R-2A Activity · President's Budget PB2027

Combatant Craft Mission Equipment (CCME)

Activity a2·Project S1684 — Surface Craft·PE 1160483BB·Defense-Wide
FY2027 Request
$17.8M
◆ Restart — nothing in FY2026
HitchAI read

This activity requests $17.8M in FY2027, 27% of project S1684 — a restart, funded in FY2025 and zeroed in FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

Restart

This activity was funded in FY2025 ($3.3M), zeroed in FY2026, and requests $17.8M again in FY2027. A restart has an incumbent and a new start does not; with a zero current year there is no percentage to quote, which is why it appears in no growth ranking.

FY2027 Request
$17.8M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$3.3M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project S1684 of PE 1160483BB. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continues ALTPNT capability development; continues the AI/ML data collection study to provide future enhancement to surface crafts; continues further development of the MMS which will integrate current and future system displays into one software suite; Continues unique power and energy capabilities such as hybrid electric propulsion; transitions a passive ranging capability which will integrate next generation ranging technology into the CCFLIR II and FLIR III systems; begins transition planning to the Small Unmanned Surface Vehicle and unmanned systems sensor/ payload integration; continues development of Combatant Craft Assault (CCA) and Combatant Craft Medium (CCM) simulators; continues studies to enhance craft survivability.

FY2026 to FY2027 change

Increase of $17.794 million supports both new and continued integration along with testing and modernization of multiple ALTPNT, C5ISR, hybrid propulsion, signature, and survivability technologies to reduce operational risk and ensure agility.

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue ALTPNT capability development; continue the Artificial Intelligence/Machine Learning (AI/ML) data collection study to provide future enhancement to surface crafts; further develop the Mission Management System (MMS) which will integrate current and future system displays into one software suite; begin unique power and energy capabilities such as hybrid electric propulsion; transition a passive ranging capability which will integrate next generation ranging technology into the Combatant Craft Forward Looking Infrared (CCFLIR) II system; begin transition planning to the Small Unmanned Surface Vehicle and unmanned systems sensor/payload integration; continue development of Combatant Craft Assault (CCA) and Combatant Craft Medium (CCM) simulators; continue studies to enhance craft survivability. Note: FY 2026 President's Budget included $0.00 million in discretionary funding and $8.556 million in mandatory funding for CCME.

FY2025 accomplishments

Continue Alternative Positioning, Navigation & Timing (ALTPNT) capability development; continue development of the Mission Management System which will integrate current and future system displays into one software suite; begin unique power and energy capabilities such as hybrid electric propulsion; begin Artificial Intelligence/Machine Learning (AI/ML) data collection study to provide future enhancement to surface crafts; begin Small Unmanned Surface Vehicles (SUSV) and Unmanned Systems (UxS) sensor/payload integration. Continue development of Combatant Craft Assault (CCA) and Combatant Craft Medium (CCM) simulators; continue studies to enhance craft survivability.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

03.3FY25ACTUAL0.0FY26ENACTED17.8FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual3.3
FY2026Enacted0.0
FY2027Request17.8

This activity is 27% of project S1684's FY2027 request and 5.1% of PE 1160483BB's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

8 activities in project S1684

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Combatant Craft Medium (CCM), Program Number 818$43.5M RESTART
Combatant Craft Mission Equipment (CCME) — this activity$17.8M RESTART
Combatant Craft Assault (CCA), Program Number 820$1.8M RESTART
Combatant Craft Heavy (CCH), Program Number 819$1.0M RESTART
Special Operations Craft Riverine (SOCR), Program Number 821$0.6M RESTART
Maritime Precision Engagement (MPE), Program Number 671$0.0M
Combatant Craft Forward Looking Infrared (CCFLIR) Program No. 822$0.0M
Classified Program$0.0M
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 1160483BB, project S1684 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.