RDT&E Program Element · President's Budget PB2027

Integrated Surveillance System

PE 0204311N·U.S. Navy·Approp. 1319 — RDT&E·BA7 — Operational System Development
FY2027 Request
$71.9M
Navy · RDT&E
HitchAI read

U.S. Navy requests $71.9M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Lockheed Martin leads the industry work.

FY2027 Request
$71.9M
▲ 0.1% vs FY2026
FY2026 Enacted
$71.8M
▲ 0.5% vs FY2025
FY2025 Actual
$71.5M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $71.9M for Integrated Surveillance System under RDT&E program element 0204311N, up 0.1% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075071.5FY25ACTUAL71.8FY26ENACTED71.9FY27REQUEST82.0FY2884.6FY2984.9FY3086.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual71.5
FY2026Enacted71.8
FY2027Request71.9
FY2028Outyear82.0
FY2029Outyear84.6
FY2030Outyear84.9
FY2031Outyear86.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0204311N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 0% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$71.9M
House NDAA (HASC)HASC
$71.9M full · +$0
Senate NDAA (SASC)SASC
$71.9M full · +$0
House Approps (HAC-D)HAC_D
$71.9M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Lockheed Martin
$7.5M · 10%
IUSS COMMON ARCHITECTURE · CPFF
Where FY2027 funding flowsShare$M
Industry primes14%10.1
Government labs & warfare centers24%17.0
Other / unspecified62%44.8
FY2027 request100%71.9
See Lockheed Martin's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Deployable Surveillance Systems (DSS) project (0344), complementing the Fixed Surveillance System (FSS) and Surveillance Towed Array Sensor System (SURTASS), provides flexible and responsive wide area surveillance to the Theater Undersea Warfare (TUSW) commanders worldwide. DSS will operate as adjunct systems to meet the established FSS and SURTASS missions and to meet additional missions as articulated in the OPNAV Top Level Requirements documents and follow-on Course of Action Analysis (COAA) and as dictated by TUSW commanders evolving and emergent operational requirements. DSS is comprised of the following systems: Deep Water Passive (DWP) and Deep Water Active (DWA).

FY 2025: ICP Tech Refresh. TL-29A/ICP FOT&E FY 2026: ICP Development, Security and Operations (DevSecOps) Software Updates, TL-29A/ICP FOT&E, Team Trainer development FY 2027: ICP Development, Security and Operations (DevSecOps) Software Updates, TL-29A/ICP FOT&E, STT, NGSA development The FSS portion of 0766 is classified with details available at a higher classification level.

Project 0766, 0344, 1768 — IUSS Detect/Classif System
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0204311N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0204311N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Integrated Surveillance System (PE 0204311N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0204311N
Machine access
Markdown twin /programs/0204311N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$57.4M
▼ 3.4% vs FY2026
FY2026 Enacted
$59.4M
▲ 14% vs FY2025
FY2025 Actual
$52.1M
Prior year

IUSS Detect/Classif System — one RDT&E project inside PE 0204311N. Congressional marks are recorded on the program element, not on a project.

Project 0766 — IUSS Detect/Classif System — requests $57.4M in FY2027, 80% of the $71.9M requested for program element 0204311N. Year over year it falls 3.4% against FY2026.

Funding trajectory

Project 0766 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550052.1FY25ACTUAL59.4FY26ENACTED57.4FY27REQUEST67.7FY2870.9FY2971.2FY3072.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual52.1
FY2026Enacted59.4
FY2027Request57.4
FY2028Outyear67.7
FY2029Outyear70.9
FY2030Outyear71.2
FY2031Outyear72.6
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$13.9M
FY2026 enacted$12.3M
FY2027 request$11.0M

- Continue Advanced Capabilities development of Artificial Intelligence/Machine Learning algorithms for enhanced human-machine performance; Continue system infrastructure modernization to streamline system development, to provide more flexibility in hardware and to enable for more frequent software updates of software to include…

Read the FY2027 plan →
TL-29A/Twin-Line▼ 73%
FY2025 actual$4.0M
FY2026 enacted$3.7M
FY2027 request$1.0M

- Continue development of upgraded telemetry components to address component obsolescence. - Continue development of fishing net mitigation solutions and upgrades to reduce potential for array damage from fishing apparatus. - Continue at-sea test and evaluation efforts to demonstrate passive array system hardware and processing…

Compact Low Frequency Active (CLFA)▼ 30%
FY2025 actual$1.0M
FY2026 enacted$2.0M
FY2027 request$1.4M

-Continue product improvement and upgrade efforts for SURTASS/LFA/CLFA systems -Continue development of Cyber Security enhancements -Conduct Pierside and At-Sea T&E of LFA/CLFA enhancements -Conduct Cyber Security evaluation and testing of deployed systems

SURTASS Team Trainersflat
FY2025 actual$0.0M
FY2026 enacted$0.4M
FY2027 request$0.4M

- Continue development efforts for SURTASS Team Trainers for hardware and processing to support new passive and active arrays/sensors, communications and ship equipment.

Next Generation SURTASS ArrayNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$8.1M

- Commence development for Next Generation Surveillance array. - Award contract and begin Engineering Development Model (EDM) build.

Classified Effort▼ 14%
FY2025 actual$33.1M
FY2026 enacted$41.1M
FY2027 request$35.5M

The FSS portion of 0766 is classified with details available at a higher classification level.

Project 0766 — every activity in full →
Who's building it

Named performers on project 0766

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$7.5M · 13%
L3Harris
$0.7M · 1.2%
NIWC PAC
$0.3M · 0.5%
OPTEVOR
$0.3M · 0.4%
Project detail

What project 0766 buys

The Surveillance Towed Array Sensor System (SURTASS) project comprises the mobile, tactical arm of the Integrated Undersea Surveillance System (IUSS), providing long range detection and cueing for tactical weapons platforms against both diesel- and nuclear-powered submarines. SURTASS also provides the undersea surveillance necessary to support regional conflicts and sea-lane protection. SURTASS has recent passive and active success against diesel submarines operating in both shallow and deep ocean environments. SURTASS is leveraging existing developments and reducing costs by using Non-Developmental Items and commercial hardware, supporting common Navy Undersea Warfare processing and towed array developments, and increasing operator efficiency through computer-aided detection and classification processing. SURTASS development efforts include Low Frequency Active (LFA)/Compact Low Frequency Active (CLFA) improvements, common IUSS processing, twin-line array development and processing, next generation array developments, improved detection and classification/passive automation to counter quieter threats, integrated active and passive operations, and improved Battle Group support. LFA/CLFA provides an active adjunct capability for IUSS passive and tactical sensors to counter the quieter diesel and nuclear threats of the 2020s and beyond. Improvements include TL-29A/LFA/CLFA integration enhancements, advanced waveforms for littoral/shallow water operations including Doppler sensitive waveforms, and processing algorithms to reduce clutter and reverberation false alarms in shallow water. The Integrated Common Processor (ICP) is a derivative of the Naval Sea Systems Command (NAVSEA) Submarine Acoustic Rapid Commercial Off the Shelf (COTS) Insertion (ARCI) program and is being augmented for IUSS requirements. Together, the LFA/CLFA improvements, TL-29A, and the ICP support the SURTASS Active Improvement Program. Functional improvements to ICP/SURTASS are delivered to the Fleet in software "builds" under the DevSecOps process, while hardware improvements are delivered through the Tech Insertion (TI) process. SURTASS participates in the process by contributing algorithms for consideration, supplying peer group members for review of candidate algorithms, participating in test evolutions, and incorporating improved algorithms into operational systems.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$14.5M
▲ 17% vs FY2026
FY2026 Enacted
$12.4M
▼ 24% vs FY2025
FY2025 Actual
$16.3M
Prior year

Deployable Surveillance Systems — one RDT&E project inside PE 0204311N. Congressional marks are recorded on the program element, not on a project.

Project 0344 — Deployable Surveillance Systems — requests $14.5M in FY2027, 20% of the $71.9M requested for program element 0204311N. Year over year it grows 17% against FY2026.

Funding trajectory

Project 0344 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

016.3FY25ACTUAL12.4FY26ENACTED14.5FY27REQUEST14.3FY2813.6FY2913.7FY3014.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.3
FY2026Enacted12.4
FY2027Request14.5
FY2028Outyear14.3
FY2029Outyear13.6
FY2030Outyear13.7
FY2031Outyear14.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Deployable Surveillance Systems (DSS) Deep Water Active (DWA)▲ 17%
FY2025 actual$16.3M
FY2026 enacted$12.4M
FY2027 request$14.5M

- Design and Fabricate EDM cluster - Commence and Complete Engineering Development Model (EDM) Developmental Testing (DT)

Project 0344 — every activity in full →
Who's building it

Named performers on project 0344

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

BAH
$0.8M · 5.5%
NIWC PAC
$0.3M · 2.2%
OPTEVFOR
$0.2M · 1.2%
Project detail

What project 0344 buys

The Deployable Surveillance Systems (DSS) project (0344), complementing the Fixed Surveillance System (FSS) and Surveillance Towed Array Sensor System (SURTASS), provides flexible and responsive wide area surveillance to the Theater Undersea Warfare (TUSW) commanders worldwide. DSS will operate as adjunct systems to meet the established FSS and SURTASS missions and to meet additional missions as articulated in the OPNAV Top Level Requirements documents and follow-on Course of Action Analysis (COAA) and as dictated by TUSW commanders evolving and emergent operational requirements. DSS is comprised of the following systems: Deep Water Passive (DWP) and Deep Water Active (DWA). Informed by TUSW Offset operations and the tailored requirements process, the DSS Middle Tier Acquisition (MTA) Rapid Fielding Program focused initially on the DWP increment and associated spiral development updates. Spiral developments to meet the evolving submarine threat will leverage on-going Navy, Defense Advanced Research Projects Agency (DARPA), and small business research efforts including processing and sensor technology. The follow-on increment is on DWA where FY23-26 includes funds that will provide a rapidly deployable sustained surveillance capability in response to emergent Fleet Undersea Warfare (USW) coverage gaps to include mitigating array outages or platform shortages. FY27 includes funds for DWA that will provide a rapidly deployable sustained surveillance capability in response to emergent Fleet Undersea Warfare (USW) coverage gaps to include mitigating array outages or platform shortages. The FY 2027 cost of the DSS Middle Tier of Acquisition effort is $15.120 million, including RDT&E and procurement of prototype units.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$3.1M
Prior year

Ship Plan Development and Design — one RDT&E project inside PE 0204311N. Congressional marks are recorded on the program element, not on a project.

Project 1768 — Ship Plan Development and Design — requests $0.0M in FY2027, 0.0% of the $71.9M requested for program element 0204311N.

Funding trajectory

Project 1768 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

03.1FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual3.1
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

T-ARC(X) Cable Ship Design and Total Ship Integration
FY2025 actual$3.1M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2026 to FY2027 change Based on evolving Navy priorities and a strategic pause in acquisition planning, the release of the RFP to support industry led Preliminary Designs has been deferred beyond FY 2027, resulting in the zeroing of funding in that year.

FY2026 plans — current year Completed industry studies in FY 2023 and indicative design activities in FY 2024 to refine ship requirements and cost estimates. Based on evolving Navy priorities and a strategic pause in acquisition planning, the release of the RFP to support industry-led Preliminary Designs has been deferred beyond FY 2026, resulting in the zeroing of funding in that year.

Project detail

What project 1768 buys

T-Auxiliary, Repair, Cable (T-ARC) is a candidate replacement program for U.S. Navy's only organic undersea cable laying and repair ship, USNS ZEUS (T-ARC 7), which is at the end of her extended service life. The ship's main mission is to deploy, repair, and retrieve undersea cables and equipment, with a secondary mission of towing projectors.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation