For fiscal year 2027, the U.S. Space Force is requesting $449.4M for Protected Tactical Service (PTS) under RDT&E program element 1206761SF, up 4.8% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 390.6 |
| FY2026 | Enacted | 428.7 |
| FY2027 | Request | 449.4 |
| FY2028 | Outyear | 450.8 |
| FY2029 | Outyear | 326.4 |
| FY2030 | Outyear | 391.2 |
| FY2031 | Outyear | 389.4 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 1206761SF
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 5% overall, which can hide much larger swings below.
Protected Tactical SATCOM - Global (PTS_G)
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 22% | 98.0 |
| Government labs & warfare centers | 0.7% | 3.2 |
| Other / unspecified | 77% | 348.1 |
| FY2027 request | 100% | 449.4 |
Mission & acquisition strategy
The Protected Tactical Service (PTS) program is developing, demonstrating, prototyping, and operating beyond-line-of-sight, Anti-Jam (AJ), low-probability-of-intercept satellite communications and provides the space and dedicated ground architecture required to securely transport tactical satellite communications for warfighters across the Satellite Communications (SATCOM) mission area. As a result, the Service will improve readiness and operational reach of existing force structure and provide an enduring resilient Infrastructure, equipment, and personnel.
The PTS team utilizes the FY 2016 NDAA MTA guidance for Rapid Prototyping/Rapid Fielding and Section 815 OTA guidance in developing the acquisition strategy. This strategy places an emphasis on the rapid prototyping, production, and incremental iteration of PTS capability. This strategy takes the form of a series of successively honed and tailored spirals, focusing on payload development and hosting opportunities and incorporating lessons learned from Milstar, Enhanced Polar System (EPS), EPS-Recapitalization (EPS-R), AEHF, Protected Tactical Enterprise Service (PTES), and commercial SATCOM practices.
- Product Development
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Northrop Grumman has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/1206761SF.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksProtected Tactical SATCOM — one RDT&E project inside PE 1206761SF. Congressional marks are recorded on the program element, not on a project.
Project 643728 — Protected Tactical SATCOM — requests $299.1M in FY2027, 67% of the $449.4M requested for program element 1206761SF. Year over year it grows 56% against FY2026.
Project 643728 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 308.1 |
| FY2026 | Enacted | 191.9 |
| FY2027 | Request | 299.1 |
| FY2028 | Outyear | 338.2 |
| FY2029 | Outyear | 293.2 |
| FY2030 | Outyear | 378.0 |
| FY2031 | Outyear | 389.4 |
8 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Complete free flyer PTS prototype space vehicle to launch vehicle integration and provide launch support activities. Support satellite initial checkout for both PTS prototype vehicles and complete all post-launch On-Orbit Demonstration and Test (OODT) activities and support. Continue supporting existing PTS-P payloads with payload…
Read the FY2027 plan →Continue the development of the PTS-P Enhanced space vehicle. Conduct a CDR event for the space vehicle leveraging previous PTS-P technology maturation. Initiate the manufacturing, build, and test phase of the satellite development by building both payload and bus components and begin integration with long lead items. Conduct modeling…
Read the FY2027 plan →Conclude development of Enhanced PTS-P ECU. Complete key documentation for NSA certification and advance through critical stages of the process. Conduct quick-action troubleshooting and deficiency resolution for PTS-P ECU contractor during on-orbit demonstration and test (OODT) activities for PTS prototypes. Finalize ECU engineering…
Support the OODT of both PTS-P payloads that launch in FY26. Perform bulk of the development of PTES interface tools by the PTES prime contractor. As PTES interface tools mature, transition PTS-Prototypes from simulators and offline planning tool that enabled manual mission management during OODT activities. Initiate integration efforts…
Read the FY2027 plan →Relocate two PGET-Ps from test site to OCONUS sites. Complete PGET-P operation checkup and integration with PTS-P payload. Procure two additional PGETs including antennas and a digital core for the Enhanced PTS-P space vehicle. Complete PGET-P integration and test with available modems (one A3M and possibly one WAMS if available for each…
Continue developing, enhancing, and integrating the PTW Testbed across hub and terminal segments to support multi-Service testing, fielding, and early operations of Protected Tactical Waveform (PTW) over DoW and commercial constellations in GEO, MEO, and HEO orbits and to ensure compatibility and interoperability among all segments…
Continue to manage and test key system interfaces for PTS Ground, Space, and Gateway Segments as well as tactical SATCOM family of systems ground and terminal segments to reduce integration risks. Complete launch integration activities to include SV to LV coordination for the two PTS-P payloads. Continue to provide test support for two…
Named performers on project 643728
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 643728 buys
The Protected Tactical Satellite Communications (PTS) program is employing a multi-phase strategy to progressively and incrementally deploy prototypes with residual capabilities demonstrated in an operational environment. For the initial PTS Prototype (PTS-P) phase, USSF is utilizing FY 2016 National Defense Authorization Act (NDAA), Middle Tier of Acquisition (MTA) for Rapid Prototyping (RP) authority and Section 815, Other Transaction Authority (OTA), to achieve an affordable, rapid, operational capability for the tactical warfighter. These prototyping payloads (PTS-P) demonstrate innovative Anti-Jam (AJ) technologies with modular and scalable payloads to meet validated military needs for protected tactical communications. This includes technical baseline development, systems engineering trade analyses, internal/external system integration and development, candidate system architecture evaluations, risk reduction demonstrations, prototyping concepts development, system testing, and enabling technologies maturation. The PTS-P projects have successfully completed delivery of prototype payloads meeting program objectives and transitioned to the PTS-R/P Major Capability Acquisition pathway in 2024. Launch, on-orbit checkout, and test/training utilization of the PTS-P payloads is ongoing. The Enhanced PTS-P is an MTA-RP additional effort continuing the strategy to rapidly deliver incremental capability, accelerating Initial Operational Capability (IOC)-like delivery by two years with purpose-built "hub in space” satellites utilizing full signal processing and switching capability allowing direct connectivity between users. The PTS-Resilient (PTS-R) project will follow Enhanced PTS- P in FY28 and is intended to be a Program of Record to provide the full PTS-R CDD capability for the PTS Family of Systems (FoS), adding additional AJ and resiliency capability and further connectivity to the Protected Tactical Enterprise Service (PTES) ground segment. In a June 2025 ADM the milestone decision authority directed the program to cancel PTS-R source selection and rapidly acquire a PTS-P with enhancements as an incremental step towards the full operational capability of PTS-R. PTS-R EMD start is deferred until FY28. Pivoting effort to develop and deliver PTS capability to the Enhanced PTS-P thrust beginning in FY26.
- Product Development
- Management Services
Protected Tactical SATCOM - Global (PTS_G) — one RDT&E project inside PE 1206761SF. Congressional marks are recorded on the program element, not on a project.
Project 643722 — Protected Tactical SATCOM - Global (PTS_G) — requests $150.4M in FY2027, 33% of the $449.4M requested for program element 1206761SF. Year over year it falls 37% against FY2026.
Project 643722 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 82.5 |
| FY2026 | Enacted | 236.8 |
| FY2027 | Request | 150.4 |
| FY2028 | Outyear | 112.6 |
| FY2029 | Outyear | 33.2 |
| FY2030 | Outyear | 13.3 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continuing production of PTS-G space vehicles, completing procurement of HW items, and conducting interface checkout of bus and payload subsystems. The program will begin early integration activities. In addition to space vehicles, the program will continue with interface checkout of Ground Command and Control system, which includes…
Read the FY2027 plan →What project 643722 buys
In CY 2022 the Space Warfighting Analysis Center (SWAC) identified gaps in protected SATCOM capabilities relative to existing and planned capabilities against current and predicted user needs, with consideration of current and emerging challenges to both operating environments and system deployment. SWAC developed a Force Design (FD) to address these gaps, realigning capabilities and disaggregating mission sets. Protected Tactical SATCOM - Global (PTS-G) is a key and enabling capability of the USSF Force Design (FD) that bridges the gap between the more focused capabilities provided by Protected Tactical SATCOM - Resilient (PTS-R), and the broadly-available but also the lower assured access capabilities provided by existing / emerging MILSATCOM and commercial services. PTS-G also augments current and future warfighter capability with increased global capacity. PTS-G is a moderate degree of assured access communications across military Ka-band and X-band using a disaggregated and proliferated sets of lower-complexity satellites. Space Systems Command (SSC) will develop the PTS-G space and ground systems to provide worldwide assured-access communications for tactical warfighters. PTS-G will consist of space vehicles utilizing military Ka band and X band payloads (PTS-G-Ka and PTS-G-X), and ground infrastructure (system controller/hub with gateways), and will connect to existing Protected Tactical SATCOM Family of Systems ground infrastructure (mission management system and cryptographic key management system) developed under the PTES program, as well as integrating legacy SATCOM waveforms. PTS-G will consist of multiple satellites that can provide either X-band and/or mil Ka-band transponded capability while also supporting the utilization of the PTW Waveform. PTW modems for user terminals will be acquired by each Service and by international partners. Initially, PTS-G will provide capabilities in select regions. PTS-G will target a solution that can provide worldwide coverage. PTS-G will be interoperable with the PTES program to perform management and cryptographic key management for PTW users, but PTS-G will procure and install the associated PTES Joint Hubs and other ground infrastructure to operate the satellites, anchor the data, and perform O&S. In addition, the PTS-R system will be integrated with components of PTES and will be complementary to PTS-G.
- Product Development
- Management Services