RDT&E Project · President's Budget PB2027

T-45 SLAP

Project 3182·PE 0702207N — Depot Maintenance (NON-IF)·U.S. Navy·BA7
FY2027 Request
$0.5M
▼ 97% vs FY2026
HitchAI read

Project 3182 — T-45 SLAP requests $0.5M in FY2027, 5.9% of the $8.1M requested for program element 0702207N, down 97% on FY2026. 1 R-2A activity decomposes the request. NAWCAD is the largest named R-3 performer at $0.5M, 100% of the project's FY2027 R-3 total.

FY2027 Request
$0.5M
▼ 97% vs FY2026
FY2026 Enacted
$14.8M
▲ 2968% vs FY2025
FY2025 Actual
$0.5M
Prior year
Project detail

What project 3182 buys

The T-45 Service Life Assessment Program (SLAP) is assessing the structural and subsystem conditions of the T-45 fleet in order to determine what modifications are necessary to extend the aircraft designed life limits to allow it to achieve Chief of Naval Operations (CNO) inventory requirements. The goal of the T-45 SLAP program is to identify critical structures and components that can extend the aircraft designed service life to support IPP and Naval Flight Officer Training Requirements (NTR) until 2035. This initial subsystem assessment, based on the updated fleet aircraft usage spectrum and future predicted training missions of the T-45 aircraft, found 79 dispositions requiring further analysis, teardowns, age explorations, recertification and/or testing. The assessment of the subsystems that make up these 79 dispositions will address all critical subsystems required and their ability to maintain IPP/NTR until 2035, analysis and studies will be conducted to outline improvements, assess manufacturing capabilities, prototype redesign and test of subsystems for trainer aircraft. The current life limits for the T-45 is 13,000 Flight Hours (FH). The T-45 SLAP program of record states the SLAP goals is 19,800 FH. This effort is required to be conducted for these subsystems to ascertain what actions and modifications must be taken to safely operate each system beyond its designed life until the targeted end of service life.

R-3 lines of work
  • Product Development
  • Support
  • Management Services
Funding trajectory

Project 3182 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.5FY25ACTUAL14.8FY26ENACTED0.5FY27REQUEST0.5FY280.5FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.5
FY2026Enacted14.8
FY2027Request0.5
FY2028Outyear0.5
FY2029Outyear0.5
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

T-45 SLAP▼ 97%
FY2025 actual$0.5M
FY2026 enacted$14.8M
FY2027 request$0.5M

FY2027 planned work Continuation of labor support for development, integration, test and certification of subsystem SLAP with the expectation of extending the current service life.

FY2026 to FY2027 change Decrease of ($14.312) is due to DON reprioritizing funds for higher priority requirements ($13.654M) and reduced government analysis and studies to outline improvements, assess manufacturing capabilities, prototype redesign and test of subsystems for trainer aircraft ($0.658M).

FY2026 plans — current year Continuation of labor support for development, integration, test and certification of subsystem SLAP.

Who's building it

Named performers on project 3182

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCAD
$0.5M · 100%