RDT&E Program Element · President's Budget PB2027

F-47

PE 0207110F·U.S. Air Force·Approp. 3600 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$5.04B
⚑ Contested — House cuts 1.3%
HitchAI read

U.S. Air Force funding ramps 65% to a $5.04B request in FY2027, before stepping down 41% across the five-year plan. In the FY2027 defense authorization, the House cut 1.3% (to $4.97B); the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$5,037.9M
▲ 65% vs FY2026
House mark
$4,971.5M
▼ $66.4M vs request
FY2026 Enacted
$3,053.1M
In law

For fiscal year 2027, the U.S. Air Force is requesting $5.04B for F-47 under RDT&E program element 0207110F, up 65% over FY2026. In the FY2027 defense authorization, House moved to cut it to $4.97B.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1,5003,0004,50000.0FY25ACTUAL3,053.1FY26ENACTED5,037.9FY27REQUEST5,253.1FY284,122.7FY293,293.9FY302,952.6FY31HOUSE
Actual Enacted Request Outyear (FYDP) House mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted3,053.1
FY2027Request5,037.9
FY2028Outyear5,253.1
FY2029Outyear4,122.7
FY2030Outyear3,293.9
FY2031Outyear2,952.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0207110F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 65% overall, which can hide much larger swings below.

Project 656009

F-47

$5,037.9MFY2027 request ▲ 65%
FY2025 actual$0.0M
FY2026 enacted$3,053.1M
FY2027 request$5,037.9M
Product DevelopmentManagement Services

F-47 enables Air Superiority for the Joint Force in the most challenging operational environments. Key F-47 attributes include enhancements to survivability, lethality, persistence, crewed/uncrewed teaming and interoperability across a range of military operations. Program activities include the employment of digital acquisitions through the application of digital engineering, agile software development, open systems architectures and digital systems infrastructure as well as the design, build, and test of full weapon systems with supporting elements. Funding provides for operational concept exploration, technology studies, multi-domain integration assessments, operational and system architecture development, maturation/risk reduction, prototyping, and Engineering and Manufacturing Development (EMD) of F-47 and related technologies. These technologies include autonomy, weapon systems, mission systems, government reference architectures for standards and interfaces, terrestrial systems, training, product support, integrated system concept development and demonstration, as well as activities for full weapon system design, build, test, and program management support. Program management support costs include, but are not limited to, contractor support services, civilian pay, supplies, and facility related expenses. F-47 technologies are available to other Department of War (DoW) systems based on emerging threats, AF priorities, and development capacity. The FY 2026 spend plan amount for Research, Development, Test, and Evaluation includes $3,053,053 thousand of discretionary and $400,000 thousand of mandatory (reconciliation) for a total of $3,453,053 thousand. Funding may be utilized to implement innovation insertion, capability insertion, software increments, spiral upgrades, modular component swaps, and other insertions consistent with Modular Open System Architecture. Funding may be utilized to design, develop, integrate, and test weapon system and/or component level open architectures. Funding may be utilized to fund the concept refinement, design, development, integration, and testing of interdependent technologies and common architectures that underpin weapon system and portfolio-wide mission outcomes. Funding may be used to resolve Diminishing Manufacturing Sources and Material Shortages (DMSMS) and/or obsolescence issues.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
F-47▲ 97%
FY2025 actual$0.0M
FY2026 enacted$2,553.1M
FY2027 request$5,037.9M

Continue to develop, integrate, build, and test F-47 aircraft during EMD and associated lab infrastructure design and build. Other program activities include the pursuit of open architecture solutions and the design, build, and test of components and full weapon systems. The F-47 program will continue to conduct analyses, perform concept…

Read the FY2027 plan →
Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$5,037.9M
House NDAA (HASC)HASC
$4,971.5M −$66.4M · −1.3%
Senate NDAA (SASC)SASC
$5,037.9M full · +$0
House Approps (HAC-D)HAC_D
$5,037.9M full · +$0
▲ $66.4M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%5,037.9
FY2027 request100%5,037.9
Program detail

Mission & acquisition strategy

F-47 enables Air Superiority for the Joint Force in the most challenging operational environments. Key F-47 attributes include enhancements to survivability, lethality, persistence, crewed/uncrewed teaming and interoperability across a range of military operations. Program activities include the employment of digital acquisitions through the application of digital engineering, agile software development, open systems architectures and digital systems infrastructure as well as the design, build, and test of full weapon systems with supporting elements.

The F-47 (formerly Next Generation Air Dominance) acquisition strategy is based on a top-down, multi-domain capabilities development planning and oversight framework. Cross-functional teams will conduct analysis, demonstrations, and experiments to quantify the operational value of alternative concepts and technologies to provide solutions to current and future air superiority capability gaps. Additional details on the acquisition strategy cannot be provided at this classification level.

Project 656009 — F-47
  • Product Development
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0207110F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "F-47 (PE 0207110F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0207110F
Machine access
Markdown twin /programs/0207110F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks