Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $156.2M for Ship Self Def (Detect & Cntrl) under RDT&E program element 0604755N, down 6.9% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 166.7 |
| FY2026 | Enacted | 167.7 |
| FY2027 | Request | 156.2 |
| FY2028 | Outyear | 156.7 |
| FY2029 | Outyear | 129.3 |
| FY2030 | Outyear | 123.0 |
| FY2031 | Outyear | 123.8 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
3 projects roll up into PE 0604755N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -7% overall, which can hide much larger swings below.
SSDS Training Improvement Program
Joint Non-Lethal Weapons
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 50% | 78.8 |
| Government labs & warfare centers | 42% | 66.3 |
| Other / unspecified | 7.1% | 11.1 |
| FY2027 request | 100% | 156.2 |
Mission & acquisition strategy
The QRCC project (PU 2178) implements an evolutionary acquisition of improved ship self-defense capabilities against Anti-Ship Cruise Missiles (ASCMs), and improved multi-warfare capabilities, for Aircraft Carriers and Amphibious Class ships. SSDS MK 2 integrates a diverse set of fire control loop sensors and weapons and C4I systems for each ship class (CVN 68/78, LHA 6, LHD 1, LPD 17, and LSD 41/49). SSDS MK 2 provides combat direction, and joint interoperability via the Cooperative Engagement Capability (CEC) and Tactical Digital Information Link (TADIL)-J/Link 16.
D. Acquisition Strategy A sole source follow-on Cost Plus Incentive Fee (CPIF) Level of Effort (LOE) contract, N00024-14-C-5128, was awarded 18 December 2013 with a Period of Performance (PoP) from FY 2014 - FY 2017 for the development, test, certification of SSDS MK2 (ACB 12/TI-12) for CVN78, CVN72, LHD2, and the software migration of ACB 12 to TI-12H/TI-16 for CVN 68, LHD 1, LPD 17 ship classes. This contract was extended to June 2020 and an additional extension to 2nd Quarter FY 2021 is planned to provide continued support of the SSDS MK 2 to complete the contract scope requirements for CVN and Amphibious ship Modernization ACB 12 on TI-12 and TI-12H (SSDS Software Build 10).
- Product Development
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what CSEA Contract has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604755N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksQRCC — one RDT&E project inside PE 0604755N. Congressional marks are recorded on the program element, not on a project.
Project 2178 — QRCC — requests $144.8M in FY2027, 93% of the $156.2M requested for program element 0604755N. Year over year it falls 5.6% against FY2026.
Project 2178 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 151.1 |
| FY2026 | Enacted | 153.4 |
| FY2027 | Request | 144.8 |
| FY2028 | Outyear | 144.9 |
| FY2029 | Outyear | 117.6 |
| FY2030 | Outyear | 111.3 |
| FY2031 | Outyear | 111.8 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
For Build 12+ - Continue efforts for systems engineering, design, and qualification of common computing infrastructure components/designs supporting SSDS platforms. - Continue efforts for systems engineering capability insertions, to include requirements development/updates, use cases, trade studies and conduct Systems Engineering…
Read the FY2027 plan →- Continue efforts for planning support for future year test schedule/events, and adhoc test events for software fixes. - Continue efforts for Combat System Integration Test (CSIT), SEA Based DT (SBDT) and Self Defense Test Ship (SDTS) test campaign outlined in Test and Evaluation Master Plan (TEMP 1910) in support of SSDS Baseline 12…
Read the FY2027 plan →Named performers on project 2178
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2178 buys
The QRCC project (PU 2178) implements an evolutionary acquisition of improved ship self-defense capabilities against Anti-Ship Cruise Missiles (ASCMs), and improved multi-warfare capabilities, for Aircraft Carriers and Amphibious Class ships. SSDS MK 2 integrates a diverse set of fire control loop sensors and weapons and C4I systems for each ship class (CVN 68/78, LHA 6, LHD 1, LPD 17, and LSD 41/49). SSDS MK 2 provides combat direction, and joint interoperability via the Cooperative Engagement Capability (CEC) and Tactical Digital Information Link (TADIL)-J/Link 16. System design emphasizes commonality and a single source software library that are major mechanisms for cost control and avoidances. SSDS uses a physically distributed, open system architecture computer network consisting of common hardware such as the CPS/CDS and common Computing Infrastructure. SSDS MK 2 integrates new combat system war-fighting capabilities and improvements via incremental capability packages and computing infrastructure (previously Technology Insertion) improvement deliveries. PU 2178 efforts are divided into two major functional areas: SSDS Product Development/Combat Systems Integration, and Test and Evaluation/Certification. SSDS Product Development/Combat System Integration encompasses systems engineering efforts, technology and capability insertion/integration, and cyber-security, including the development and integration of new capability and updated hardware configurations. FY27 development and integration will continue to mature SSDS Build 12 with the required TI16 computing and display configuration. SSDS Product Development will provide warfighter upgrades including continued integration of new Combat System/C4I elements (SPY-6(V)2, SPY-6(V)3, SLQ-32(V)6 SEWIP BLK 2, SLQ-32(V)7 SEWIP BK 3, CEC software updates RAM Block 2A/2B, ESSM Block 2, CIWS, and CANES). SSDS Combat System Integration efforts in FY27 will support transition to the Integrated Combat System (ICS) with integration of SSDS Build 12 software capabilities on the MK 6 MOD X hardware and ICS infrastructure. SSDS Build 10 is fielded on CVN 78, CVN 70/72, LHD 2, LSD 46/47, LHD 4, and LPD 22/23. To improve efficiency and reduce SW build proliferation, the SSDS design has started migrating an initial release of Build 12 with Advanced Training Domain capability to the TI-16 hardware configuration.
- Product Development
- Test and Evaluation
SSDS Training Improvement Program — one RDT&E project inside PE 0604755N. Congressional marks are recorded on the program element, not on a project.
Project 3358 — SSDS Training Improvement Program — requests $8.7M in FY2027, 5.6% of the $156.2M requested for program element 0604755N. Year over year it falls 25% against FY2026.
Project 3358 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 12.5 |
| FY2026 | Enacted | 11.5 |
| FY2027 | Request | 8.7 |
| FY2028 | Outyear | 9.0 |
| FY2029 | Outyear | 8.9 |
| FY2030 | Outyear | 8.9 |
| FY2031 | Outyear | 9.1 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work -Continue to develop requirements and Concepts of Integration (COI) for potential future training capabilities for Joint Strike Fighter, Naval Strike Missile on SSDS, CAC2S, NightStalker, and CRDC/ARDC Defense capability. -Continue to update training curriculum as new capability packages are developed. -Continue to update/deliver SSDS Tactical Virtualized Operator Trainer (VOT) as new capability packages are developed. -Continue integration of Advanced Training Domain (ATD) with SSDS BL12 with TI12, TI12H, and TI16. -Continue integration of ATD with SSDS on MK6 MODX Platforms which supports Infrastructure-as-a-Service (IaaS). -Continue integration Shipboard Panoramic Electro-Optic/Infrared…
FY2026 to FY2027 change FY 2026 to FY2027 funding decrease of $2.864M FY27 will delay integration of Advanced Training Domain to the new Integrated Combat System, impeding the sailor's ability to train on the latest shipboard systems at the speed of relevance. Work set to start in FY27 in training would include training for SPY 6 and will delay the completion of Training LVC efforts.
FY2026 plans — current year -Continue to develop requirements and Concepts of Integration (COI) for potential future training capabilities for Joint Strike Fighter, Naval Strike Missile on SSDS, CAC2S, NightStalker, and CRDC/ARDC Defense capability. -Continue to update training curriculum as new capability packages are developed. -Continue to update/deliver SSDS Tactical Virtualized Operator Trainer (VOT) as new capability packages are developed. -Continue Test LINK 16 TADIL capability for training to allow simulated LINK 16 message transmission between the training domain to the SSDS combat system supporting Digital Air Control and particularly AOEW training simulation. -Continue integration of Advanced Training…
Named performers on project 3358
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3358 buys
SSDS Training Improvement Program provides enhancements and upgrades to the SSDS Total Ship Training Capability (TSTC) components within the combat system. This includes improvements to combat system elements, Battle-Force Tactical Training (BFTT), and the Advanced Training Domain (ATD). These upgrades address the need for increased training capability and functionality in conjunction with SSDS MK2 incremental capability packages, the Far-Term Interoperability Improvement Project (FTIIP), Task Force Cyber Awakening (TFCA) Boundary Defense Capability (BDC), and Technical Insertion efforts under PU 2178 (QRCC). The program also enhances and upgrades existing capabilities by developing reusable common components that can be leveraged by SSDS MK2 combat systems. These components are either newly developed or integrated from reusable common components developed by the TSTC/BFTT Program and AEGIS Advanced Training Domain (ATD)/TSTC Total Ship Training Capability (TSTC) projects to meet AEGIS combat system training requirements. TSTC continues to integrate and update as new tactical capabilities are introduced. This enables crew operator proficiency training for basic and sustainment level training events through distributed strike group certification fleet synthetic training (FST) events, including COMPTUEX FST at-Sea integration into a Live, Virtual, and Constructive (LVC) environment. Continued development is required to integrate new capabilities and interfaces to provide training for AEGIS and SSDS combat system capability upgrades and to address the Fleet's Live, Virtual, and Constructive (LVC) Fleet Training Wholeness initiative. Modernization is also needed to support the DoW Training Transformation Plan, the Chief of Naval Operations Fleet Response Plan, and the Commander United States Fleet Forces Command Fleet Readiness Training Plan. The Advanced Training Domain (ATD) is being developed to combine BFTT and the AEGIS Combat Training System (ACTS) into a common system that integrates with AEGIS BL 9.2.2AF, and SSDS BL 12xAF. ATD is hosted along with the AEGIS and SSDS combat system on TI-16 common processing and display hardware. ATD is designed to be the core of the Total Ship Training Capability, providing a more reliable, user-friendly, and architecturally extensible system to meet future interoperability and capability enhancement challenges.
- Product Development
Joint Non-Lethal Weapons — one RDT&E project inside PE 0604755N. Congressional marks are recorded on the program element, not on a project.
Project 3172 — Joint Non-Lethal Weapons — requests $2.7M in FY2027, 1.7% of the $156.2M requested for program element 0604755N. Year over year it falls 3.3% against FY2026.
Project 3172 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 3.1 |
| FY2026 | Enacted | 2.8 |
| FY2027 | Request | 2.7 |
| FY2028 | Outyear | 2.8 |
| FY2029 | Outyear | 2.8 |
| FY2030 | Outyear | 2.8 |
| FY2031 | Outyear | 2.9 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work The NNLE program will focus on deployment methodology selection, development, and testing; material packaging to support deployment method; and mission scenario driven at-sea testing. The NNLE program will conduct integration and operational testing in FY27.
FY2026 to FY2027 change No significant changes
FY2026 plans — current year The NNLE program will focus on deployment methodology selection, development, and testing; material packaging to support deployment method; and mission scenario driven at-sea testing in FY26.
What project 3172 buys
The Navy Non-Lethal Effects (NNLE) program develops non-lethal weapon systems in support of anti-terrorism/force protection missions. Technologies include, but are not limited to: ocular interrupters, vessel propeller occlusion systems, and acoustic hailing devices. Current efforts are focused on the Long-Range Ocular Interrupter (LROI), Maritime Vessel Stopping (MVS) technologies, and Acoustic Hailing Devices (AHD). The LROI is intended to provide the U.S. Navy with the capability to deliver a bright light producing a dazzling or glare effect on a closing target to warn and/or suppress potential threats through increasing levels of visual degradation. LROI will generate a non-lethal, eye safe laser that will provide warning and suppression effects. The extended range capability of LROI will effectively increase tactical decision-making time in support of Escalation of Force (EoF) Tactics, Techniques and Procedures (TTP) across a broad Range of Military Operations (ROMO). Further, the LROI will enhance Joint Force operations in determining the intent of a potential threat as early as possible. The MVS technologies are systems designed to temporarily disable, slow, or stop waterborne vessels of varying degrees of size and different propulsion types in order to effectively execute escalation of force and intent determination procedures. The MVS technologies will provide the U.S. Navy with lightweight, compact, and reversible solution which will stop or slow marine platforms by occlusion of any type of marine propeller or propulsion. AHSs project intelligible speech out to extended ranges. In addition to long-range projection of speech for warning or instructional purposes, the devices are also capable of transmitting loud tones that can distract or deter personnel from approaching U.S. positions or vessels.
- Product Development
- Test and Evaluation
- Management Services