R-2A Activity · President's Budget PB2027

GPS III Follow-On (GPS IIIF) Development

Activity a0·Project 653170 — GPS IIIF·PE 1203269SF·U.S. Space Force
FY2027 Request
$59.3M
▼ 34% vs FY2026
HitchAI read

This activity requests $59.3M in FY2027, 100% of project 653170, down 34% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$59.3M
▼ 34% vs FY2026
FY2026 Enacted
$89.6M
▼ 48% vs FY2025
FY2025 Actual
$171.2M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 653170 of PE 1203269SF. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue Development of GPS IIIF SV 11 and SV12. Continue development and initiate launch vehicle assembly of GPS IIIF SV12. Finalize the build, qualification, and delivery of GSS+ which will be utilized for Mission Readiness testing, Integrated Cyber Testing, System Integration Demo 31, and Space Vehicle risk reduction events and provide critical capabilities for on- orbit checkout testing (OOCT) and anomaly resolution for the GPS IIIF constellation. As part of overall GPS IIIF advanced capabilities development, continue developing the Enhanced Command & Control/Modular Open System Approach capability through continued special studies and reviews, continue development toward a GPS IIIF optical crosslinks demonstration (as a follow-on to the GPS III SV10 crosslinks demonstration), and continue development of the On-Orbit Reprogramming capability. GPS IIIF will continue special studies targeted to mitigate on-ramp capability risks. Rapidly respond to implement system resiliency and situational awareness necessary to operate in the contested space domain. Activities may include, but are not limited to program office support, studies, technical analysis, experimentation, risk reduction, prototyping, and activities that may leverage commercial, U.S. Government partnership, and international opportunities to respond to existing and emerging adversarial threats with speed and agility.

FY2026 to FY2027 change

FY 2027 Funding decreased due to the delivery of risk-reducing simulators (GSS+) and reduction in costs in late-stage development of SVs 11 and 12.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue Development of GPS IIIF SV 11 and SV12. Continue development and initiate launch vehicle assembly of GPS IIIF SV12. Continue the build, qualification, and delivery of GSS+ which will be utilized for Mission Readiness testing, Integrated Cyber Testing, System Integration Demo 31, and Space Vehicle risk reduction events and provide critical capabilities for on-orbit checkout testing (OOCT) and anomaly resolution for the GPS IIIF constellation. As part of overall GPS IIIF advanced capabilities development, continue developing the Enhanced Command & Control/Modular Open System Approach capability through Implementation Design Review 1 (IDR.1)/Preliminary Design Review, continue development toward a GPS IIIF optical crosslinks demonstration (as a follow-on to the GPS III SV10 crosslinks demonstration), continue the On-Orbit Reprogramming capability through IDR.1. GPS IIIF crosslinks IDR will focus on risks, interoperability to the larger architecture, and incorporating/validating commercial/driving modernization of capabilities. GPS IIIF will continue special studies targeted to mitigate on-ramp capability risks. Rapidly respond to implement system resiliency and situational awareness necessary to operate in the contested space domain. Activities may include, but are not limited to program office support, studies, technical analysis, experimentation, risk reduction, prototyping, and activities that may leverage commercial, U.S. Government partnership, and international opportunities to respond to existing and emerging adversarial threats with speed and agility.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

501001500171.2FY25ACTUAL89.6FY26ENACTED59.3FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual171.2
FY2026Enacted89.6
FY2027Request59.3

This activity is 100% of project 653170's FY2027 request and 48% of PE 1203269SF's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project 653170

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

GPS III Follow-On (GPS IIIF) Development — this activity$59.3M ▼ 34%
Resilient GPS$0.0M ▼ 100%
PNT Architecture$0.0M ▼ 100%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 1203269SF, project 653170 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/1203269SF/653170/a0.md · MCP mcp.hitchintel.combudget_get_activity