RDT&E Program Element · President's Budget PB2027

Advanced Arresting Gear (AAG)

PE 0604530N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$60.5M
◆ Scaling +73%
HitchAI read

U.S. Navy funding ramps 73% to a $60.5M request in FY2027 — the program's peak, before stepping down 91% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. GA leads the industry work.

FY2027 Request
$60.5M
▲ 73% vs FY2026
FY2026 Enacted
$34.9M
▲ 225% vs FY2025
FY2025 Actual
$10.7M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $60.5M for Advanced Arresting Gear (AAG) under RDT&E program element 0604530N, up 73% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550010.7FY25ACTUAL34.9FY26ENACTED60.5FY27REQUEST50.5FY2828.8FY295.8FY305.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual10.7
FY2026Enacted34.9
FY2027Request60.5
FY2028Outyear50.5
FY2029Outyear28.8
FY2030Outyear5.8
FY2031Outyear5.4
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0604530N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 73% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$60.5M
House NDAA (HASC)HASC
$60.5M full · +$0
Senate NDAA (SASC)SASC
$60.5M full · +$0
House Approps (HAC-D)HAC_D
$60.5M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

GA
$37.5M · 62%
Primary HW Dev - FLASH Capacitor · CPFF
NAWCAD
$16.1M · 27%
Primary SW Development - Software Stability
Where FY2027 funding flowsShare$M
Industry primes90%54.7
Other / unspecified9.6%5.8
FY2027 request100%60.5
See GA's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Advanced Arresting Gear (AAG) program designed, developed, tested and fielded an aircraft arrestment system to replace the legacy Mark 7 arresting gear. AAG systems are being installed on all new construction aircraft carriers. AAG will provide the U.S. Navy with improved operational capability, while reducing operating and support costs. The AAG system will recover all existing and projected carrier-based tail hook-equipped air vehicles well into the 21st century.

The Navy competitively awarded two Cost Plus Fixed Fee Technical Development phase contracts to develop the Advanced Arresting Gear (AAG) system. Upon completion of the Preliminary Design and Integrated Baseline reviews, the Navy awarded a single Cost Plus Award Fee option to General Atomics for the System Development and Demonstration (SDD) phase to develop and demonstrate a production representative AAG at the NAVAIR Lakehurst Jet Car Track Site and Runway Arrested Landing Site. AAG has transitioned from the design and development phase into concurrent production and sustainment phase.

Project 2367, 9999 — Advanced Arresting Gear
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604530N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what GA has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604530N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Advanced Arresting Gear (AAG) (PE 0604530N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604530N
Machine access
Markdown twin /programs/0604530N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$60.5M
▲ 89% vs FY2026
FY2026 Enacted
$32.0M
▲ 198% vs FY2025
FY2025 Actual
$10.7M
Prior year

Advanced Arresting Gear — one RDT&E project inside PE 0604530N. Congressional marks are recorded on the program element, not on a project.

Project 2367 — Advanced Arresting Gear — requests $60.5M in FY2027, 100% of the $60.5M requested for program element 0604530N. Year over year it grows 89% against FY2026.

Funding trajectory

Project 2367 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550010.7FY25ACTUAL32.0FY26ENACTED60.5FY27REQUEST50.5FY2828.8FY295.8FY305.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual10.7
FY2026Enacted32.0
FY2027Request60.5
FY2028Outyear50.5
FY2029Outyear28.8
FY2030Outyear5.8
FY2031Outyear5.4
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$10.7M
FY2026 enacted$32.0M
FY2027 request$60.5M

Continue Software Stability Development, conduct Software Stability Critical Design Review (CDR), and continue Depot Planning, Software Support Activity, and FLASH development efforts. Continue development efforts for Reliability Engineering Change Proposals (ECPs) including but not limited to ECP-0120 Charging Power Supply, and pECP-027…

Read the FY2027 plan →
Project 2367 — every activity in full →
Who's building it

Named performers on project 2367

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

GA
$37.5M · 62%
NAWCAD
$16.1M · 27%
CMU/SEI
$0.5M · 0.9%
SAIC
$0.3M · 0.5%
Project detail

What project 2367 buys

The Advanced Arresting Gear (AAG) program designed, developed, tested and fielded an aircraft arrestment system to replace the legacy Mark 7 arresting gear. AAG systems are being installed on all new construction aircraft carriers. AAG will provides the U.S. Navy with improved operational capability, while reducing operating and support costs. The AAG system will recover all existing and projected carrier based tail hook-equipped air vehicles well into the 21st century. The AAG program will undergo future system improvements to address safety, obsolescence, reliability, and cyber security to include but not limited to AAG Software Stability, AAG Depot Planning, AAG Software Support Activity (SSA), Reliability Improvement ECPs, Obsolescence ECPs and FLASH. The Software Stability development efforts will address software deficiencies, stability and reliability issues documented in a System Safety Risk Assessment (SSRA) for AAG software, and in a separate investigative report by a NAVAIR Independent Review Team (IRT). Development efforts will mitigate specific findings related to non-deterministic behavior and latency of the software that contribute to the SSRA Hazard rating (1D-Serious). Per IRT report recommendations, these efforts will address findings via software modernization and re-architecture, with new software adhering to improved Level or Rigor (LOR) standards and processes. Development efforts include enhancing the AAG software development laboratory. Completion of AAG Depot Planning includes analysis of test bench and depot repair Support Equipment, final updates to logistics product information and maintenance task analysis, and develop Overhaul work instruction, repair procedures, and overhaul intervals. Previous Depot Planning efforts provided initial analysis and completion of Functional Requirements document (FRD). Depot Planning is approximately 85% complete, and does not have to be 100% complete to begin Depot Standup procurements. AAG SSA funding provides development and execution of a high-level hybrid SSA planning document to ensure software test activities and procedures are implemented for AAG. Reliability improvements will be accomplished with the development of ECPs addressing AAG Production Impacts, including but not limited to ECP-0120 Charging Power Supply, and pECP-027 AAG Water Twister Drain & Fill Kit.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$2.9M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Congressional Adds — one RDT&E project inside PE 0604530N. Congressional marks are recorded on the program element, not on a project.

Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $60.5M requested for program element 0604530N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 9999 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL2.9FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted2.9
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Project detail

What project 9999 buys

Congressional Add: To maintain a decisive warfighting advantage, this Model Based Systems Engineering (MBSE) initiative will modernize requirements management for the EMALS and AAG systems. This critical effort fosters a transition from an obsolete, unsupported MBSE tool - which presents inefficiencies - to a modern, industry-standard platform with no licensing costs. This migration to a common Navy tool will unlock enhanced traceability, streamlined test verification, and seamless interoperability, directly enabling agile acquisition, responsive software support and continuous fleet improvements. Utilizing the most up to date MBSE tool will enable the EMALS and AAG programs to create robust digital models to design, visualize, document, and manage requirements in a streamlined and cost-effective manner.

R-3 lines of work
  • Product Development
  • Support