What project 657123 buys
The Government works with the Enterprise System Engineering & Integration (SE&I) contractor as a team to define the Next-Gen OPIR enterprise architecture, control and validate interfaces, ensure compatibility of Next-Gen OPIR systems, and develop/manage plans for fielding the Next-Gen OPIR segments. Further, the Enterprise SE&I executes system-level integration requirements between segments such as Space to Ground. This differs from integration within each segment; integration within segments refers to subsystem-level integration between subsystems such as a spacecraft bus to the mission payload. The Government Integrator is responsible for defining the Next-Gen OPIR enterprise architecture, controls and validates interfaces, ensures compatibility of Next-Gen OPIR systems, and develops/manages plans for fielding the Next-Gen OPIR Enterprise. Further, the Integrator executes Model Based System Engineering (MBSE) through modeling, simulation, and technical analyses of Government-directed enterprise level trades among the Next-Gen OPIR segments. These trades lead to definition, management, maintenance, and evolution of the Next-Gen OPIR Enterprise technical requirements and interface documents to ensure the integrity of the enterprise technical baseline. This program element may include necessary civilian pay expenses required to manage, execute, and deliver Next-Gen OPIR weapon system capabilities. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206389SF.
- Product Development
- Management Services
Project 657123 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 32.2 |
| FY2026 | Enacted | 29.5 |
| FY2027 | Request | 30.4 |
| FY2028 | Outyear | 31.5 |
| FY2029 | Outyear | 31.9 |
| FY2030 | Outyear | 32.5 |
| FY2031 | Outyear | 33.1 |
1 accomplishment / planned program
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
Continue to plan and execute the critical lead system integration function across the System Delta (SYD) 84 Missile Warning and Tracking System of Systems, to include systems engineering, process development and execution, requirements analysis, vertical and horizontal integration at the system, ground, space, segment and element levels…
Read the FY2027 plan →