Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $114.3M for Submarine Acoustic War Dev under RDT&E program element 0101226N, up 140% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 99.2 |
| FY2026 | Enacted | 47.7 |
| FY2027 | Request | 114.3 |
| FY2028 | Outyear | 114.8 |
| FY2029 | Outyear | 103.7 |
| FY2030 | Outyear | 99.8 |
| FY2031 | Outyear | 102.4 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
4 projects roll up into PE 0101226N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 140% overall, which can hide much larger swings below.
Sub Defensive Warfare
Non-Traditional Acoustic Communications (NTAC)
Congressional Adds
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 25% | 28.8 |
| Government labs & warfare centers | 43% | 49.2 |
| Other / unspecified | 32% | 36.3 |
| FY2027 request | 100% | 114.3 |
Mission & acquisition strategy
The Submarine Acoustic Warfare (SAWS) Development Program develops acoustic countermeasures, submarine defense capabilities, external launch systems and all acoustic augmentation systems for the U.S. Navy submarines. The SAWS Development Program is comprised of Submarine Torpedo Defensive Systems (SubTDS) (MK 5 and MK 6), Submarine Tethered Expendable Buoy (STEB), Compact Rapid Attack Weapon (CRAW), Non-Traditional Acoustic Communications (NTAC), and Submarine Launched Unmanned Aerial System (SLUAS).
The CRAW acquisition strategy is to use two incremental Technology Insertions (TIs) to deliver a new submarine launched very-lightweight torpedo capability. The CRAW TI-1 effort is being executed as a Middle Tier of Acquisition (MTA) effort and will rapidly develop fieldable prototypes to demonstrate the new very-lightweight torpedo ASW capabilities in an operational environment and provide for a residual operational capability. A competitive industry development OTA for CRAW TI-2 was awarded in FY 2022 to Raytheon (Prime Contractor) to establish a manufacturable CRAW design baseline. The CRAW operational software will be developed by PSU-ARL.
- Product Development
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what RTX / Raytheon has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0101226N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksCompact Rapid Attack Weapon (CRAW) — one RDT&E project inside PE 0101226N. Congressional marks are recorded on the program element, not on a project.
Project 1267 — Compact Rapid Attack Weapon (CRAW) — requests $89.1M in FY2027, 78% of the $114.3M requested for program element 0101226N. Year over year it grows 270% against FY2026.
Project 1267 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 73.1 |
| FY2026 | Enacted | 24.1 |
| FY2027 | Request | 89.1 |
| FY2028 | Outyear | 90.5 |
| FY2029 | Outyear | 85.1 |
| FY2030 | Outyear | 82.2 |
| FY2031 | Outyear | 84.5 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
-TI-1: Conduct Quick Reaction Assessment (QRA) test event and close out MTA -TI-1: Deliver TI-1 units -Continue Modeling and Simulation development -TI-2: Begin procurement of TI-2 Proof of Design units -TI-2: Begin TI-2 early DVT and Qualification testing -TI-2: Award competitive afterbody contract -TI-2: Continue APB-2 (ATT) software…
Read the FY2027 plan →Named performers on project 1267
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1267 buys
The CRAW Research, Development, Test & Evaluation (RDT&E) program will deliver a new very-lightweight torpedo capability to the Submarine Fleet that provides enhanced Anti-Submarine Warfare (ASW) and Anti-Torpedo Torpedo (ATT) mission capabilities. The CRAW development program leverages torpedo hardware developed by the Anti-Torpedo Torpedo Defense System (ATTDS) program and very-lightweight torpedo technologies developed by ONR. Two incremental hardware Technology Insertions (TIs), TI-1 and TI-2, will be used to deliver developmental prototypes to support Engineering, Development, and Operational Testing. The ASW and ATT capabilities will be delivered via two Advanced Processor Build (APB) software spirals. The ASW capability will be part of APB-1 and the ATT capability will be included in APB-2. The CRAW TI-1 effort is being executed as a Middle Tier of Acquisition (MTA) effort and will rapidly develop fieldable prototypes to demonstrate the new very-lightweight torpedo ASW capabilities in an operational environment. The TI-2 effort will update the TI-1 baseline to address obsolescence and improve producibility and supportability so that the CRAW capability can be fielded broadly across the submarine force. The TI-2 program is being executed as a post-Milestone B, ACAT III Major Capability Acquisition Program. The TI-2 program is being phased with the TI-1 effort so that the TI-2 program can fully leverage the TI-1 prototypes as proof of design hardware. This will reduce overall cost of the TI-2 program. LRIP units to support Operational Testing will also be delivered as part of TI-2. CRAW RDT&E funding also supports submarine launcher system upgrades and integration. Launcher system modifications will include development of launch capabilities from vertical and horizontal launch tubes. This includes the development of the Revolver launcher system that enables launch of multiple very-lightweight torpedoes from standard submarine torpedo tubes. The TI-2 program will develop and deliver proof of manufacturing prototypes that will be used to reduce risk associated with starting manufacturing and production of new very- lightweight torpedoes. The TI-2 prototypes will support Development Testing to collect data on performance, inform any refinement of hardware, and inform assessments of technical risks.
- Product Development
- Test and Evaluation
- Management Services
Sub Defensive Warfare — one RDT&E project inside PE 0101226N. Congressional marks are recorded on the program element, not on a project.
Project 1265 — Sub Defensive Warfare — requests $20.4M in FY2027, 18% of the $114.3M requested for program element 0101226N. Year over year it grows 6.0% against FY2026.
Project 1265 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 17.2 |
| FY2026 | Enacted | 19.2 |
| FY2027 | Request | 20.4 |
| FY2028 | Outyear | 17.7 |
| FY2029 | Outyear | 13.0 |
| FY2030 | Outyear | 13.1 |
| FY2031 | Outyear | 13.3 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
-MK5 DT/OT -Continue deliveries of MK5 LRIP units -Continue MK6 Prototype Development
Read the FY2027 plan →- Continue efforts to design, prototype, and qualify the ICL breech door that enables pre/post-launch connectivity with a STEB.
Named performers on project 1265
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1265 buys
Project 1265 SubTDS The first effort of the overall SubTDS program focuses on delivering full ICL functionality to all submarines in the fleet via the ADC MK5 effort. The ADC MK5 incorporates new adaptive technologies in a three-inch diameter form factor and will evolve through software/hardware upgrades, improved mobility, combat control system integration via ICL, and enhanced functionality to counter advancing torpedo threats. ADC MK6 effort focuses on developing an ECL hosted 6-inch acoustic countermeasure to supersede the ADC MK3. PMS415 STEB effort is limited to the development of changes to the ICL, specifically the breech door, to provide a stand-alone power and communications capability to the payload through the ICL via a TEMPALT, with funding ending in FY 2026.
- Product Development
- Test and Evaluation
- Management Services
Non-Traditional Acoustic Communications (NTAC) — one RDT&E project inside PE 0101226N. Congressional marks are recorded on the program element, not on a project.
Project 1268 — Non-Traditional Acoustic Communications (NTAC) — requests $4.8M in FY2027, 4.2% of the $114.3M requested for program element 0101226N. Year over year it grows 9.3% against FY2026.
Project 1268 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.0 |
| FY2026 | Enacted | 4.4 |
| FY2027 | Request | 4.8 |
| FY2028 | Outyear | 6.6 |
| FY2029 | Outyear | 5.6 |
| FY2030 | Outyear | 4.5 |
| FY2031 | Outyear | 4.6 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work -Continue NTAC SE efforts -Continue NTAC Development, Testing, and Release Software Spirals
FY2026 to FY2027 change Funding increase from FY 2026 to FY 2027 of $1.803M for efforts to modernize the NTAC Code baseline and support additional backfit capability while fielding NTAC to current fleet assets.
FY2026 plans — current year -NTAC Systems Engineering: Continue Systems Engineering (SE) efforts -NTAC Software Development: Continue development of capability improvements
FY2027 planned work -SLUAS System Engineering and Development: Continue the development to integrate the new SLUAS AUR variant into host submarine -SLUAS AUR Development: Continue the next SLUAS UAV software development
FY2026 to FY2027 change Funding decrease from FY 2026 to FY 2027 of $1.392M due to rephasing some FY 2027 efforts into FY 2028 and FY 2029.
FY2026 plans — current year -SLUAS Unmanned Aerial System: Start development UxV CSS and trainers to align with the new SLUAS AUR capability -SLUAS Systems Engineering: Continue Systems Engineering efforts
What project 1268 buys
NTAC is a software-based solution that leverages existing hardware components on target platforms, including submarines, to provide advanced undersea acoustic communications. The NTAC program is developing and integrating new communications capabilities and improved performance via software upgrades. SLUAS extends the sensor range of the submarine. SLUAS sub-systems include the unmanned aerial vehicle (UAV), UAV encapsulating launch canister, UAV command and control capabilities, and onboard stowage.
- Product Development
- Management Services
Congressional Adds — one RDT&E project inside PE 0101226N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $114.3M requested for program element 0101226N.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 3.9 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
Revolver delivers hardware and middleware to enable smaller payloads to be launched from a VIRGINIA Class Torpedo Tubes. CRAW will be the first payload integrated for use with the Revolver production baseline. While CRAW will be the initial payload integrated with Revolver, additional payloads that meet interface requirements can be integrated. Project C311: Congressional Add in FY 2025 ($3.858M) - Accelerate revolver integration
- Product Development
- Test and Evaluation