R-2A Activity · President's Budget PB2027

Integrated Satellite Demonstrations

FY2027 Request
$21.4M
▲ 18% vs FY2026
HitchAI read

This activity requests $21.4M in FY2027, 45% of project 633834, up 18% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$21.4M
▲ 18% vs FY2026
FY2026 Enacted
$18.1M
▼ 40% vs FY2025
FY2025 Actual
$30.4M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 633834 of PE 1206616SF. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue: - Demonstrate technologies for future proliferated systems through small satellite experiments with a mission focus of designing, building, and testing aimed at increasing the resiliency of space assets, technologies, and missions to emerging threats. - Integrate commercial, allied, and government space networks command and control (C2) of a hybrid space architecture. - Maintain and develop capabilities to support satellite operations at any classification level for a diverse range of space vehicle designs and operation at a variety of orbital regimes. - Satellite operations for 11 planned on-orbit missions including a multi-satellite constellation furthering USSF capability in dynamic space operations. - Develop infrastructure to enable standardization of control interfaces for satellite operations, and to enable cutting-edge Research & Development for defense applications and support of mission partners. - Engage with university partners to design, build, test, and operate satellites to support risk reduction experiments for United States Space Force (USSF) missions and to build an experienced workforce for USSF and defense industrial base employment. - Mission concepting to mature concepts and incorporate systems engineering to ideate on next missions to include, early design, ground experiments, and long-lead equipment purchases for several new flight experiment concepts including demonstrations supporting next generation position, navigation, and timing technology, space-to-terrestrial sensing technology, dynamic space operations, and rendezvous and proximity and docking operations. Commence: - Assembly, Integration and Test (AI&T) for experiments to evaluate capability defending US assets against Electromagnetic Spectrum Operations (EMSO) from adversaries - Expand efforts focused on operating in Very Low Earth Orbit (VLEO) to include satellite operations and specialized component technologies. - Increased satellite operations and mission engineering support in preparation for future nuclear propulsion space flight experiments in novel orbits.

FY2026 to FY2027 change

FY2027 increased compared to FY2026 by $3.339 million due to Assembly, Integration and Test (AI&T) activities for currently planned small satellite missions and to expand efforts focused on Very Low Earth Orbit (VLEO) and operations infrastructure for nuclear propulsion space flight beyond Geosynchronous Equatorial Orbit (GEO).

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue: - Efforts to demonstrate technologies for future proliferated systems through small satellite experiments. - Design, build, and test of small satellite missions with a focus on capabilities in autonomy, cyber resiliency, and integration of commercial, allied, and government space networks command and control (C2) of a hybrid space architecture. - Engagement with university partners to design, build, test, and operate satellites in support of risk reduction experiments for United States Space Force (USSF) missions and to build an experienced workforce for USSF and defense industrial base employment. Commence: -Early design, ground experiments, and long-lead equipment purchases for several new flight experiment concepts including demonstrations supporting next generation position, navigation, and timing technology, space-to-terrestrial sensing technology, and dynamic space operations and rendezvous and proximity operations. Complete: -Assembly, Integration and Test of the Space Solar Demonstration.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25030.4FY25ACTUAL18.1FY26ENACTED21.4FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual30.4
FY2026Enacted18.1
FY2027Request21.4

This activity is 45% of project 633834's FY2027 request and 17% of PE 1206616SF's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

10 activities in project 633834

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Integrated Satellite Demonstrations — this activity$21.4M ▲ 18%
Cislunar Space Situational Awareness$13.5M ▲ 6%
Modular Open SatNav Architecture$3.4M NEW
Advanced Materials for Spacecraft Resilience$3.0M flat
Modeling and Simulation Tools for Space Applications$2.7M ▼ 21%
Agile Space Operations Technology$2.2M ▼ 1%
Manufacturing for Space Systems$1.2M ▼ 21%
Transformational Technology Development$0.0M
Rocket Cargo$0.0M
Navigation Technology Satellite 3 (NTS-3)$0.0M
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 1206616SF, project 633834 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/1206616SF/633834/a0.md · MCP mcp.hitchintel.combudget_get_activity