RDT&E Program Element · President's Budget PB2027

Ship Self Def (Engage: Hard Kill)

PE 0604756N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$296.3M
◆ Scaling +104%
HitchAI read

U.S. Navy funding ramps 104% to a $296.3M request in FY2027 — the program's peak, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. RTX / Raytheon leads the industry work.

FY2027 Request
$296.3M
▲ 104% vs FY2026
FY2026 Enacted
$145.0M
▲ 151% vs FY2025
FY2025 Actual
$57.8M
Prior year

Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $296.3M for Ship Self Def (Engage: Hard Kill) under RDT&E program element 0604756N, up 104% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200250300057.8FY25ACTUAL145.0FY26ENACTED296.3FY27REQUEST274.0FY28264.7FY29270.6FY30272.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual57.8
FY2026Enacted145.0
FY2027Request296.3
FY2028Outyear274.0
FY2029Outyear264.7
FY2030Outyear270.6
FY2031Outyear272.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

5 projects roll up into PE 0604756N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 104% overall, which can hide much larger swings below.

The whole program

CIWS is funded on 2 lines across 2 appropriations

This page shows $3.7M of CIWS, 32% of the program's $11.6M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Close-In Wpns Sys (CIWS) ModsProcurementNavy7.9
CIWS totalNavy11.6

Lines whose title names the program. 13 further lines only mention CIWS in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$296.3M
House NDAA (HASC)HASC
$296.3M full · +$0
Senate NDAA (SASC)SASC
$296.3M full · +$0
House Approps (HAC-D)HAC_D
$296.3M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

RTX / Raytheon
$15.5M · 5.2%
SSDS BL 12 - RAM Integration · CPFF
Where FY2027 funding flowsShare$M
Industry primes11%32.2
Government labs & warfare centers22%64.4
Other / unspecified67%199.7
FY2027 request100%296.3
See RTX / Raytheon's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Evolved SEASPARROW Missile (ESSM) Blk 1 and Blk 2 is a NATO cooperative program, including the U.S., to defend against fast, low-altitude Anti-Ship Cruise Missiles (ASCMs). It enhances shipboard firepower by enabling four ESSMs to be launched from a single MK 41 Vertical Launch System (VLS) cell on DDG and CG. This project supports eight primary efforts: 1. ESSM Systems Integration and Test: ESSM Blk 2 is undergoing Initial Operational Test & Evaluation (IOT&E) Phase 2 and integration on platforms like CVN 79 and LHA 8. It supports AEGIS and SSDS baseline testing and flight trials, using missile simulators and flight test rounds. 2.

The C-UAS Afloat was an Urgent Capability Acquisition (UCA) with a disposition decision that occurred and transitioned to software acquisition pathway in FY 2026. The program will apply the lessons learned from the UCA in support of monitoring, developing, integration, and testing new C-UAS systems in order to maintain adaptability in pacing the evolving threat. Supplemental funding supports the National Defense Strategy, Chief of Naval Operation priorities and ensures ship self-defense capabilities continuously and rapidly evolves to stay ahead of the changing threats. Funding enables seamless integration of real-world lessons to ensure application on each iteration to ensure every deploying ship has the latest capability.

Project 2077, 0173, 0167, 9081, 2070 — Afloat C-UAS
  • Product Development
  • Support
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604756N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what RTX / Raytheon has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604756N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Ship Self Def (Engage: Hard Kill) (PE 0604756N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604756N
Machine access
Markdown twin /programs/0604756N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$228.4M
▲ 480% vs FY2026
FY2026 Enacted
$39.4M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Afloat C-UAS — one RDT&E project inside PE 0604756N. Congressional marks are recorded on the program element, not on a project.

Project 2077 — Afloat C-UAS — requests $228.4M in FY2027, 77% of the $296.3M requested for program element 0604756N. Year over year it grows 480% against FY2026.

Funding trajectory

Project 2077 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015020000.0FY25ACTUAL39.4FY26ENACTED228.4FY27REQUEST225.6FY28225.5FY29234.5FY30239.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted39.4
FY2027Request228.4
FY2028Outyear225.6
FY2029Outyear225.5
FY2030Outyear234.5
FY2031Outyear239.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$0.0M
FY2026 enacted$39.4M
FY2027 request$228.4M

Acquire C-UAS systems to support fielding on two carrier strike groups consisting of four to five deploying ships each and one expeditionary strike group consisting of three deploying ships for fielding in FY 2027 and 2028. Fielding the C-UAS prototype systems that were acquired in FY 2026. C-UAS engineering support, development and…

Read the FY2027 plan →
Project 2077 — every activity in full →
Who's building it

Named performers on project 2077

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Program Office
$3.4M · 1.5%
Project detail

What project 2077 buys

Afloat Counter Unmanned Aerial Systems (C-UAS) was established to meet an urgent operational need and funds the acquisition, testing, integration, and fielding of prototype C-UAS's to provide a lower cost defense in-depth solution to negate the UAS threats. The FY 2026 budget for Afloat C-UAS (2077) included $39.407 million of discretionary and $200.000 million of mandatory funding for a total of $239.407 million. The $200.000 million mandatory funds enabled the acquisition of the prototype systems identified through the testing that occurred in FY 2024 and FY 2025. In FY 2026, the program continued developing and testing C-UAS systems to pace the evolving threat. Further information for this reconciliation request is provided in Section 20010 (Readiness) of the Reconciliation Exhibit. The FY 2027 request for C-UAS will fund fielding the systems acquired in FY 2026 and acquire systems to support two carrier strike groups consisting of four to five deploying ships and one expeditionary strike group consisting of three deploying ships in for fielding in FY 2027 and FY 2028.

R-3 lines of work
  • Product Development
  • Support
  • Management Services
FY2027 Request
$49.8M
▼ 39% vs FY2026
FY2026 Enacted
$81.4M
▲ 163% vs FY2025
FY2025 Actual
$30.9M
Prior year

NATO Sea Sparrow — one RDT&E project inside PE 0604756N. Congressional marks are recorded on the program element, not on a project.

Project 0173 — NATO Sea Sparrow — requests $49.8M in FY2027, 17% of the $296.3M requested for program element 0604756N. Year over year it falls 39% against FY2026.

Funding trajectory

Project 0173 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075030.9FY25ACTUAL81.4FY26ENACTED49.8FY27REQUEST44.1FY2834.9FY2931.8FY3029.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual30.9
FY2026Enacted81.4
FY2027Request49.8
FY2028Outyear44.1
FY2029Outyear34.9
FY2030Outyear31.8
FY2031Outyear29.2
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$11.8M
FY2026 enacted$26.1M
FY2027 request$16.1M

Enterprise testing continues in FY 2027 using both ESSM Blk 1 and 2. WIT is planned on FORD and AMERICA class platforms, as well as backfit NIMITZ and WASP classes. Platform DT/OT continues, as well as an ESSM Blk 2 OT event on SDTS. ESSM Blk 2 IOT&E finishes on Arleigh Burke Class DDGs. Modeling and Simulation runs for the record are…

Read the FY2027 plan →
ESSM Technology Roadmap Analysis & Prototyping Support▼ 33%
FY2025 actual$1.1M
FY2026 enacted$0.8M
FY2027 request$0.6M

Begin assessments associated with new variant options. Assessments will include: weapon system requirements, proposed upgrades, digital tools (MBSE & M&S), etc. Studies will cross all major system components and preparation for new development of hardware and software for new variant to be deter.

Other Development▼ 62%
FY2025 actual$0.9M
FY2026 enacted$1.2M
FY2027 request$0.5M

This line will evolve into future M&S/MBSE tools in support of the next generation missile.

ESSM Blk 2 Software Upgrades▼ 100%
FY2025 actual$6.1M
FY2026 enacted$7.1M
FY2027 request$0.0M

This line has completed its RDTE phase and will be incorporated in O&M,N budget.

NATO SEASPARROW Tracker-Illuminator System (TIS) Development▼ 1%
FY2025 actual$1.1M
FY2026 enacted$1.2M
FY2027 request$1.2M

Develop, qualify, test, and integrate modernized technology (equipment/components) as part of MK 9 TIS upgrades. (Transmitter Group, Signal Data processing algorithms, and Antenna/illuminator). Submit a MK 9 TIS upgrade update to the Individual Streamlined Acquisition Plan (ISTRAP) for the NATO SEASPARROW Surface Missile System (NSSMS)…

FY2025 actual$9.9M
FY2026 enacted$44.9M
FY2027 request$31.5M

Execution of follow-on test and integration contract will include the following activities: technical data package (TDP) delivery, topside design completion, and continuation of ground testing. In addition, the program will continue the following efforts: systems engineering, safety, qualification, test & evaluation, and transition from…

Read the FY2027 plan →
Project 0173 — every activity in full →
Who's building it

Named performers on project 0173

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

PEO IWS 80
$3.6M · 7.2%
APL
$3.3M · 6.7%
Pt. Mugu
$2.9M · 5.8%
RTX / Raytheon
$0.9M · 1.8%
Project detail

What project 0173 buys

The Evolved SEASPARROW Missile (ESSM) Blk 1 and Blk 2 is a NATO cooperative program, including the U.S., to defend against fast, low-altitude Anti-Ship Cruise Missiles (ASCMs). It enhances shipboard firepower by enabling four ESSMs to be launched from a single MK 41 Vertical Launch System (VLS) cell on DDG and CG. This project supports eight primary efforts: 1. ESSM Systems Integration and Test: ESSM Blk 2 is undergoing Initial Operational Test & Evaluation (IOT&E) Phase 2 and integration on platforms like CVN 79 and LHA 8. It supports AEGIS and SSDS baseline testing and flight trials, using missile simulators and flight test rounds. 2. NATO SEASPARROW Technical Direction Agent (TDA): Provides systems engineering for the MK 57 NATO SEASPARROW System, including the MK 9 Tracker and MK 29 Launcher. These analyses and studies have been completed; future submissions will not include these efforts as they have transitioned to OPN. 3. ESSM Technology Roadmap Analysis & Prototyping support: Ongoing studies seek performance and producibility improvements for ESSM Blk 2 and future variants, exploring new tech and manufacturing methods to support evolving threats. Efforts will align closely to the developing requirements of the Navy Modular Missile. 4. Other Development (Blk 2 Obsolescence and Redesign, Combat System Test Bed (CSTB) and Models: Integrates ESSM Tactical Simulations into the CSTB/ETB to assess self-defense capabilities. Includes redesign studies to address aging components and support future missile models. This line will evolve into future M&S/MBSE tools in support of the next generation missile. 5. Evolved SEASPARROW Missile (ESSM) Blk 2 Software Upgrades: Updates driven by IOT&E findings, flight tests, and system changes will enhance ESSM Blk 2 capability. This line has completed its RDTE phase and will be incorporated in OMN budget. 6. C-Band Telemetry Upgrade: To support testing with multiple simultaneous missile flights, telemetry has shifted from S-band to C-band. The analyses and studies have been completed. Future submissions will not include these efforts. C-band telemeters in production and have replaced S-band type on production line. 7. NATO SEASPARROW Tracker-Illuminator System (TIS) Development: Efforts for previous OT-234 studies and analyses have been completed.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$14.4M
▼ 5.3% vs FY2026
FY2026 Enacted
$15.2M
▼ 18% vs FY2025
FY2025 Actual
$18.4M
Prior year

5in Rolling Airframe Missile — one RDT&E project inside PE 0604756N. Congressional marks are recorded on the program element, not on a project.

Project 0167 — 5in Rolling Airframe Missile — requests $14.4M in FY2027, 4.9% of the $296.3M requested for program element 0604756N. Year over year it falls 5.3% against FY2026.

Funding trajectory

Project 0167 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

018.4FY25ACTUAL15.2FY26ENACTED14.4FY27REQUEST4.3FY284.4FY294.3FY304.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual18.4
FY2026Enacted15.2
FY2027Request14.4
FY2028Outyear4.3
FY2029Outyear4.4
FY2030Outyear4.3
FY2031Outyear4.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$18.4M
FY2026 enacted$15.2M
FY2027 request$14.4M

Continue RAM GMWS integration efforts to support (1) RAM BLK 1A, 2, 2A and 2B into AEGIS BL9.C3.x to support RAM deployment on DDGs, (2) SSDS BL 12 Integration, Development Test (DT) and Operational Test (OT) events on Ship Self Defense Test Ship (SDTS) and Combat System Ship Qualification Test (CSSQT) and (3) SKIP model development…

Read the FY2027 plan →
Project 0167 — every activity in full →
Who's building it

Named performers on project 0167

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$11.0M · 76%
China Lake
$2.2M · 16%
Applied Phys Lab (APL)
$0.3M · 1.9%
Cydecor
$0.1M · 0.8%
Project detail

What project 0167 buys

The Rolling Airframe Missile (RAM) program is an international cooperative program with the government of the Federal Republic of Germany. The purpose of this program is to develop, test, and field a surface-to-air self-defense system consisting of both a missile and launcher. The latest fielded variant, the RAM Block 2B, defends against highly maneuverable Anti-Ship Missile (ASM) threats and emerging complex raid attacks utilizing an advanced seeker and missile-to-missile link while retaining all the proven capabilities of previous RAM variants (Block 0/1/1A/2/2A); accurate terminal guidance, proven lethality, and post-launch fire and forget capability. FY 2027 through FY 2031 efforts are as follows: Complete integration of the latest RAM Guided Missile Weapon System (GMWS) into the Ship Self-Defense System (SSDS) Baseline (BL) 12 and Aegis Combat System. This will enable the fleet to deploy the full capability of the RAM Block 2B missile which entered production in FY 2023. Continue the RAM "Performance Lab" which identifies improvements for incorporation through real-world events, trade studies, modelling and simulation, experiments, and test firings. Continue the RAM Software Factory to provide end users with rapid missile software updates to address emerging threats. Develop the Ship to Missile Uplink/Downlink (Stowed Kill Improvement Project (SKIP)). SKIP will utilize missile uplinks to provide the missile with continuous data from the combat system to improve mid-course and increase the probability of kill against complex raids. SKIP downlink will provide data back to the combat system to improve kill assessment fidelity. These system performance and efficiency improvements will be leveraged to decrease the required missiles per threat therefore increasing stowed kills per launcher.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$3.7M
▼ 49% vs FY2026
FY2026 Enacted
$7.2M
▲ 13% vs FY2025
FY2025 Actual
$6.4M
Prior year

Phalanx CIWS SEARAM — one RDT&E project inside PE 0604756N. Congressional marks are recorded on the program element, not on a project.

Project 9081 — Phalanx CIWS SEARAM — requests $3.7M in FY2027, 1.2% of the $296.3M requested for program element 0604756N. Year over year it falls 49% against FY2026.

Funding trajectory

Project 9081 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.4FY25ACTUAL7.2FY26ENACTED3.7FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.4
FY2026Enacted7.2
FY2027Request3.7
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

MK 15 MOD 40 CIWS (CRDC) configuration▼ 49%
FY2025 actual$6.4M
FY2026 enacted$7.2M
FY2027 request$3.7M

FY2027 planned work Complete Formal Qualification Testing, Safety, Certification, Fielding and Tactics development.

FY2026 to FY2027 change Decrease of $3.366 million from FY 2026 to FY 2027 is due to completion of operational system software.

FY2026 plans — current year FY 2026 continuing efforts will focus on finalizing system requirements and design, developing the operational software and conducting a simulated live fire event. Additional FY 2026 efforts include finalizing the operational system software, conducting combat system integration, and completion of formal qualification testing.

Who's building it

Named performers on project 9081

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$3.6M · 99%
Project detail

What project 9081 buys

The MK 15 MOD 40 Close in Weapon System (CIWS) RAM Defense Capability (CRDC) configuration is fielded aboard Nimitz Class Carriers (CVN). It is a fast reaction, rapid fire, computer-controlled radar system that employs the Rolling Airframe Missile (RAM) as an effector for Anti-Ship Missile (ASM) defense. The MK 15 MOD 40 CIWS (CRDC) configuration was fielded in FY 2020, limited to the RAM BLK 2 missile variant. The purpose of this project is to develop and integrate the latest RAM missile variant (BLK 2B) into the MK 15 MOD 40 baseline. The RAM Block 2B missile defends against highly maneuverable Anti-Ship Cruise Missile (ASCM) threats and emerging complex raid attacks utilizing an advanced infrared (IR) seeker and Missile-to-Missile Link (MML) while maintaining all the proven capabilities of previous RAM variants (BLK 2): accurate terminal guidance, proven lethality, and post-launch fire and forget capability. Without this effort the Nimitz class carriers will be unable to utilize the latest and most capable RAM Block 2B missile which entered production in FY 2023.

R-3 lines of work
  • Product Development
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$1.8M
▼ 9.8% vs FY2025
FY2025 Actual
$2.0M
Prior year

OTH Missile — one RDT&E project inside PE 0604756N. Congressional marks are recorded on the program element, not on a project.

Project 2070 — OTH Missile — requests $0.0M in FY2027, 0.0% of the $296.3M requested for program element 0604756N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 2070 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

02.0FY25ACTUAL1.8FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual2.0
FY2026Enacted1.8
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

OTH-MLS Test and Evaluation and Systems Engineering▼ 100%
FY2025 actual$2.0M
FY2026 enacted$1.8M
FY2027 request$0.0M

FY2026 to FY2027 change Decrease of $1.831 million due to no funding in FY 2027.

FY2026 plans — current year - Continue to provide OTH-MLS missile and fire control subject matter expertise to support the program office with program execution. - Support Fleet and User evaluation - Continue Live Fire Test and Evaluation (LFT&E) program. - Continue OT in accordance with the OTH-MLS Test and Evaluation Master Plan (TEMP.)

Project detail

What project 2070 buys

Over-The-Horizon (OTH) Missile funds competitive acquisition, testing, integrating and fielding of a modern, technologically mature Over-the-Horizon Missile Launch System (OTH-MLS) surface to surface missile capability will be installed onto commissioned and in-production Littoral Combat Ship Variants/Frigate(LCS/FFG)beginning FY 2019.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services