Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $16.7M for MQ-9 UAV under RDT&E program element 0205219F, down 49% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.8 |
| FY2026 | Enacted | 32.6 |
| FY2027 | Request | 16.7 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
3 projects roll up into PE 0205219F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -49% overall, which can hide much larger swings below.
Squadron Operations Centers (SOC)
MQ-9 Upgrade
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 61% | 10.2 |
| Other / unspecified | 39% | 6.5 |
| FY2027 request | 100% | 16.7 |
Mission & acquisition strategy
The MQ-9 Reaper system is a modular and adaptable system comprised of the Aircraft, sensors, Ground Control Station (GCS), kill chain integration, communications equipment, weapon kits, support equipment, simulator and training devices, Readiness Spares Packages (RSP), technical data/training, and required personnel to operate, maintain, and sustain the system. Mission-specific equipment is employed to allow specific aircraft and GCS configurations to be tailored to fit mission needs. Current President's Budget request supports 56 Combat Lines to meet DoD force offering requirements to combat threats.
Acquisition of MQ-9 Upgrade is accomplished via sole-source contracts with General Atomics-ASI, Raytheon, and L-3 Communications, prime contractors, and Other Government Agencies. Management of development and fielding of new capabilities will be through an Agile Acquisition Strategy that combines the rigor of an event driven development process (referred to as a Technology Maturation Effort (TME)) with the expedited delivery of a schedule driven integration and fielding process. This will allow continued baseline improvements while rapidly integrating limited urgent needs fleet-wide.
- Product Development
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what GA-ASI has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0205219F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksMQ-9 SLAM — one RDT&E project inside PE 0205219F. Congressional marks are recorded on the program element, not on a project.
Project 675212 — MQ-9 SLAM — requests $16.7M in FY2027, 100% of the $16.7M requested for program element 0205219F. Year over year it falls 48% against FY2026.
Project 675212 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 32.3 |
| FY2027 | Request | 16.7 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
In FY2027 MQ-9 SLAM will continue development and integration of the following capabilities: •Operational Flight Plan (OFP) releases •Potential C2 resiliency efforts which include Proliferated Low Earth Orbit (PLEO) •Potential DMS issues
Read the FY2027 plan →In FY2027 test support will continue to provide government agencies support for MQ-9 testing to include acceptance testing of weapon system hardware/software in accordance with contract standards, developmental testing of new capabilities, and R&M improvements. FY2027 accomplishments include: •Test planning and initial integration test…
Named performers on project 675212
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 675212 buys
The MQ-9 System Lifecycle Agile Modernization (SLAM) Program enables rapid fielding of new software, hardware, and integration for the MQ-9 fleet to meet evolving mission needs. The objective is to rapidly field new software, hardware, and sustainability improvements into the MQ-9 fleet, addressing requirements from the Combat Capability List (CCL). These requirements include but are not limited to: MQ-9 Multi-Domain Operations (M2DO); streamlining system configurations; performing technology upgrades; enhancing pilot awareness and usability; improving reconnaissance, targeting, and exploitation capabilities; expanding weapons system selection and lethality; increasing suitability for diverse operational theaters; improving security and self-protection measures; reducing the logistics footprint; providing warfighter training; concept exploration; Diminishing Manufacturing Source (DMS); and developing prototypes. MQ-9 is currently supporting Joint Urgent Operational Need (JUON) CC-0575, CC-0578, and EC-0020. M2DO configuration consists of Anti-Jamming GPS, Enhanced Power, Link 16, Open Mission System (OMS) (to include Stellar Relay and Intelligent Electronics Unit (iEU)), and Command and Control (C2) Resiliency to maintain its viability in modern conflict. In the FY2025 PB there was a database error which incorrectly placed the entire budget of $6.581M in the MQ-9 Upgrade BPAC (675249). The Air Force will execute the FY2025 budget out of both the MQ-9 Upgrade BPAC (675249) and the MQ-9 SLAM BPAC (675212). This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605829F, 0605831F, 0605833F, or 0605898F.
- Product Development
- Test and Evaluation
- Management Services
Squadron Operations Centers (SOC) — one RDT&E project inside PE 0205219F. Congressional marks are recorded on the program element, not on a project.
Project 675247 — Squadron Operations Centers (SOC) — requests $0.0M in FY2027, 0.0% of the $16.7M requested for program element 0205219F. Year over year it falls 100% against FY2026.
Project 675247 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.3 |
| FY2026 | Enacted | 0.3 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work There are no RDT&E efforts planned and no funding allotted.
FY2026 to FY2027 change Program transitioned to operations and sustainment.
FY2026 plans — current year Continued support of the DT/OT SOC. This is required to integrate new technologies to maintain currency with technological and platform advancements in SOC Systems Integration Lab (SIL).
What project 675247 buys
The SOC is required to employ Remote Split Operations (RSO). It provides the communications, network, aircraft control and sensor distribution circuits to effectively execute RSO missions. The SOC provides CONUS-based aircrews mission data, tasking, and ability to disseminate and exchange mission data with decision-makers and intelligence entities. This effort defines component standards, develops, and integrates new technologies to maintain currency with technological and platform advancements. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.
- Support
MQ-9 Upgrade — one RDT&E project inside PE 0205219F. Congressional marks are recorded on the program element, not on a project.
Project 675249 — MQ-9 Upgrade — requests $0.0M in FY2027, 0.0% of the $16.7M requested for program element 0205219F.
Project 675249 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.6 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work MQ-9 Upgrade development is complete.
FY2026 plans — current year MQ-9 Upgrade development is complete.
FY2027 planned work MQ-9 Upgrade development is complete.
FY2026 plans — current year MQ-9 Upgrade development is complete.
What project 675249 buys
The MQ-9 Upgrade Program delivers new software, hardware, and integrations to the MQ-9 fleet to keep pace with changing mission demands. The goal is to introduce improvements in software, hardware, and sustainability, addressing requirements outlined in the Combat Capability List (CCL). These requirements encompass a wide range of areas, including MQ-9 Multi-Domain Operations (M2DO), simplified system configurations, technology upgrades, enhanced pilot awareness, improved reconnaissance and targeting, expanded weapon options, increased adaptability to different environments, better security, reduced logistical burden, warfighter training, and addressing parts obsolescence. The MQ-9 program is currently supporting Joint Urgent Operational Needs requests CC-0575, CC-0578, and EC-0020. M2DO configuration consists of Anti-Jamming GPS, Enhanced Power, Link 16, Open Mission System (OMS) (to include Stellar Relay and Intelligent Electronics Unit (iEU)), and Command and Control (C2) Resiliency to maintain its viability in modern conflict. In the FY2025 PB there was a database error which incorrectly placed the entire budget of $6.581M in the MQ-9 Upgrade BPAC (675249). The Air Force will execute the FY2025 budget out of both the MQ-9 Upgrade BPAC (675249) and the MQ-9 SLAM BPAC (675212). FY2025 was rescinded $1.700M and is not reflected in this budget documentation. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605829F, 0605831F, 0605833F, or 0605898F.
- Product Development
- Test and Evaluation
- Management Services