RDT&E Program Element · President's Budget PB2027

Space Science and Technology Research and Development

PE 1206310SF·U.S. Space Force·Approp. 3620F — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$313.7M
Space Force · RDT&E
HitchAI read

U.S. Space Force funding falls 37% to a $313.7M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators added 17% (to $366.7M).

FY2027 Request
$313.7M
▼ 37% vs FY2026
FY2026 Enacted
$495.5M
▲ 12% vs FY2025
FY2025 Actual
$440.7M
Prior year

For fiscal year 2027, the U.S. Space Force is requesting $313.7M for Space Science and Technology Research and Development under RDT&E program element 1206310SF, down 37% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1503004500440.7FY25ACTUAL495.5FY26ENACTED313.7FY27REQUEST269.7FY28363.6FY29321.5FY30329.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual440.7
FY2026Enacted495.5
FY2027Request313.7
FY2028Outyear269.7
FY2029Outyear363.6
FY2030Outyear321.5
FY2031Outyear329.9
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 1206310SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -37% overall, which can hide much larger swings below.

Project 634869

Space Science and Technology Research and Development

$313.7MFY2027 request ▼ 37%
FY2025 actual$440.7M
FY2026 enacted$495.5M
FY2027 request$313.7M

The Space Development Agency (SDA) is developing and demonstrating the Proliferated Warfighter Space Architecture (PWSA) Transport Layer (Project 634869) for Guardians across the Combat Support, Satellite Communications, Operations, and Warfighting mission areas. As a result, the Service will improve readiness and operational reach of existing force structure and continue to advance all near term effects. SDA is rapidly developing and demonstrating next generation space capabilities for the joint warfighter enabled by proliferation of satellites and an expedited acquisition model utilizing rapid spiral development. SDA is advancing a proliferated space architecture to address a wide range of Department of War (DoW) space needs aligned with the United States Space Force Space Warfighting Framework, including low-latency tactical communication, beyond line of sight targeting, and advanced missile tracking. In coordination with Combatant Commands and other DoW Space stakeholders, SDA will demonstrate and field persistent, resilient capabilities needed to be responsive to emerging multi-domain threats against the U.S. national interest. SDA is responsible for the overall programmatic development and execution of a Proliferated Warfighter Space Architecture (PWSA). In coordination with other DoW Space stakeholders, SDA will drive the development of space capabilities, which align with the United States Space Force Space Warfighting Framework and reduce overlap and inefficiency. SDA will expand the DoW's capacity in leveraging the space environment while fostering growth in the U.S. space industrial base through enhanced government-commercial relationships and international collaborations with key allies and partners. Within the PWSA framework, SDA is responsible for orchestrating and architecting the PWSA and ensuring capability delivery to the warfighter in a responsive manner, delivering tactical communications, resilient sensing, and battle management. As part of the PWSA, SDA is building and fielding the Transport Layer using a proliferated constellation of satellites to provide tactical data to the warfighter. This Transport Layer will provide space-based connectivity for Joint All-Domain Command and Control (JADC2). The establishment of a proliferated data Transport Layer is essential to enabling a new and responsive space architecture.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$379.2M
FY2026 enacted$453.0M
FY2027 request$313.7M

Tranche 0 - Conduct residual experimentation in support of PWSA risk reduction. - Conduct end-of-life fleet operations. Tranche 1 - Resolve anomalous behavior in system interoperability and compatibility, including optical communications, space-to-ground radio frequency (RF), Link 16, and Networking. - Continue mission engineering…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$313.7M
House NDAA (HASC)HASC
$313.7M full · +$0
Senate NDAA (SASC)SASC
$313.7M full · +$0
House Approps (HAC-D)HAC_D
$366.7M +$53.0M · +17%
▲ $53.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1206310SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation