R-2A Activity · President's Budget PB2027

Wide Field of View (WFOV) On-Orbit Testbed Mission Integration

FY2027 Request
$18.2M
▼ 1.2% vs FY2026
HitchAI read

This activity requests $18.2M in FY2027, 10% of project 657009, down 1.2% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$18.2M
▼ 1.2% vs FY2026
FY2026 Enacted
$18.5M
In law
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 657009 of PE 1206442SF. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

The Wide Field of View (WFOV) system is an operationally-contributing sensor to the Theater Event System (TES) and the Integrated Tactical Warning and Attack Assessment (ITW/AA) system that is currently positioned over the strategically-important INDOPACOM region. WFOV is also capability that acts as a capability pathfinder ahead of Next-Gen Geosynchronous Earth Orbit (GEO) (NGG), Next-Gen Polar (NGP), and Missile Warning Missile Tracking (MW/MT) Medium-Earth Orbit (MEO) Epoch programs and will continue to provide utility of the wide area, sensitive, persistent capability with full frame, real- time image data provided in support of operational exercises and tests with the Department of War (DoW), Missile Defense Agency (MDA), and other targets of opportunity as available. In FY 2027, the program will continue operationalizing Wide Field of View (WFOV) Overhead Persistent Infrared (OPIR) data and exploring risk reduction opportunities for future sensors. The WFOV program will continue to provide missile track data to support data fusion in systems that message out on both the Theater Event System (TES) and Integrated Tactical Warning and Attack Assessment (ITW/AA) system. In support of operations, the program will be included as part of the Future Operationally Resilient Ground Evolution (FORGE) baseline and will provide updated software to enable the operational data string. WFOV will also be improving our ground architecture for better availability and reliability. The program plans to optimize different missile warning products for the operational and intelligence communities and create and test new specific data products for end users as requested in support of Resilient Missile Warning Missile Tracking (MW/MT) and Battlespace Awareness/Technical Intelligence (BA/TI) missions. The program is cooperating with the National Geospatial-Intelligence Agency (NGA), National Air and Space Intelligence Center (NASIC) and others to make the mono-track data and full frame messages fully accessible and available for both near real time and post processed intelligence reporting and technical analysis. Wide Field of View (WFOV) is a pathfinder to demonstrate the added value that Overhead Persistent Infrared (OPIR) data could bring to several other critical mission areas and push the limits of OPIR mission capability. As an on-orbit demo system the Space Vehicle (SV) will be available to test and demonstrate alternative modes of data transport from Outside the Continental United States (OCONUS) back to the Continental United States (CONUS).

FY2026 to FY2027 change

FY 2027 decreased due to realignment of funds within the program to optimize mission investments.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

The Wide Field of View (WFOV) system proves the utility of the wide area, sensitive, persistent capability with full frame, real-time image data provided in support of operational exercises and tests with the Department of War (DoW), Missile Defense Agency (MDA),and other targets of opportunity as available. The WFOV program will continue to provide missile track data to support data fusion in systems that message out on both the Theater Event System (TES) and Integrated Tactical Warning and Attack Assessment (ITW/AA) system. The program plans to create and test new specific data products for end users as requested in support of Resilient Missile Warning Missile Tracking (MW/MT) and Battlespace Awareness/Technical Intelligence (BA/TI) missions. The program is cooperating with the National Geospatial-Intelligence Agency (NGA), National Air and Space Intelligence Center (NASIC) and others to make the mono-track data and full frame messages fully accessible and available for both near real time and post processed intelligence reporting and technical analysis. WFOV is preparing to pathfind and demonstrate the added value that Overhead Persistent Infrared (OPIR) data could bring to several other critical mission areas and push the limits of OPIR mission capability.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

018.5FY26ENACTED18.2FY27REQUEST
Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted18.5
FY2027Request18.2

This activity is 10% of project 657009's FY2027 request and 8.7% of PE 1206442SF's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

5 activities in project 657009

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 1206442SF, project 657009 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/1206442SF/657009/a3.md · MCP mcp.hitchintel.combudget_get_activity