Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $175.4M for Indirect Fire Protection Capability Inc 2 - Block 1 under RDT&E program element 0605052A, down 28% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 135.8 |
| FY2026 | Enacted | 243.1 |
| FY2027 | Request | 175.4 |
| FY2028 | Outyear | 237.5 |
| FY2029 | Outyear | 225.5 |
| FY2030 | Outyear | 158.2 |
| FY2031 | Outyear | 94.2 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
2 projects roll up into PE 0605052A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -28% overall, which can hide much larger swings below.
IFPC Increment 2 - Block 1
IFPC is funded on 5 lines across 2 appropriations
This page shows $175.4M of IFPC, 9.7% of the program's $1.80B FY2027 request. The rest is appropriated elsewhere.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| INDIRECT FIRE PROTECTION CAPABILITY INC 2-I | Procurement | Army | 1,626.0 |
| IFPC High Power Microwave (HPM) | RDT&E | Army | — |
| IFPC High Energy Laser | RDT&E | Army | — |
| IFPC total | Army | 1,801.4 |
Lines whose title names the program. 8 further lines only mention IFPC in their justification text — those fund something else and are deliberately excluded from the total.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 14% | 25.3 |
| Other / unspecified | 86% | 150.0 |
| FY2027 request | 100% | 175.4 |
Mission & acquisition strategy
This funding line is directly aligned to the Army Air and Missile Defense Modernization Priorities. Project EY7 / IFPC Increment 2 (IFPC Inc 2) - Block 1 will provide a ground-based weapon system designed to acquire, track, engage, and defeat subsonic Cruise Missiles (CM), and Unmanned Aircraft Systems (UAS) threats. The IFPC Inc 2 system consists of a launcher, AIM-9X interceptor, and AUR-M integrated with the Army Integrated Air and Missile Defense (AIAMD) open systems architecture, IAMD Battle Command System (IBCS), and the Sentinel sensor to support the CM and UAS defeat mission.
In support of the Army's enduring Cruise Missile Defense requirement, the Army utilized an MTA RP approach to evaluate new capability and provide an initial capability. In support of the IFPC Inc 2 solution, the Army pursued a competitive strategy that saw industry participating in a "Shoot Off" demonstration in FY 2021 using industry's proposed launcher and missile solutions integrated with the Army's IBCS and Sentinel radar. The Army evaluated industry's proposals informed by models and simulations, hardware-in-the-loop, and live fire data, to make a best value recommendation to proceed to a single vendor to deliver the IFPC Inc 2 prototype solution. The Army awarded a Firm Fixed Price Other Transaction Authority (OTA) agreement to Dynetics, Inc.
- Management Services
- Product Development
- Support
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what SETA / Matrix has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0605052A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksIFPC Increment 2 - Block 2 — one RDT&E project inside PE 0605052A. Congressional marks are recorded on the program element, not on a project.
Project EY8 — IFPC Increment 2 - Block 2 — requests $140.3M in FY2027, 80% of the $175.4M requested for program element 0605052A. Year over year it grows 12% against FY2026.
Project EY8 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 28.3 |
| FY2026 | Enacted | 125.0 |
| FY2027 | Request | 140.3 |
| FY2028 | Outyear | 208.8 |
| FY2029 | Outyear | 206.6 |
| FY2030 | Outyear | 140.2 |
| FY2031 | Outyear | 76.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Continue technology design and integration phase with up to two vendors supporting development efforts - Continue to support integration of 2nd Interceptor with IBCS command and control and the IFPC Inc 2 launcher with up to two vendors - Continue development and integration of components to support HWIL test and evaluation scheduled…
Read the FY2027 plan →Named performers on project EY8
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project EY8 buys
This funding line is directly aligned to the Army Air and Missile Defense Modernization Priority. The IFPC Increment 2 (Inc 2) - Block 2 (IFPC 2nd Interceptor program) supports the Air and Missile Defense modernization priorities. The IFPC 2nd Interceptor will provide increased capability against advanced threats, to include in priority order, supersonic cruise missiles, groups 2 and 3 Unmanned Aircraft Systems (UAS) at extended ranges and Large Caliber Rockets (LCR). IFPC 2nd Interceptor retains capability against subsonic cruise missiles and fixed and rotary wing aircraft. The IFPC 2nd Interceptor consists of an All Up Round-Magazine (AUR-M) with interceptors integrated onto the IFPC Inc 2 launcher and with the Army Integrated Air and Missile Defense (AIAMD) open systems architecture, IAMD Battle Command System (IBCS), and the Sentinel sensor. In FY 2027, funding will be used to support the prototype hardware development, integration, and demonstration of the IFPC 2nd Interceptor capability with up to two vendors.
- Management Services
- Product Development
- Support
- Test and Evaluation
IFPC Increment 2 - Block 1 — one RDT&E project inside PE 0605052A. Congressional marks are recorded on the program element, not on a project.
Project EY7 — IFPC Increment 2 - Block 1 — requests $35.1M in FY2027, 20% of the $175.4M requested for program element 0605052A. Year over year it falls 70% against FY2026.
Project EY7 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 107.5 |
| FY2026 | Enacted | 118.1 |
| FY2027 | Request | 35.1 |
| FY2028 | Outyear | 28.7 |
| FY2029 | Outyear | 18.9 |
| FY2030 | Outyear | 18.1 |
| FY2031 | Outyear | 17.8 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Complete delta qualification testing and delta developmental testing - Support the Integrated Fires Test Campaign to test and evaluate IFPC Inc 2 operation within the Army's Integrated Air and Missile Defense architecture - Conduct product improvements following IOT&E which includes continuing software development, system…
Read the FY2027 plan →- Continue to provide an IFPC Directed Energy team to facilitate the Army Rapid Capabilities and Critical Technologies Office (RCCTO) with the transition of the Directed Energy capabilities to programs of record, as well as determine IFPC Inc 2 Product Office requirements for IFPC HEL and IFPC HPM
Named performers on project EY7
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project EY7 buys
This funding line is directly aligned to the Army Air and Missile Defense Modernization Priority. The Indirect Fire Protection Capability Increment 2 (IFPC Inc 2) - Block 1 will provide a ground-based weapon system designed to acquire, track, engage, and defeat Cruise Missiles (CM), and Unmanned Aircraft Systems (UAS) threats. The IFPC Inc 2 system consists of a launcher and interceptor integrated with the Army Integrated Air and Missile Defense (AIAMD) open systems architecture, IAMD Battle Command System (IBCS), and the Sentinel sensor to support the Threshold CM and UAS defeat mission. In FY 2025, IFPC Inc 2 successfully transitioned from a Middle Tier of Acquisition (MTA) Rapid Prototyping (RP) effort to MTA Rapid Fielding (RF). The total cost estimate of the IFPC Inc 2 MTA RF effort is $1,394.6 million, including RDT&E ($219.3 million) and procurement ($1,175.3 million). The remainder of the IFPC Inc 2 MTA RF effort is fully funded. FY 2027 funds will continue support of product improvement following Initial Operational Test & Evaluation (IOT&E), and completion of delta developmental test (DT).
- Management Services
- Product Development
- Support
- Test and Evaluation