Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $126.6M for Army Integrated Air and Missile Defense (AIAMD) under RDT&E program element 0605457A, down 12% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 566.1 |
| FY2026 | Enacted | 143.4 |
| FY2027 | Request | 126.6 |
| FY2028 | Outyear | 35.8 |
| FY2029 | Outyear | 22.8 |
| FY2030 | Outyear | 19.2 |
| FY2031 | Outyear | 19.4 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
2 projects roll up into PE 0605457A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -12% overall, which can hide much larger swings below.
Remote Interceptor Guidance (RIG) 360 Dev and Int
AIAMD is funded on 8 lines across 5 appropriations
This page shows $87.6M of AIAMD, 3.0% of the program's $2.89B FY2027 request. The rest is appropriated elsewhere.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| Lower Tier Air and Missile Defense (AMD) Sensor | Procurement | Army | 2,036.4 |
| AIAMD Software Development & Integration | RDT&E | Army | 653.7 |
| Air and Missile Defense Radar | RDT&E | Navy | 96.6 |
| AIAMD FAMILY OF SYSTEMS (FOS) COMPONENTS | Procurement | Army | 16.4 |
| Joint Regional Integrated Air and Missile Defense Capabilities Mix (JRICM) | RDT&E | Defense-Wide | 1.6 |
| Air and Missile Defense Radar | RDT&E | Navy | 0.5 |
| Air and Missile Defense (AMD) Electronic Warfare | RDT&E | Army | — |
| AIAMD total | Army, Defense-Wide, Navy | 2,892.8 |
Lines whose title names the program. 11 further lines only mention AIAMD in their justification text — those fund something else and are deliberately excluded from the total.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 77% | 97.8 |
| Government labs & warfare centers | 13% | 16.3 |
| Other / unspecified | 9.8% | 12.5 |
| FY2027 request | 100% | 126.6 |
Mission & acquisition strategy
This funding line is directly aligned to the U.S. Army Air and Missile Defense (AMD) Modernization Priority. The Army Integrated Air and Missile Defense (AIAMD) program is a designated Major Defense Acquisition Program (MDAP), a critical component of the Army's AMD strategy, and is a top AMD Cross Functional Team modernization priority program. The funding in this PE provides for hardware upgrade of end items to include design engineering and development changes needed prior to implementation into the baseline. Funding in FY 2026 and FY 2027 also supports convergence of AMDPCS into the IBCS hardware baseline.
Beginning in Fiscal Year 2026, the AIAMD acquisition strategy will diverge into two separate funding paths. A new budget line, PE 0606118A, is being created specifically for the IBCS Software Acquisition Pathway. Consequently, the existing S40 line will pivot to focus exclusively on supporting the development, integration, and testing of IBCS Increment 2 and Increment 3 hardware components. This updated strategy merges the legacy AMDPCS and current IBCS capabilities into the new Increment 3 program. The first project in this program will combine the Engagement Operations Center (EOC) and the tent-based Integrated Collaborative Environment (ICE) into a single M1087A2 Expando Van.
- Product Development
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Northrop Grumman has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0605457A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksArmy Integrated Air and Missile Defense — one RDT&E project inside PE 0605457A. Congressional marks are recorded on the program element, not on a project.
Project S40 — Army Integrated Air and Missile Defense — requests $87.6M in FY2027, 69% of the $126.6M requested for program element 0605457A. Year over year it grows 196% against FY2026.
Project S40 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 492.8 |
| FY2026 | Enacted | 29.6 |
| FY2027 | Request | 87.6 |
| FY2028 | Outyear | 19.4 |
| FY2029 | Outyear | 22.2 |
| FY2030 | Outyear | 18.7 |
| FY2031 | Outyear | 18.9 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funding in FY2025 provides support for software development and integration testing as well as the Guam Defense Systems (GDS) support for the planned architecture. Agile software development continues to support enduring development efforts and includes software fixes and improvements to counter emerging threats and incorporate emerging…
Continues Modeling and Simulation efforts at the Contractor Systems Integration Lab, Government Systems Integration Lab, Joint Interoperability Test Support, Army Test and Evaluation Center, Orange Flag, Project Convergence, Joint All-Domain Command and Control (JADC2), Integrated Fires Test Campaign (IFTC), and White Sands Missile Range…
Funding in FY 2027 will support hardware upgrade development to include upgrades for Major End Items (MEIs), prototypes for emerging new requirements to further mature and validate planned hardware upgrades, and continuing evaluation of MEI upgrades.
Read the FY2027 plan →Funding in FY 2027 will support development and systems engineering activities for the fabrication and integration of IBCS/ADAM prototypes at the A/B interface. Efforts include hardware and software design, updates to interface control documentation, interoperability and data exchange testing, and end-to-end system validation to ensure…
Read the FY2027 plan →Named performers on project S40
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project S40 buys
This funding line is directly aligned to the U.S. Army Air and Missile Defense (AMD) Modernization Priority. The Army Integrated Air and Missile Defense (AIAMD) program is a designated Major Defense Acquisition Program (MDAP), a critical component of the Army's AMD strategy, and is a top AMD Cross Functional Team modernization priority program. The funding in this PE provides for hardware upgrade of end items to include design engineering and development changes needed prior to implementation into the baseline. Funding in FY 2026 and FY 2027 also supports convergence of AMDPCS into the IBCS hardware baseline. In FY 2026, appropriate effort and funds were realigned to PE 0606118A, AIAMD Software Development & Integration to support entering into the Software Pathway. AIAMD is directly aligned to the U.S. Army Air and Missile Defense (AMD) Modernization Priority. The AIAMD program is a direct response to the U.S. Army AMD Concept and Operational and Organizational (O&O) Plan for the Future Force, the AIAMD System of Systems (SoS) Capabilities Development Document (CDD) and the AMD Task Force Concept of Operations (CONOPS) and a top Cross Functional Team Priority. The AIAMD Program is uniquely structured to enable the development of an overarching SoS/Integrated Fires capability with all participating Department of War (DoW) Air Defense Artillery (ADA) components functioning interdependently to provide total operational capabilities not achievable by the individual element systems. This funding will optimize effort to modernize air defense systems under an Integrated Fires architecture to manage and defend the battlespace in a joint environment against complex threats using the Integrated Battle Command System (IBCS) as the centerpiece. The AIAMD program achieves this objective by establishing the AIAMD SoS architecture and developing (1) the IAMD Battle Command Systems (IBCS) Engagement Operations Center (EOC) to provide the common Mission Command capability, (2) the Integrated Fire Control Relay capability for fire control connectivity and distributed operations, and (3) the common Plug and Fight (P&F) Kits to network-enable multiple sensor and weapon components including the IBCS EOC.
- Product Development
- Test and Evaluation
Remote Interceptor Guidance (RIG) 360 Dev and Int — one RDT&E project inside PE 0605457A. Congressional marks are recorded on the program element, not on a project.
Project SS1 — Remote Interceptor Guidance (RIG) 360 Dev and Int — requests $39.0M in FY2027, 31% of the $126.6M requested for program element 0605457A. Year over year it falls 66% against FY2026.
Project SS1 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 73.3 |
| FY2026 | Enacted | 113.9 |
| FY2027 | Request | 39.0 |
| FY2028 | Outyear | 16.4 |
| FY2029 | Outyear | 0.5 |
| FY2030 | Outyear | 0.5 |
| FY2031 | Outyear | 0.5 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Complete development of RIG 360 uplinker for PAC3/MSE interceptors. Receive Qualification Units to support testing. Conduct activities in support of RIG 360 PAC3/MSE Uplinker to include Operational Assessment and Milestone C. Ship initial RIG 360 developmental units to GUAM to support early operational capability.
Read the FY2027 plan →Conduct operational testing of RIG 360 for PAC3/MSE Uplinker capability through Integrated Fires Test Campaign
Named performers on project SS1
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project SS1 buys
This funding line is directly aligned to the U.S. Army Air and Missile Defense (AMD) Modernization Priority. The Army Integrated Air and Missile Defense (AIAMD) program is a designated Major Defense Acquisition Program (MDAP), a critical component of the Army's AMD strategy, and is a top AMD Cross Functional Team modernization priority program. Remote Interceptor Guidance 360 (RIG-360) is a software-defined, X-band missile communications device that provides full hemispherical, 360-degree in-flight communications with IAMD Composite Task Force interceptors including the PATRIOT Advanced Capability 3 (PAC-3) family of interceptors. The RIG-360 adds capability to the AIAMD architecture by unlocking the full kinematic potential of the PAC-3 family of interceptors providing full 360-degree coverage against attacking non-ballistic threats. The system expands the Warfighter's area of control and increases AMD effectiveness. RIG's 360-degree engagement capability leverages sensors integrated within the IBCS architecture and integrates an interceptor datalink device as a network component advancing IAMD goals of pairing any sensor with best shooter. The RIG-360 consists of two Major End Items, the Control Assembly and Array Assembly. The Control Assembly, in a rack mounted case, is the control node for the Array Assembly and serves as the Adaptation Kit (A-Kit) to the Integrated Fire Control Network. The rack mounted case provides outer ruggedness to environmental conditions with internal shock isolation, while allowing easy interchange of power supplies, server components, or other components as required within an industry standard rack assembly. The RIG-360 Array Assembly is a mast-mounted, X-band array of antennas that transmit and receive the interceptor radio frequency PAC-3 missile communication waveforms. FY 2027 Funds in the amount of $39.030 million supports completion of RIG 360 development and conduct of IOTE in support of a FY 2027 Milestone C decision.
- Management Services
- Product Development
- Test and Evaluation