RDT&E Program Element · President's Budget PB2027

Future Vertical LIFT (maritime Strike)

PE 0604292N·U.S. Navy·Approp. 1319 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$5.3M
Navy · RDT&E
HitchAI read

U.S. Navy funding falls 25% to a $5.3M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. NAWC AD leads the industry work.

FY2027 Request
$5.3M
▼ 25% vs FY2026
FY2026 Enacted
$7.1M
▲ 51% vs FY2025
FY2025 Actual
$4.7M
Prior year

For fiscal year 2027, the U.S. Navy is requesting $5.3M for Future Vertical LIFT (maritime Strike) under RDT&E program element 0604292N, down 25% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

04.7FY25ACTUAL7.1FY26ENACTED5.3FY27REQUEST5.5FY285.2FY295.2FY305.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.7
FY2026Enacted7.1
FY2027Request5.3
FY2028Outyear5.5
FY2029Outyear5.2
FY2030Outyear5.2
FY2031Outyear5.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0604292N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -25% overall, which can hide much larger swings below.

Project 2940

Future Vertical Lift (Maritime Strike)

$5.3MFY2027 request ▼ 25%
FY2025 actual$4.7M
FY2026 enacted$7.1M
FY2027 request$5.3M
Product DevelopmentSupportManagement Services

The Future Vertical Lift (Maritime Strike) (FVL (MS)) project directs developmental activities in support of the replacement of the current inventory of Navy helicopters in the 2040+ timeframe. Specific development activities required for FVL (MS) may include: capability requirements analysis, documentation, and validation; completion of affordability studies; establishment of program infrastructure in the appropriate security environments (e.g. computers, an Integrated Development Environment, facilities, and administration); production of required acquisition documentation; Request for Proposal (RFP) development; technology and program risk reduction initiatives; design trade studies; and support to joint vertical lift initiatives, such as Modular Open System Approach (MOSA) reference and objective architectures for Flight Critical Avionics, Mission Systems, and Weapons systems, Crewed/Uncrewed Teaming technology development, air vehicle technology development, and shipboard integration into FVL(MS) prototyping initiatives. Follow-on activities include refinement of Modular Open Systems Approach (MOSA) reference and objective architectures; conduct air vehicle/mission systems Technology Maturation and Risk Reduction (TMRR) activities; and ultimately develop a new vertical lift Navy aircraft in the Engineering and Material Development acquisition phase. Activities and technologies may be leveraged for sustainment and modernization of legacy Navy helicopters. These efforts will enable timely development of a system that provides best value and capability to the Joint Warfighter while maintaining effective and efficient war fighting capability in support of the Navy's 15-year Aviation Plan and 30-year Shipbuilding Plan. FY 2027 budget funds FVL (MS) pre-Milestone A activities to include analysis, studies, and development of acquisition documentation. Tasks to be performed may include acquisition program management functions, engineering modeling analysis, conceptual design trade studies, and other related follow-on activities.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FVL (MS) Requirements Definition and Acquisition Documentation▼ 25%
FY2025 actual$4.7M
FY2026 enacted$7.1M
FY2027 request$5.3M

FY2027 planned work Continuation of pre-Milestone A activities to include analysis, studies, and production of acquisition documentation. MS-A supporting documents may include but are not limited to: an Acquisition Strategy (AS), Capabilities Development Document (CDD), Developmental CONOPs, Life Cycle Cost Estimate (LCCE), Life Cycle Sustainment Plan (LCSP) and Systems Engineering Plan (SEP). The FVL (MS) program will support MOSA objective architecture efforts.

FY2026 to FY2027 change FY 2026 to FY 2027 funding decreases by $1.811M is due to the realignment of funds for higher Navy priority requirements.

FY2026 plans — current year Continuation of pre-Milestone A activities to include analyses, studies and production of acquisition documentation. Tasks to be performed may include acquisition program management functions, engineering modeling and analysis, system specification and Draft CDD and CONOPs development, design trade studies and prototyping, virtual simulation, conceptual design of Air Vehicle, Avionics, Propulsion and Dynamics, Communications and Navigation, Weapons and Fire Control, Human Systems Integration, Survivability and Vulnerability, Missions and Missions Systems Management, Reliability and Maintainability, Training, Logistics, Sensor, Pilotage and Targeting Systems, VMS/Flight Control…

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$5.3M
House NDAA (HASC)HASC
$5.3M full · +$0
Senate NDAA (SASC)SASC
$5.3M full · +$0
House Approps (HAC-D)HAC_D
$5.3M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

NAWC AD
$2.3M · 44%
Government Engineering Support
Where FY2027 funding flowsShare$M
Industry primes44%2.3
Other / unspecified56%3.0
FY2027 request100%5.3
See NAWC AD's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Future Vertical Lift (Maritime Strike) (FVL (MS)) project directs developmental activities in support of the replacement of the current inventory of Navy helicopters in the 2040+ timeframe. Specific development activities required for FVL (MS) may include: capability requirements analysis, documentation, and validation; completion of affordability studies; establishment of program infrastructure in the appropriate security environments (e.g.

The AoA was completed in 1QFY2023 and identified the need for an improved FVL (MS) Family of Systems (FoS) to respond to the future threat environment, resulting in a recommendation for pre-Milestone A efforts and a Milestone A entry. Limited pre-Milestone A efforts began in FY 2024. The Navy's Gate 2 Review was completed in 2QFY2025. The Gate 2 Decision identified the preferred alternatives of an Optionally Crewed Single Main Rotor Helicopter or maximally common Crewed and Uncrewed Single Main Rotor Helicopters. The preferred alternative is to leverage a common avionics and mission systems architecture using a MOSA for program risk reduction and cost efficiency.

Project 2940 — Future Vertical Lift (Maritime Strike)
  • Product Development
  • Support
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what NAWC AD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604292N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Future Vertical LIFT (maritime Strike) (PE 0604292N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604292N
Machine access
Markdown twin /programs/0604292N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks