RDT&E Program Element · President's Budget PB2027

Shipboard Aviation Systems

PE 0604512N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$31.0M
◆ Development crest → decline
HitchAI read

U.S. Navy requests $31.0M in FY2027 (down from a FY2026 peak), before stepping down 62% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. NAWCAD leads the industry work.

FY2027 Request
$31.0M
▼ 8.1% vs FY2026
FY2026 Enacted
$33.7M
▲ 168% vs FY2025
FY2025 Actual
$12.6M
Prior year

For fiscal year 2027, the U.S. Navy is requesting $31.0M for Shipboard Aviation Systems under RDT&E program element 0604512N, down 8.1% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

25012.6FY25ACTUAL33.7FY26ENACTED31.0FY27REQUEST20.7FY2822.4FY2912.5FY3011.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual12.6
FY2026Enacted33.7
FY2027Request31.0
FY2028Outyear20.7
FY2029Outyear22.4
FY2030Outyear12.5
FY2031Outyear11.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0604512N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -8% overall, which can hide much larger swings below.

Project 2232

CV/CVN Launch and Recover

$31.0MFY2027 request ▼ 8%
FY2025 actual$12.6M
FY2026 enacted$33.7M
FY2027 request$31.0M
Product DevelopmentSupportTest and EvaluationManagement Services

This Navy unique project addresses the System Development and Demonstration (SDD) of systems required to recover and launch Navy/Marine Corps Aircraft (Fixed/Rotary Wing and Vertical/Short Take-Off and Landing) operating aboard aircraft carriers (CVN), amphibious assault ships and air capable ships. This program includes the following systems under Project 2232, including the funding of production representative models for: (1) Aircraft Launch & Recovery Equipment (ALRE) Modernization: ALRE Modernization encompasses efforts required to ensure continued functional performance, operational relevance, and cybersecurity accreditation for all product lines across the ALRE program. This includes efforts required to resolve emerging obsolescence issues (both hardware and software), implement fleet driven operational capability upgrades, and comply with cybersecurity requirements and computer task order requirements for security threat mitigation. Major categories include Visual Landing Aids (VLA), Information Systems, Launcher, Recovery, Marine Aviation Data Management System (MADMS) and Aviation Data Management and Control System (ADMACS). There are 48 fielded subsystems that are included in the major categories. The ALRE Gold Disk program provides diagnostic test routines for fleet technician troubleshooting capability on faulty circuit cards to identify the problem and perform the repair. VLA Long Range Line-Up (LRLS) is a solid state system required by CVNs Flight Deck Certification and provides visual cues for approaching fixed wing aircraft to ensure safe recovery of all platforms in all environments. VLA Improved Fresnel Lens Optical Landing System (IFLOLS) provides visual cues to pilots of approaching aircraft and is the primary visual landing aid displaying glide path & trend info to fixed wing pilots on final approach from 1.5 nautical miles out to touchdown.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$0.4M
FY2026 enacted$16.1M
FY2027 request$12.6M

Continue the developmental enhancements to resolve known and emerging capability shortfalls within the major categories of ALRE to include: VLA, Information Systems, Launcher, Recovery, and ADMACS. Continue development of Gold Disk circuit card test routine software. Continue Visual Landing Aids (VLA) Long Range Line of Sight (LRLS)…

Read the FY2027 plan →
Aircraft Launch & Recovery Equipment (ALRE) Service Life Management Program (SLMP)▲ 4%
FY2025 actual$12.2M
FY2026 enacted$17.6M
FY2027 request$18.3M

FY2027 planned work To complete ARC Block upgrade prototype development and to continue systems engineering, test and evaluation support for Jet Car Track Site (JCTS) & Runway Arrested Landing Site (RALS) efforts.

FY2026 to FY2027 change Increase in FY27 for ramp up of Jet Car Track Site (JCTS) & Runway Arrested Landing Site (RALS) testing efforts for ARC Block Upgrade.

FY2026 plans — current year Continue ARC Block upgrade hardware development and systems engineering. Begin ARC Block Upgrade Environmental testing.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$31.0M
House NDAA (HASC)HASC
$31.0M full · +$0
Senate NDAA (SASC)SASC
$31.0M full · +$0
House Approps (HAC-D)HAC_D
$31.0M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

NAWCAD
$15.6M · 50%
Primary SW Dev - ALRE Mod - Gold Disk
NGC
$8.4M · 27%
Primary HW Dev - SLMP · CPFF
Where FY2027 funding flowsShare$M
Industry primes98%30.2
Other / unspecified2.4%0.8
FY2027 request100%31.0
See NAWCAD's full federal contract ledger members
Program detail

Mission & acquisition strategy

This Navy unique project addresses the System Development and Demonstration (SDD) of systems required to recover and launch Navy/Marine Corps Aircraft (Fixed/Rotary Wing and Vertical/Short Take-Off and Landing) operating aboard aircraft carriers (CVN), amphibious assault ships and air capable ships. This program includes the following systems under Project 2232, including the funding of production representative models for: (1) Aircraft Launch & Recovery Equipment (ALRE) Modernization: ALRE Modernization encompasses efforts required to ensure continued functional performance, operational relevance, and cybersecurity accreditation for all product lines across the ALRE program.

Aircraft Launch & Recovery Equipment Modernization: This program ensure continued functional performance, operational relevance, and cybersecurity accreditation for all product lines across the ALRE program. Programs include Visual Landing Aids (VLA), Information Systems, Launcher, Recovery, Marine Aviation Data Management System (MADMS) and Aviation Data Management and Control System (ADMACS). There are 48 fielded subsystems that are included in the major categories.

Project 2232 — CV/CVN Launch and Recover
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what NAWCAD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604512N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Shipboard Aviation Systems (PE 0604512N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604512N
Machine access
Markdown twin /programs/0604512N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks