Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $38.8M for Advanced Technology and Sensors under RDT&E program element 0604257F, down 5.0% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 15.9 |
| FY2026 | Enacted | 40.8 |
| FY2027 | Request | 38.8 |
| FY2028 | Outyear | 10.7 |
| FY2029 | Outyear | 8.7 |
| FY2030 | Outyear | 8.9 |
| FY2031 | Outyear | 8.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
2 projects roll up into PE 0604257F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -5% overall, which can hide much larger swings below.
Imaging and Targeting Support
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Other / unspecified | 100% | 38.8 |
| FY2027 request | 100% | 38.8 |
Mission & acquisition strategy
The Advanced Technology and Sensors (ATS) Program Element (PE) coordinates the development, validation, test, and transition of platform-agile advanced sensor technologies (sensors, processing algorithms, automated target recognition software, multi-intelligence fusion). These activities support crewed and uncrewed airborne reconnaissance platforms, autonomous collaborative platforms, Collaborative Combat Aircraft (CCA), and other Air Force platforms (OAFPs) whose capabilities are protected at a higher classification.
NGS-RR activities will leverage parallel development activities and integrate them with a risk-informed approach to develop and demonstrate capabilities that meet military needs under operationally-relevant environments and conditions. This project has established a forum of stakeholders consisting of multiple Other Government Agencies (OGAs), end-users, and Major Commands (MAJCOMs) to ensure that the project deliverables answer identified warfighter needs and have a clear and concise technology transition path. Resolute Sentry is Software Acquisition Pathway designated project. The Minimum Viable Product (MVP) will be version 4.5 release of Resolute Sentry in Q4 FY 2026.
- Product Development
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604257F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksNext Gen Sensors Tech Maturation/Risk Reduction — one RDT&E project inside PE 0604257F. Congressional marks are recorded on the program element, not on a project.
Project 642001 — Next Gen Sensors Tech Maturation/Risk Reduction — requests $38.8M in FY2027, 100% of the $38.8M requested for program element 0604257F. Year over year it grows 30% against FY2026.
Project 642001 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 8.1 |
| FY2026 | Enacted | 29.9 |
| FY2027 | Request | 38.8 |
| FY2028 | Outyear | 10.7 |
| FY2029 | Outyear | 8.7 |
| FY2030 | Outyear | 8.9 |
| FY2031 | Outyear | 8.6 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Will demonstrate inoperability with Sensing for Asset Protection using Integrated Electronic Network Technology (SAPIENT), a "FIVE EYES" and NATO sense-making standard. - Will complete a hybrid transition of Birdbox with AFRL. - Will demonstrate completed integration of initial NAVAIR ATRs into Birdbox. - Will demonstrate Collaborative…
Read the FY2027 plan →- Will continue DevSecOps and Digital Engineering environment. - Will continue operating government software integration lab. - Will continue update software design materials and technical data package for transition partners. - Will develop and deliver Minimum Viable Capability Release (MVCR).
Read the FY2027 plan →What project 642001 buys
The NGS-RR project is a platform-agile suite of sensor and software development and demonstration technologies designed to maximize flexibility and capability for an ever-changing scale of ISR missions. NGS-RR furthers maturation and risk reduction of select technologies initiated under I&TS and other low TRL maturation efforts culminating in operational prototype demonstrations. The power behind the NGS-RR project is an open architecture system design that enables rapid third-party software and line replaceable unit insertion/replacement. NGS-RR implements foundational sensor development technologies including the MEDUSA flight demonstration platform, and the AURORA software environment and repository. NGS-RR incorporates all of the metrics learned through the flight demonstrations into the Whole-system Analysis & Simulation Portal (WASP), a web-based digital engineering catalog and analysis tool launching on JWICS in FY26. In FY 2027, NGS-RR will continue flight testing maturing ATRs and fully integrated podded payloads, integration of maturation of NAVAIR algorithms, and other maritime automated target recognition algorithms and support collaborative teaming demonstrations. Demonstrations include, but are not limited to, capabilities developed with funding in the I&TS project, Airborne SIGINT Enterprise PE (0304260F), and Airborne Reconnaissance Systems (ARS) PE (0305296F). Additionally, Resolute Sentry transitioned from the AF Research Laboratory to NGS-RR for technical maturation and integration into the first operational platform in FY 2026. Resolute Sentry is an AI-driven, multi-platform, sense-making tool for predictive analytics and orchestration at the tactical edge. It provides real-time, high-quality detection, identification and tracking to close kill chains and predict adversary activity. The effort delivers a platform-agnostic, edge-hostable software solution to ingest and fuse multi-INT data across multiple platforms at the tactical edge. The data will then be used to generate actionable information on the highly contested environment for Blue Force commanders and national decision making. Resolute Sentry will execute in ATS from FY 2026 to FY 2027, then will transition to ARS PE (0305206F) in FY 2028.
- Product Development
- Management Services
Imaging and Targeting Support — one RDT&E project inside PE 0604257F. Congressional marks are recorded on the program element, not on a project.
Project 644818 — Imaging and Targeting Support — requests $0.0M in FY2027, 0.0% of the $38.8M requested for program element 0604257F. Year over year it falls 100% against FY2026.
Project 644818 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 7.7 |
| FY2026 | Enacted | 10.9 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Develop, modernize, and demonstrate lower TRL efforts into transition ready efforts. The following FY 2024 and FY 2025 efforts are continuing into FY 2026: - FY 2024 effort completions: Collaborative Teaming, BirdBox Resolute (BB8) . - FY 2025 effort continuations and completion: ATRIUM. - FY 2026 initiation and completion: TALON…
What project 644818 buys
The I&TS project matures low TRL sensors and processing capabilities to rapidly fill current GEOINT sensing capability gaps. To ensure alignment with Congressional intent, urgent CCMD requirements, and departmental priorities, the Air Force (AF) established a Headquarters level working group to guide, prioritize, and synchronize these enterprise sensor technology investments. The GEOINT Capabilities Working Group (GCWG) reviews developmental technologies in the fourth quarter of each FY to approve and prioritize efforts for the following year. The Program Office is specifically structured to rapidly initiate efforts in the execution year to expedite technical maturation and delivery to operational platforms at the speed of technology. In FY 2025, I&TS transitioned 3 efforts (GMTI mode, AIR, RUBBER DUCKIE) to an OAFP. In FY 2026, I&TS will complete development of 2 FY 2024 efforts (BB8, Collaborative Teaming), continue development of 1 FY 2025 effort (ATRIUM) and begin 4 new efforts (TALON CEREBRAL, AIR for SAR, ABBA, and RESOLUTE MINIONS). Details of the FY 2026 efforts are available upon request at the appropriate classification levels. In FY 2027, I&TS will use remaining funds to complete all ongoing efforts. I&TS project funds are distributed to efforts based on the development priorities established by the GCWG. The Program Office initiates efforts based on priority as Budget Authority is released in the execution year. If funding is made available, GCWG selected efforts based on the identified focus areas, transition partners, and available budget will be scheduled. These efforts will be selected in July of FY 2026. The FY 2026 focus areas are: increase cooperative sense-making capabilities for fielded sensors to extend range, improve fidelity, reduce bandwidth, and reduce latency to end users; develop scalable, modular, meshed, and low Size, Weight, Power, and Cost (SWaP-C) sensors that meet current Department and IC interoperability standards; develop Air Moving Target Indicator (AMTI) and Maritime MTI (MMTI) capabilities with incorporated Automatic Target Recognition (ATR) and low-bandwidth data sharing through existing communication infrastructure, prioritizing group 1-3 UAS.
- Product Development
- Management Services