RDT&E Program Element · President's Budget PB2027

Air Defense Command, Control and Intelligence - Eng Dev

PE 0604741A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$14.3M
◆ Development crest → decline
HitchAI read

U.S. Army requests $14.3M in FY2027, with nothing planned by FY2031. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. JITC leads the industry work.

FY2027 Request
$14.3M
▲ 2.8% vs FY2026
FY2026 Enacted
$13.9M
▼ 40% vs FY2025
FY2025 Actual
$23.3M
Prior year

For fiscal year 2027, the U.S. Army is requesting $14.3M for Air Defense Command, Control and Intelligence - Eng Dev under RDT&E program element 0604741A, up 2.8% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

023.3FY25ACTUAL13.9FY26ENACTED14.3FY27REQUEST14.5FY2814.7FY2914.7FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual23.3
FY2026Enacted13.9
FY2027Request14.3
FY2028Outyear14.5
FY2029Outyear14.7
FY2030Outyear14.7
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0604741A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 3% overall, which can hide much larger swings below.

Project 146

Air & Msl Defense Planning Control Sys

$14.3MFY2027 request ▲ 3%
FY2025 actual$23.3M
FY2026 enacted$13.9M
FY2027 request$14.3M
Management ServicesProduct DevelopmentSupportTest and Evaluation

This funding line is a key enabler of the Army Modernization Priorities in support of Air and Missile Defense. The Air Missile Defense Planning and Control System (AMDPCS) provides integration of air and missile defense operations at all echelons. AMDPCS is comprised of the following major subsystems: Air Missile Defense Work Station (AMDWS) ensures updated interfaces for interoperability between Air Defense and the rest of the force, allowing the Commander the visibility and situational understanding of the airspace; tools in AMDWS afford Soldiers horizontal and vertical collaborative planning with adjacent units. Common Data Link Interface-Module (CDLI-M) serves as a joint tactical datalink gateway/air picture. Forward Area Air Defense (FAAD), correlates the joint and local air picture and when displayed on AMDWS, provides a near real time, three-dimensional air picture for the Commander. Joint Tactical Terminal (JTT) provides Soldiers Theater Ballistic Missile (TBM) early warning allowing them to take appropriate actions. AMDPCS are currently fielded to Army Air and Missile Defense Commands (AAMDC), Air Defense Artillery Brigades, (ADA BDE), Air and Missile Defense Battalions (AMD BN) and Terminal High Altitude Area Defense Batteries (THAAD BTRY). Air Defense Airspace Management (ADAM), a variant of AMDPCS, are fielded to Corps, Divisions, Brigade Combat Teams (BCTs) and multi-functional support brigades. AMDPCS is being procured to support Maneuver Short Range Air Defense (M-SHORAD) growth. As part of the capability and technology reuse, AMDWS external interfaces are being leveraged by Integrated Battle Command System (IBCS) to avoid redevelopment of existing capabilities. AMDWS, CDLI-M, and FAAD are core components of the Air and Missile Defense system-of-systems currently deployed in combat zones. FY 2027 funds support development, cyber security compliance, net-readiness and certification of CDLI-M and FAAD software, as well as accreditation of AMDPCS family-of-systems shelters and software.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
AMDWS Software Development
FY2025 actual$1.3M
FY2026 enacted
FY2027 request

FY2025 accomplishments Maintain interoperability with Command Post Computing Environment (CPCE), migrate to a microservices/container-based architecture and expand Call for Fire (CFF) messaging. Update interface with Missile Defense Agency and the new Kessel Run, which will serve as a replacement for the Theater Battle Management Core System (TBMCS).

Engineering, Development, Test and Evaluation▲ 5%
FY2025 actual$3.9M
FY2026 enacted$3.8M
FY2027 request$4.0M

FY2027 planned work Maintain FAAD C2 net-readiness for cyber security certification and accreditation for all AMDPCS Family-of-Systems and Integrated Battle Command System (IBCS) convergence.

FY2026 to FY2027 change FY 2026 to FY 2027 funding increase due to economic assumptions.

FY2026 plans — current year Maintain FAAD C2 and AMDWS net-readiness for cyber security certification and accreditation for all AMDPCS Family-of-Systems and Integrated Battle Command System (IBCS) convergence.

FY2025 accomplishments Continue to maintain FAAD C2 and AMDWS for cyber certification and accreditation for all AMDPCS Family-of-Systems and Integrated Battle Command System (IBCS) convergence.

Software System Certification Testing, Accreditation, and Approval of Authority-to-Operate (ATO)▲ 2%
FY2025 actual$0.3M
FY2026 enacted$0.3M
FY2027 request$0.3M

FY2027 planned work Conduct Information Assurance Vulnerability Assessments (IAVAs), and associated management activities in addition to maintaining required Authority to Operate (ATOs) for net-readiness and cyber security compliant AMDPCS Family of Systems as they converge to IBCS.

FY2026 to FY2027 change FY 2026 to FY 2027 funding increase due to economic assumptions.

FY2026 plans — current year Conduct Information Assurance Vulnerability Assessments (IAVAs), and associated management activities in addition to maintaining required Authority to Operate (ATOs) for net-ready cyber security compliant AMDPCS Family of Systems as they converge to IBCS.

FY2025 accomplishments Continue to conduct Information Assurance Vulnerability Assessments (IAVAs), and associated management activities in addition to maintaining required Authority to Operate (ATOs) for net ready AMDPCS Family of Systems as they converge to IBCS.

FY2025 actual$8.9M
FY2026 enacted$9.8M
FY2027 request$10.0M

Continue FAAD software integration, development, and tests in support to maintain net ready AMDPCS Family-of-Systems and future program platform requirements in support of IBCS convergence.

Read the FY2027 plan →
IBCS/FAAD C2 Convergence; Ada to C++ Refactoring and Modernization
FY2025 actual$4.9M
FY2026 enacted
FY2027 request

FY2025 accomplishments Continue conversion efforts of FAAD C2 software ADA language to C++. Modernize the Software by Modularizing it. Develop a Software Capabilities SPL to be converged into IBCS for a single software baseline.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$14.3M
House NDAA (HASC)HASC
$14.3M full · +$0
Senate NDAA (SASC)SASC
$14.3M full · +$0
House Approps (HAC-D)HAC_D
$14.3M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Industry primes2.0%0.3
Other / unspecified98%14.0
FY2027 request100%14.3
Program detail

Mission & acquisition strategy

The Air Missile Defense Planning and Control System (AMDPCS) FY 2027 funding request of $14.276 million provides integration of air and missile defense operations at all echelons. Specifically, the Air and Missile Defense Work Station (AMDWS) provides a correlated air picture using local radars, allowing the Commander the visibility and situational understanding of the airspace; automated defense design and staff planning tools in AMDWS allow Soldiers horizontal and vertical collaborative planning with adjacent units.

The acquisition strategy relies primarily on Non-Developmental Item (NDI) integration efforts. The primary intent of the AMDPCS program is to take the best available governmental and commercial technologies and integrate them into a seamless Command and Control (C2) program to provide common tools for airspace situational awareness, and command and control for all Army Air Defense units at all echelons. Also, to continue development, testing, and certification of AMDWS and FAAD software, and ensure accreditation of AMDPCS shelter configurations and software until convergence with the Integrated Air & Missile Defense (IAMD) Battle Command System (IBCS).

Project 146 — Air & Msl Defense Planning Control Sys
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what JITC has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604741A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Air Defense Command, Control and Intelligence - Eng Dev (PE 0604741A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604741A
Machine access
Markdown twin /programs/0604741A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks