RDT&E Program Element · President's Budget PB2027

C2 Infrastructure

PE 0605333A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$64.8M
Army · RDT&E
◆ New start in FY2027 — no prior-year funding
HitchAI read

U.S. Army requests $64.8M in FY2027 against nothing enacted in FY2026 — the program's peak. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Vaious leads the industry work.

FY2027 Request
$64.8M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $64.8M for C2 Infrastructure under RDT&E program element 0605333A, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255000.0FY25ACTUAL0.0FY26ENACTED64.8FY27REQUEST63.9FY2861.2FY2957.5FY3058.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request64.8
FY2028Outyear63.9
FY2029Outyear61.2
FY2030Outyear57.5
FY2031Outyear58.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0605333A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$64.8M
House NDAA (HASC)HASC
$64.8M full · +$0
Senate NDAA (SASC)SASC
$64.8M full · +$0
House Approps (HAC-D)HAC_D
$64.8M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Vaious
$2.3M · 3.5%
Cyber Security Architecture · CPFF
Where FY2027 funding flowsShare$M
Industry primes3.5%2.3
Other / unspecified97%62.6
FY2027 request100%64.8
See Vaious's full federal contract ledger members
Program detail

Mission & acquisition strategy

Program Element (PE) 0605333A Command and Control (C2) Infrastructure is established in FY 2027 as part of a new funding structure for the Next Generation Command and Control (NGC2) investment in modernization of Army C2 systems. A funding line consolidation and structure change for the NGC2 investment provides clarity and transparency for the NGC2 four-layered approach (Applications, Data, Transport, and Infrastructure). This C2 Infrastructure PE supports NGC2 efforts under the Infrastructure layer and does not constitute a new program or effort.

The CMOSS Mounted Form Factor (CMFF) Mounted Common Infrastructure (MCI) Chassis program responds to Army requirements in the approved CMFF Abbreviated Capability Development Document (A-CDD), validated on 4 January 2021, and is pursuing a Middle Tier of Acquisition (MTA) Rapid Prototyping (RP) acquisition pathway, which was initiated in FY2025. The MTA RP effort spans five years and will prototype the chassis and software that manages the operation of the chassis, as well as integrate the capability cards and peripheral enabling devices, assuring the integrated solution operates as required.

Project C2I, C2G, C2H — MOUNTED C2 DEVELOPMENT
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0605333A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Vaious has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605333A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "C2 Infrastructure (PE 0605333A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605333A
Machine access
Markdown twin /programs/0605333A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$31.8M
President's Budget

MOUNTED C2 DEVELOPMENT — one RDT&E project inside PE 0605333A. Congressional marks are recorded on the program element, not on a project.

Project C2I — MOUNTED C2 DEVELOPMENT — requests $31.8M in FY2027, 49% of the $64.8M requested for program element 0605333A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project C2I funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25031.8FY27REQUEST31.6FY2828.6FY2924.7FY3025.0FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request31.8
FY2028Outyear31.6
FY2029Outyear28.6
FY2030Outyear24.7
FY2031Outyear25.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Product DevelopmentNEW
FY2025 actual
FY2026 enacted
FY2027 request$16.3M

Enhancing the design of on-the-move command posts is essential for evolving capabilities that increase wireless connectivity, mobility, functionality, and scalability. Additionally, funding will supports development and systems engineering efforts, further contributing to these overarching capabilities

Support CostsNEW
FY2025 actual
FY2026 enacted
FY2027 request$7.2M

Funding supports Contract and Matrix personnel involved in the execution of the mission requirements to include design, testing, and training, as well as updates to the technical data packages and various unit engagements.

Systems Test and EvaluationNEW
FY2025 actual
FY2026 enacted
FY2027 request$8.3M

Testing and experimentation for on-the-move command post capabilities and modular command posts. Additionally, it funds the test and evaluation activities for multiple test events, including the Initial Operational Test (IOT), ensuring comprehensive assessment and validation of these critical capabilities.

Project C2I — every activity in full →
Project detail

What project C2I buys

Project C2I: Mounted Command and Control (C2) Development is established in FY 2027 as part of a new funding structure for the Next Generation Command and Control (NGC2) investment in modernization of Army C2 systems. This project represents a funding line consolidation and structure change for the NGC2 Infrastructure layer and does not constitute a new program or effort. Funding for NGC2 Infrastructure activities was provided in FY2026 under PE 0604818A Project ER9 Expeditionary Army Command Post and PE 0605236A Project CQ1 Tactical Communication Network Evaluation. Command posts provide locations from which commanders, assisted by their staffs, command operations and integrate/synchronize combat power to accomplish missions across the range of military operations. Commanders organize mission command systems into command posts based on mission requirements and the situation that will best assist them in exercising command and control of assigned and attached forces. Command post survivability is vital to mission success. Depending on the threat, command posts need to remain small and highly mobile, especially at echelons below Division. Command posts are easily acquired and targeted by our adversaries when concentrated. Command post survivability is increased via dispersion, reduced size, redundancy, mobility, as well as camouflage and concealment. Command post survivability is further enhanced via dismounted operations that can take advantage of cover or shielding by terrain features or urban structures. This project funds development to provide a drop-in replacement for existing systems, using available platform space and power applications. The capability provides on-the-move bandwidth needed for Warfighting Applications in support of the Army NGC2 initiative to modernize C2 systems, Infrastructure layer. A modular open systems approach is used to maximize flexibility through rapid technology insertion and non-proprietary technologies and provides resilient communications. FY2027 funding supports development and systems engineering efforts, as well as enhancing command post capabilities. This funding emphasizes continuous improvements for on-the-move operations, modular command posts, and survivability.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$17.8M
President's Budget

MODULAR C2 INFRASTRUCTURE — one RDT&E project inside PE 0605333A. Congressional marks are recorded on the program element, not on a project.

Project C2G — MODULAR C2 INFRASTRUCTURE — requests $17.8M in FY2027, 27% of the $64.8M requested for program element 0605333A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project C2G funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

017.8FY27REQUEST16.9FY2816.9FY2917.0FY3017.1FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request17.8
FY2028Outyear16.9
FY2029Outyear16.9
FY2030Outyear17.0
FY2031Outyear17.1
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

CMFF - Product DevelopmentNEW
FY2025 actual
FY2026 enacted
FY2027 request$12.2M

Funding completes the base two-year, multi-vendor OTA, for ground and aviation chassis development of Block 1 and begins Block 2 chassis development.

CMFF - Test and EvaluationNEW
FY2025 actual
FY2026 enacted
FY2027 request$2.7M

Funding supports remaining testing activities leading into the final Block 1 Soldier Touch Point (STP) Development Test (DT) event in FY27.

CMFF - Program Management SupportNEW
FY2025 actual
FY2026 enacted
FY2027 request$2.9M

Funding continues to provide the prototype development, systems engineering, technical and business Matrix and Contractor personnel to support the CMFF MCI Chassis program efforts.

Project C2G — every activity in full →
Project detail

What project C2G buys

Project C2G: Modular Command and Control (C2) Infrastructure is established in FY 2027 as part of a new funding structure for the Next Generation Command and Control (NGC2) investment in the modernization of Army C2 systems. This project represents a funding line consolidation and structure change for the NGC2 Infrastructure Layer and does not constitute a new program or effort. Funding for NGC2 Infrastructure activities was provided in FY2026 under PE 0604818A Project 323 Common Hardware Systems and PE 0604805A Project DH5 Mounted Form Factor Chassis. Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Modular Open Suite of Standards (CMOSS) Mounted Form Factor (CMFF) is a defined suite of open architecture which utilizes a modular open systems approach (MOSA) that implements C5ISR capabilities away from separate "boxes" on individual platforms and ensures commonality across multiple vehicles and platforms. The CMFF Mounted Common Infrastructure (MCI) Chassis will use open standards which make it simpler and more cost-effective to upgrade capabilities and/or keep pace with commercial technology by eliminating complex integration challenges and proprietary interfaces. The CMFF capability can only be realized when paired with the development of associated capability cards for integration into the chassis and peripheral enabling devices, such as antennae and appropriate user interfaces. Other programs are responsible for funding and developing the capability cards and peripheral devices; the CMFF MCI Chassis program is responsible for chassis development, system of system integration of capability cards and external resources into the chassis and platform integration. The total cost of the CMFF MCI Middle Tier of Acquisition (MTA) Rapid Prototyping (RP) effort is $82.5 million RDT&E from FY25 to FY27. The remainder of the CMFF MCI MTA RP is fully funded across the Future Years Defense Program. FY 2027 funding will complete CMFF MCI Block 1 chassis product development effort (hardware and software development and prototype manufacturing), conduct the Block 1 Soldier Touch Point (STP) Development Test, and supports the start of Block 2 chassis development efforts.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
FY2027 Request
$15.2M
President's Budget

C2 SYSTEMS ENGINEERING — one RDT&E project inside PE 0605333A. Congressional marks are recorded on the program element, not on a project.

Project C2H — C2 SYSTEMS ENGINEERING — requests $15.2M in FY2027, 23% of the $64.8M requested for program element 0605333A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project C2H funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

015.2FY27REQUEST15.4FY2815.7FY2915.9FY3016.0FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request15.2
FY2028Outyear15.4
FY2029Outyear15.7
FY2030Outyear15.9
FY2031Outyear16.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

C2 Integration Test & SupportNEW
FY2025 actual
FY2026 enacted
FY2027 request$4.5M

This project will continue to provide the infrastructure and support to conduct an increased level of integration testing and required maintenance to support data-centric network design. This includes: - Developing integration testing strategies designed to enhance Development Security Operations (DEVSECOPS) implementation; as well as to…

Cyber Security ArchitectureNEW
FY2025 actual
FY2026 enacted
FY2027 request$4.5M

This project will continue to: - Implement ARCYBER, CIO, G6 and CYBERCOM guidance for execution of Cyber Security policies and procedures at the tactical level; - Document the current tactical network security architecture while developing recommendations to eliminate inconsistencies/duplications, increase the security posture, decrease…

SoS Engineering and DevelopmentNEW
FY2025 actual
FY2026 enacted
FY2027 request$6.2M

To ensure successful development of systems and improved technical integration across the Unified Network this project will continue to: - Develop SoS Engineering tools, standards, products and interfaces to support strategic decisions and address operational technical challenges for DoW-driven initiatives; - Provide SoS engineering…

Project C2H — every activity in full →
Who's building it

Named performers on project C2H

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Vaious
$2.3M · 15%
Project detail

What project C2H buys

Project C2H: Command and Control (C2) SYSTEMS ENGINEERING is established in FY 2027 as part of a new funding structure for the Next Generation Command and Control (NGC2) investment in modernization of Army C2 systems. This project represents a funding line consolidation and structure change for the NGC2 Infrastructure Layer and does not constitute a new program or effort. Funding for NGC2 Infrastructure activities was provided in FY2026 under PE 0604818A Project C34 Army Tactical Command and Control Systems Engineering and PE 0604541A Project BT2 Command Post Mobility/Survivability. NGC2 is one of the Army's highest modernization priorities and will enhance the ability to conduct multi-domain operations by integrating advanced technologies, improving interoperability, and increasing the speed and accuracy of decision-making processes. This line specifically supports Project C2 SYSTEMS ENGINEERING, which supports the Army's Network Modernization Strategy priorities including Army Unified Network Plan, Multi-Domain Operations, Joint All Domain Command and Control (JADC2), Data Modernization and emerging data-centric requirements. This project coordinates technical efforts across and outside of CPE Command, Control, Information Network (C2IN) to ensure integration with the current and future Mission Command Network; provides technical support to programs, informing design and solutions with specific emphasis on the ability for different program efforts to be integrated and interoperable with one another. FY2027 funding request supports the CPE C2IN System of Systems (SoS) Engineering and integration, acquisition management, testing, fielding and sustainment support to ensure interoperability and affordability within the CPE C2IN portfolio, with increased emphasis on immediate Warfighter needs as well as leveraging emerging technologies. This funding supports the modernization of C2 systems by integrating complex networked systems at scale. It enables the continuous design, testing, and validation of multiple network architectures, incorporating direct end-user feedback to enhance the security and resiliency and ensure network cohesiveness and effectiveness.

R-3 lines of work
  • Product Development
  • Test and Evaluation