RDT&E Project · President's Budget PB2027

Protected Tactical SATCOM - Global (PTS_G)

Project 643722·PE 1206761SF — Protected Tactical Service (PTS)·U.S. Space Force·BA4
FY2027 Request
$150.4M
▼ 37% vs FY2026
HitchAI read

Project 643722 — Protected Tactical SATCOM - Global (PTS_G) requests $150.4M in FY2027, 33% of the $449.4M requested for program element 1206761SF, down 37% on FY2026. 1 R-2A activity decomposes the request.

MarketSpace & Missile Warning/Tracking

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$150.4M
▼ 37% vs FY2026
FY2026 Enacted
$236.8M
▲ 187% vs FY2025
FY2025 Actual
$82.5M
Prior year
Project detail

What project 643722 buys

In CY 2022 the Space Warfighting Analysis Center (SWAC) identified gaps in protected SATCOM capabilities relative to existing and planned capabilities against current and predicted user needs, with consideration of current and emerging challenges to both operating environments and system deployment. SWAC developed a Force Design (FD) to address these gaps, realigning capabilities and disaggregating mission sets. Protected Tactical SATCOM - Global (PTS-G) is a key and enabling capability of the USSF Force Design (FD) that bridges the gap between the more focused capabilities provided by Protected Tactical SATCOM - Resilient (PTS-R), and the broadly-available but also the lower assured access capabilities provided by existing / emerging MILSATCOM and commercial services. PTS-G also augments current and future warfighter capability with increased global capacity. PTS-G is a moderate degree of assured access communications across military Ka-band and X-band using a disaggregated and proliferated sets of lower-complexity satellites. Space Systems Command (SSC) will develop the PTS-G space and ground systems to provide worldwide assured-access communications for tactical warfighters. PTS-G will consist of space vehicles utilizing military Ka band and X band payloads (PTS-G-Ka and PTS-G-X), and ground infrastructure (system controller/hub with gateways), and will connect to existing Protected Tactical SATCOM Family of Systems ground infrastructure (mission management system and cryptographic key management system) developed under the PTES program, as well as integrating legacy SATCOM waveforms. PTS-G will consist of multiple satellites that can provide either X-band and/or mil Ka-band transponded capability while also supporting the utilization of the PTW Waveform. PTW modems for user terminals will be acquired by each Service and by international partners. Initially, PTS-G will provide capabilities in select regions. PTS-G will target a solution that can provide worldwide coverage. PTS-G will be interoperable with the PTES program to perform management and cryptographic key management for PTW users, but PTS-G will procure and install the associated PTES Joint Hubs and other ground infrastructure to operate the satellites, anchor the data, and perform O&S. In addition, the PTS-R system will be integrated with components of PTES and will be complementary to PTS-G.

R-3 lines of work
  • Product Development
  • Management Services
Funding trajectory

Project 643722 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150200082.5FY25ACTUAL236.8FY26ENACTED150.4FY27REQUEST112.6FY2833.2FY2913.3FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual82.5
FY2026Enacted236.8
FY2027Request150.4
FY2028Outyear112.6
FY2029Outyear33.2
FY2030Outyear13.3
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$82.5M
FY2026 enacted$236.8M
FY2027 request$150.4M

Continuing production of PTS-G space vehicles, completing procurement of HW items, and conducting interface checkout of bus and payload subsystems. The program will begin early integration activities. In addition to space vehicles, the program will continue with interface checkout of Ground Command and Control system, which includes…

Read the FY2027 plan →