027 funding supports Hardware and Software Development (SDR card, CSS card, Digital Radiohead and Victory Audio Adapter), Test, Integration and Evaluation, and Program Management Support.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
FY2027 Request
$20.3M
President's Budget

SATELLITE AND NETWORK MODERNIZATION — one RDT&E project inside PE 0605330A. Congressional marks are recorded on the program element, not on a project.

Project C2A — SATELLITE AND NETWORK MODERNIZATION — requests $20.3M in FY2027, 45% of the $45.4M requested for program element 0605330A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project C2A funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

020.3FY27REQUEST17.8FY2815.4FY2915.4FY3015.6FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request20.3
FY2028Outyear17.8
FY2029Outyear15.4
FY2030Outyear15.4
FY2031Outyear15.6
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted
FY2027 request$15.5M

Funds will be used for prototype development and modification of emerging technology in transport modernization terminal and network efficiency, along with integration and testing of modernized solutions. Funds evaluation of hardware form factor variants, supports integration and testing with various Army platforms and associated program…

Read the FY2027 plan →
Protected SATCOM, Resilient Anti-Jam Modem Dev and Emerging Threat MitigationNEW
FY2025 actual
FY2026 enacted
FY2027 request$4.7M

FY2027 funds support RAM development, preparation of efforts to support Milestone C and add enduring modernization efforts that continue system development with pursuit to reduce tech debt proactively and integrate new technologies for relevancy over time and ensuring systems remain efficient, secure, and a capable of meeting evolving…

Project C2A — every activity in full →
Who's building it

Named performers on project C2A

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

L3Harris
$4.7M · 23%
Project detail

What project C2A buys

Project C2A FY2027 funding supports two (2) distinct lines of effort: Protected SATCOM Resilient Anti-Jam Modem (RAM) Development and Unified Network Technology Transition and Integration (UNTTI). Protected SATCOM provides funding for continued Resilient Anti-Jam Modem (RAM) development, testing and certification of production representative modems, incorporating Army requirements, to support continued spiral development of critical protected communications capabilities to address resiliency in jamming environments. RAM provides the ability for Army tactical terminals to be resilient in a contested environment and protect against catastrophic loss of situational awareness and command and control during critical battle movement with Anti-Jam capabilities. RAM will provide on the move and early entry satellite terminals with adaptive, anti-jam communications for the highest levels of protected communications in multi domain operations and offer the tactical Army protection against interference that is either intentional or unintentional. Satellite and Network Modernization funding supports Unified Network Technology Transition and Integration (UNTTI) an RDT&E initiative enabling transport agnostic, high-capacity and resilient tactical communications for expeditionary operations. These efforts support system/subsystem development and demonstration, aimed at integration, maturation, evaluation, and testing to demonstrate systems against requirements. TEM Projects, Line of Sight Modernization, SATCOM Modernization, Transport Modernization, Secure Cellular, Next Generation Tactical Terminal (NGTT), and System of Systems (SoS) Training. These technologies support new and improved communications capabilities with reduced Size, Weight, and Power (SWAP), while increasing throughput, providing network resiliency and Low Probability of Intercept/Low Probability of Detection (LPI/LPD) capabilities. Satellite and Network Modernization procures, modifies, integrates, and tests system prototypes to demonstrate enhanced capabilities in accordance with Army modernization priorities.

R-3 lines of work
  • Product Development