RDT&E Program Element · President's Budget PB2027

GPS III Follow-On (GPS IIIF)

PE 1203269SF·U.S. Space Force·Approp. 3620F — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$123.8M
Space Force · RDT&E
HitchAI read

U.S. Space Force funding falls 37% to a $123.8M request in FY2027, before stepping down 43% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. SAIC leads the industry work.

FY2027 Request
$123.8M
▼ 37% vs FY2026
FY2026 Enacted
$196.2M
▼ 16% vs FY2025
FY2025 Actual
$233.1M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Space Force is requesting $123.8M for GPS III Follow-On (GPS IIIF) under RDT&E program element 1203269SF, down 37% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001502000233.1FY25ACTUAL196.2FY26ENACTED123.8FY27REQUEST105.1FY2890.5FY2972.3FY3070.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual233.1
FY2026Enacted196.2
FY2027Request123.8
FY2028Outyear105.1
FY2029Outyear90.5
FY2030Outyear72.3
FY2031Outyear70.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 1203269SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -37% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$123.8M
House NDAA (HASC)HASC
$123.8M full · +$0
Senate NDAA (SASC)SASC
$123.8M full · +$0
House Approps (HAC-D)HAC_D
$123.8M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

SAIC
$31.1M · 25%
GPS IIIF Enterprise SE&I · CPAF
Lockheed Martin
$28.9M · 23%
GPS IIIF Space Vehicle · FPIF
Where FY2027 funding flowsShare$M
Industry primes49%60.1
Government labs & warfare centers10%12.8
Other / unspecified41%51.0
FY2027 request100%123.8
See SAIC's full federal contract ledger members
Program detail

Mission & acquisition strategy

System Delta 831 is developing the Global Positioning System III Follow-on (GPS IIIF) (Project 653170) for Guardians across Position, Navigation, and Timing. As a result, the Service will improve readiness and operational reach of existing force structure. The Global Positioning System (GPS) is a space-based navigation system that fills validated Joint Service requirements for worldwide, accurate, common grid three-dimensional positioning/navigation for military aircraft, ships, and ground personnel.

In December 2017, Principal Deputy Office of the Assistant Secretary of the Air Force Acquisition & Logistics began the GPS IIIF program. Beginning in FY 2019 and, consistent with the Fiscal Year 2016 National Defense Authorization Act, the program was categorized as an Acquisition Category 1B Major Defense Acquisition Program (MDAP) with the Service Acquisition Executive serving as the Milestone Decision Authority (MDA). During this time, the MDA approved the second phase of the two-phased GPS III Follow-On (GPS IIIF) acquisition strategy.

Project 653171, 653170 — GPS Enterprise Integration
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 1203269SF is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what SAIC has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1203269SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "GPS III Follow-On (GPS IIIF) (PE 1203269SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1203269SF
Machine access
Markdown twin /programs/1203269SF.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$64.5M
▲ 4.8% vs FY2026
FY2026 Enacted
$61.6M
▼ 0.5% vs FY2025
FY2025 Actual
$61.9M
Prior year

GPS Enterprise Integration — one RDT&E project inside PE 1203269SF. Congressional marks are recorded on the program element, not on a project.

Project 653171 — GPS Enterprise Integration — requests $64.5M in FY2027, 52% of the $123.8M requested for program element 1203269SF. Year over year it grows 4.8% against FY2026.

Funding trajectory

Project 653171 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550061.9FY25ACTUAL61.6FY26ENACTED64.5FY27REQUEST67.0FY2868.0FY2969.3FY3070.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual61.9
FY2026Enacted61.6
FY2027Request64.5
FY2028Outyear67.0
FY2029Outyear68.0
FY2030Outyear69.3
FY2031Outyear70.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$61.9M
FY2026 enacted$61.6M
FY2027 request$64.5M

Continue integrated, Government-led development and operational testing using operational assets, facilities and resources. Continue supporting prototype hardware, software, and critical component maturation, ultimately driving toward initial production readiness and deployment. Continue supporting vendor test activities to include field…

Read the FY2027 plan →
Project 653171 — every activity in full →
Who's building it

Named performers on project 653171

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

SAIC
$25.2M · 39%
Project detail

What project 653171 buys

The Global Positioning System (GPS) Program Office established and maintains the technical baseline and is responsible for the successful fielding of all the GPS Segments (space, control, and user). In order to successfully execute these responsibilities, GPS Enterprise Integrator (EI) creates an enterprise architecture, integrates segment products, verifies the enterprise requirements are adequately met, develops and implements various Systems Engineering documents, defines methods of verification, conducts integrated system test and test analysis, develops and manages the Enterprise technical baseline which reflect multiple stakeholder requirements; stakeholders include the Department of War (DoW), foreign governments, industry, and the general public (through four public interface specifications). Furthermore, GPS EI ensures Positioning, Navigation, and Timing (PNT) capabilities meet the warfighter's, civil agencies, commercial entities, international treaties, and over four billion global GPS users needs. Moreover, GPS EI is responsible for delivering a reliable PNT signal capability to military operators, the civil user community, and international partners. In addition, GPS EI validates the system performance in various mission threat scenarios during its development as well as provides in-depth technical expertise to enhance government control, oversight and program accountability. GPS EI is also responsible for all aspects of schedule and technical alignment across the GPS segments (space, control, and user equipment). In order to assist in achieving program milestones, GPS EI is responsible for technical baseline management, integration, synchronizing, testing, and verifying GPS III, GPS III Follow-on (IIIF), Operational Control System (OCS), Next Generation Operational Control System (OCX), Military GPS User Equipment (MGUE) Increment (Inc) 1 and Inc 2, and other PNT investment projects. Additionally, GPS EI is responsible for creating and managing plans that provide early exercise of the products under development, compatibility analysis, and inter-segment testing. The inter-segment tests are required to prove OCX interoperability with GPS III satellites and Modernized User Equipment. More importantly, it ensures backwards compatibility with legacy systems such as GPS Block II satellites, OCS, and legacy user equipment.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
FY2027 Request
$59.3M
▼ 56% vs FY2026
FY2026 Enacted
$134.6M
▼ 21% vs FY2025
FY2025 Actual
$171.2M
Prior year

GPS IIIF — one RDT&E project inside PE 1203269SF. Congressional marks are recorded on the program element, not on a project.

Project 653170 — GPS IIIF — requests $59.3M in FY2027, 48% of the $123.8M requested for program element 1203269SF. Year over year it falls 56% against FY2026.

Funding trajectory

Project 653170 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001500171.2FY25ACTUAL134.6FY26ENACTED59.3FY27REQUEST38.0FY2822.5FY293.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual171.2
FY2026Enacted134.6
FY2027Request59.3
FY2028Outyear38.0
FY2029Outyear22.5
FY2030Outyear3.0
FY2031Outyear0.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$171.2M
FY2026 enacted$89.6M
FY2027 request$59.3M

Continue Development of GPS IIIF SV 11 and SV12. Continue development and initiate launch vehicle assembly of GPS IIIF SV12. Finalize the build, qualification, and delivery of GSS+ which will be utilized for Mission Readiness testing, Integrated Cyber Testing, System Integration Demo 31, and Space Vehicle risk reduction events and…

Read the FY2027 plan →
Resilient GPS▼ 100%
FY2025 actual
FY2026 enacted$15.0M
FY2027 request$0.0M

Certify on-orbit, reprogrammable cryptography unit(s) to meet SERD 2.0 requirements, capitalize on new commercial capabilities, and mitigate major schedule risk. Validate program anti-jam opportunity, which could deliver key anti-jam capability to the warfighter using MGUE Inc 1. Design and prove out new, flexible architectures for GPS…

PNT Architecture▼ 100%
FY2025 actual$0.0M
FY2026 enacted$30.0M
FY2027 request$0.0M

Initiate contracts for studies and analyses that will inform the development of a next-generation, reprogrammable, adaptable, and cost-effective future PNT enterprise architecture. Assess the application of Modular Open Systems Approaches (MOSA) and the integration of commercial capabilities and technologies on a wide range of…

Project 653170 — every activity in full →
Who's building it

Named performers on project 653170

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$28.9M · 49%
SAIC
$5.9M · 10.0%
Project detail

What project 653170 buys

System Delta 831 is developing the Global Positioning System III Follow-on (GPS IIIF) (Project 653170) for Guardians across Position, Navigation, and Timing. As a result, the Service will improve readiness and operational reach of existing force structure. The Global Positioning System (GPS) is a space-based navigation system that fills validated Joint Service requirements for worldwide, accurate, common grid three-dimensional positioning/navigation for military aircraft, ships, and ground personnel. The consistent accuracy, unaffected by location or weather and available in real time, significantly improves effectiveness of reconnaissance, weapons delivery, mine countermeasures and rapid deployment for all services. GPS must comply with Title 10 United States Code (USC) Sec. 2281, which requires that the Secretary of Defense ensures the continued sustainment and operation of GPS for military and civilian purposes, and 51 USC Sec. 50112, which requires that GPS complies with certain standards and facilitates international cooperation. The system is composed of three segments: User Equipment (funded under Program Element (PE) 1203164F, 1203164SF), Space (funded under PE 1203165F, 1203265F, 1203265SF, 1203269F, and 1203269SF), and a Control Network (funded under PE 1206423F, 1206423SF and 1203165F). The satellites broadcast high accuracy data using precisely synchronized signals that are received and processed by user equipment installed in military platforms. The user equipment computes the platform position and velocity and provides steering vectors to target locations or navigation waypoints. The control segment provides daily updates to the navigation messages broadcast from the satellites to maintain system precision in three dimensions to 16 meters (spherical error probable) worldwide. Additionally, GPS supports the United States (US) Nuclear Detonation (NUDET) Detection System (USNDS) mission and provides strategic and tactical support to the following Department of War (DoW) missions: Joint Operations by providing capabilities for Positioning, Navigation, and Timing (PNT); Command, Control, Communications, and Intelligence (C3I); Special Operations; Military Operations in Urban Terrain (MOUT); Defense-Wide Mission Support (DWMS); Air Mobility; and Space Launch Orbital Support.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services