RDT&E Program Element · President's Budget PB2027

Next Generation OPIR

PE 1206442SF·U.S. Space Force·Approp. 3620F — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$209.9M
Space Force · RDT&E
HitchAI read

U.S. Space Force requests $209.9M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Booz Allen leads the industry work.

FY2027 Request
$209.9M
▲ 11% vs FY2026
FY2026 Enacted
$189.6M
▼ 0.7% vs FY2025
FY2025 Actual
$191.0M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Space Force is requesting $209.9M for Next Generation OPIR under RDT&E program element 1206442SF, up 11% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001502000191.0FY25ACTUAL189.6FY26ENACTED209.9FY27REQUEST221.2FY28223.4FY29228.3FY30232.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual191.0
FY2026Enacted189.6
FY2027Request209.9
FY2028Outyear221.2
FY2029Outyear223.4
FY2030Outyear228.3
FY2031Outyear232.9
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 1206442SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 11% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$209.9M
House NDAA (HASC)HASC
$209.9M full · +$0
Senate NDAA (SASC)SASC
$209.9M full · +$0
House Approps (HAC-D)HAC_D
$209.9M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Industry primes0.6%1.2
Government labs & warfare centers7.0%14.6
Other / unspecified92%194.0
FY2027 request100%209.9
Program detail

Mission & acquisition strategy

The program office is developing and prototyping the Resilient Next Generation OPIR (Projects 657009 & 657123) for Guardians across Missile Warning and Missile Tracking (MW/MT) mission area. As a result, the Service will deter, neutralize, defeat and/or destroy counterspace threats and defend the homeland. The Overhead Persistent Infrared (OPIR) program succeeds the current Space Based Infrared System (SBIRS) and will provide improved missile warning, missile defense, battlespace awareness, and technical intelligence collection capabilities that are more survivable against emerging adversary threats.

The program office will use a variety of acquisition approaches to execute various concept studies, technology maturation efforts, testbed/prototype demonstrations, data processing & analytics, and capability exploitation initiatives and projects. The program office will collaborate with appropriate contracting agencies to support each individual effort. Data Processing & Analytics efforts in the Overhead Persistent Infrared (OPIR) Tools, Applications, and Processing (TAP) Lab and the Overhead Persistent Infrared Battlespace Awareness Center (OBAC) will leverage existing external contracts, as well as new internal competitive contracts.

Project 657009, 657123 — Space Mod Initiative
  • Product Development
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 1206442SF is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Booz Allen has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1206442SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Next Generation OPIR (PE 1206442SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1206442SF
Machine access
Markdown twin /programs/1206442SF.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$179.5M
▲ 12% vs FY2026
FY2026 Enacted
$160.1M
▲ 0.9% vs FY2025
FY2025 Actual
$158.7M
Prior year

Space Mod Initiative — one RDT&E project inside PE 1206442SF. Congressional marks are recorded on the program element, not on a project.

Project 657009 — Space Mod Initiative — requests $179.5M in FY2027, 86% of the $209.9M requested for program element 1206442SF. Year over year it grows 12% against FY2026.

Funding trajectory

Project 657009 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001502000158.7FY25ACTUAL160.1FY26ENACTED179.5FY27REQUEST189.7FY28191.5FY29195.8FY30199.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual158.7
FY2026Enacted160.1
FY2027Request179.5
FY2028Outyear189.7
FY2029Outyear191.5
FY2030Outyear195.8
FY2031Outyear199.7
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$30.4M
FY2026 enacted$46.8M
FY2027 request$38.5M

The flagship investment for SMI Demonstrations in FY 2026 matures into FY 2027 as the orbital vehicles manufactured by K2 Space complete integration and are launched into MEO. The current plan is to test Space Development Agency (SDA) v4.0 optical crosslinks in orbit from multiple orbital vehicles in MEO and in a higher orbit (in…

Read the FY2027 plan →
FY2025 actual$35.2M
FY2026 enacted$10.9M
FY2027 request$24.6M

Through Technology Maturation, Space Modernization Initiative (SMI) will continue to ensure the final components needed to meet Missile Warning/Missile Tracking (MW/MT) Enterprise-wide peak production demands for large format, resilient, high dynamic range infrared Focal Plane Arrays (FPAs) and protective filters and coatings for the…

Read the FY2027 plan →
FY2025 actual$93.2M
FY2026 enacted$83.9M
FY2027 request$78.1M

As the Data Processing & Analytics flagship investment, Space Modernization Initiative (SMI) will exploit emerging Artificial Intelligence and Machine Learning (AI/ML) solutions to deliver tools necessary to operate the Proliferated Warfighting Architecture and manage the warfighters' cognitive load that will be stressed by the volume of…

Read the FY2027 plan →
FY2025 actual
FY2026 enacted$18.5M
FY2027 request$18.2M

The Wide Field of View (WFOV) system is an operationally-contributing sensor to the Theater Event System (TES) and the Integrated Tactical Warning and Attack Assessment (ITW/AA) system that is currently positioned over the strategically-important INDOPACOM region. WFOV is also capability that acts as a capability pathfinder ahead of…

Read the FY2027 plan →
FY2025 actual
FY2026 enacted
FY2027 request$20.0M

Capability Exploitation is a new start. In FY 2027, Capability Exploitation will operationalize the first transition of an Space Modernization Initiative (SMI)-derived effort into this construct through the ThinKom phased array antenna initiative. Originally launched to rapidly demonstrate and inform requirements for the Resilient Ground…

Read the FY2027 plan →
Project 657009 — every activity in full →
Who's building it

Named performers on project 657009

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Booz Allen
$1.2M · 0.7%
Project detail

What project 657009 buys

Next-Generation Overhead Persistent Infrared (OPIR) Space Modernization Initiative (SMI) (Project 657009): To better enable response to emerging global missile threats, SMI advances critical capabilities and reduces risk through five major thrust areas: Demonstrations/Prototypes, Technology Maturation, Data Processing & Analytics, Wide Field of View (WFOV) On-Orbit Testbed Mission Integration, and Capability Exploitation, each with a flagship investment. Demonstrations rapidly prototype new game-changing technologies for the broader mission warning enterprise by delivering ground and on-orbit prototypes. Demonstrations also advance OPIR capabilities for missile warning and tracking ensuring a low risk, smooth transition of advanced technology to future operational systems. Technology Maturation focuses investments on high pay-off critical components to reduce production risks and development costs. Technology Maturation also focuses development on advanced Infrared (IR) sensing optics and electronics, resiliency hardware and software, and on-board processing algorithms and on-board computers. Data Processing & Analytics provides return-on-investment aimed at ingestion and fusion of current and future proliferated sensor program data to enhance missile warning, missile defense, battlespace awareness and technical intelligence mission capabilities. This includes the processing and exploitation of legacy Space Based Infrared Systems (SBIRS) wideband data and its fusion with Wide Field of View (WFOV) Geosynchronous Earth Orbit (GEO) wideband sensor. Subsequently, this work will expand to include the ingestion and fusion of WFOV Low Earth Orbit (LEO), Next-Gen GEO, Resilient Missile Warning/Missile Tracking (MW/MT) Medium-Earth Orbit (MEO) and other data as it becomes available as well as overcoming the proliferated sensor challenges expected with the large volumes of data and tracks that could overwhelm the enterprise and operators. Data Processing & Analytics will focus on automation and innovation to overcome these challenges to include Artificial Intelligence and Machine Learning (AI/ML) that reduce cognitive workload reduction of the operators.

R-3 lines of work
  • Product Development
  • Management Services
FY2027 Request
$30.4M
▲ 2.9% vs FY2026
FY2026 Enacted
$29.5M
▼ 8.5% vs FY2025
FY2025 Actual
$32.2M
Prior year

Integration — one RDT&E project inside PE 1206442SF. Congressional marks are recorded on the program element, not on a project.

Project 657123 — Integration — requests $30.4M in FY2027, 14% of the $209.9M requested for program element 1206442SF. Year over year it grows 2.9% against FY2026.

Funding trajectory

Project 657123 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25032.2FY25ACTUAL29.5FY26ENACTED30.4FY27REQUEST31.5FY2831.9FY2932.5FY3033.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual32.2
FY2026Enacted29.5
FY2027Request30.4
FY2028Outyear31.5
FY2029Outyear31.9
FY2030Outyear32.5
FY2031Outyear33.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$32.2M
FY2026 enacted$29.5M
FY2027 request$30.4M

Continue to plan and execute the critical lead system integration function across the System Delta (SYD) 84 Missile Warning and Tracking System of Systems, to include systems engineering, process development and execution, requirements analysis, vertical and horizontal integration at the system, ground, space, segment and element levels…

Read the FY2027 plan →
Project 657123 — every activity in full →
Project detail

What project 657123 buys

The Government works with the Enterprise System Engineering & Integration (SE&I) contractor as a team to define the Next-Gen OPIR enterprise architecture, control and validate interfaces, ensure compatibility of Next-Gen OPIR systems, and develop/manage plans for fielding the Next-Gen OPIR segments. Further, the Enterprise SE&I executes system-level integration requirements between segments such as Space to Ground. This differs from integration within each segment; integration within segments refers to subsystem-level integration between subsystems such as a spacecraft bus to the mission payload. The Government Integrator is responsible for defining the Next-Gen OPIR enterprise architecture, controls and validates interfaces, ensures compatibility of Next-Gen OPIR systems, and develops/manages plans for fielding the Next-Gen OPIR Enterprise. Further, the Integrator executes Model Based System Engineering (MBSE) through modeling, simulation, and technical analyses of Government-directed enterprise level trades among the Next-Gen OPIR segments. These trades lead to definition, management, maintenance, and evolution of the Next-Gen OPIR Enterprise technical requirements and interface documents to ensure the integrity of the enterprise technical baseline. This program element may include necessary civilian pay expenses required to manage, execute, and deliver Next-Gen OPIR weapon system capabilities. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206389SF.

R-3 lines of work
  • Product Development
  • Management Services